• Title/Summary/Keyword: Evacuation Safety Design

Search Result 166, Processing Time 0.023 seconds

Measurement of the Device Properties of Photoelectric Smoke Detector for the Fire Modeling (화재모델링을 위한 광전식 연기감지기의 장치물성 측정)

  • Cho, Jae-Ho;Mun, Sun-Yeo;Hwang, Cheol-Hong;Nam, Dong-Gun
    • Fire Science and Engineering
    • /
    • v.28 no.6
    • /
    • pp.62-68
    • /
    • 2014
  • The high predictive performance of fire detector models is essentially required for the reliable design of evacuation safety using the fire modeling. The main objective of the present study is to measure input information in order to predict the accurate activation time of photoelectric smoke detector adopted in fire dynamics simulator (FDS) recognized a representative fire model. To end this, the fire detector evaluator (FDE) which could be measured the device properties of detector was used, and the input information of Heskestad and Cleary's models was obtained for a spot-type photoelectric smoke detector. In addition, the activation times of smoke detector predicted using default values into FDS and measured values in the present study were quantitatively compared. As a result, the Heskestad model could result in an inaccurate the activation time of photoelectric smoke detector compared to the Cleary model. In addition, there was a distinct difference between the default values used into FDS and the measured values in terms of device properties of smoke detector, and thus the activation time also showed a significant difference.

Selection of Retaining Wall System for Underground Parking Lots Expansion of Apartments (거주중 공동주택의 지하주차장확대를 위한 흙막이공법 선정)

  • Ro, Young-Chang;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.99-107
    • /
    • 2008
  • Rapidly increasing automobile supply rate according to improved economic level of life makes lack of parking space of apartments. Even though the initial design of parking space compiled with old regulations, it may not observe either new laws or requirement of inhabitants. Even if old apartments have no structural durability problem, outworn facilities and insufficient parking area may be a main reason for reconstruction. It causes waste of national resources and makes recycling issues. Additionally, irregularly parked cars make traffic obstruction to a fire engine and result in many fire accident victims. Parking problems of apartments are not only inconvenience but also serious safety issues. From these points of view, remodeling only for parking area expansion is necessary to avoid overall reconstruction of apartments. The purpose of this study is to suggest a retaining wall selection method for apartments underground parking lots expansion without evacuation of resident people. Effect factors to select retaining wall system are analyzed and weight values are calculated by applying AHP. One selection method of retaining wall is proposed by evaluating applicability and its sensitivity analysis is executed. This selection method is expected to help decision-making of retaining wall system selection.

A Study on the Scope of the Recognized Equity Capital of Developer in Real Estate Project Finance Loan Screening (부동산 PF를 위한 시행사의 자본금 인정범위에 관한 연구)

  • Lim, Suhong;Jang, Hokwan;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.75-83
    • /
    • 2020
  • This study intends to explore the scope of the recognized equity capital of developer in real estate project finance loan screening. The factors which can be recognized as equity capital are categorized into 24 factors with 3 upper categories and 6 mid categories. In order to develop the importance weight of factors, AHP and Fuzzy methodologies are implemented based on survey analysis by experts in financial institutions. Research findings indicate that the land cost, evacuation cost, and real estate acquisition tax as land-related direct costs, and the design cost, traffic impact assessment cost, underground safety impact assessment cost, boundary surveying cost, and geological survey cost as the construction permit-related costs are higher than any others. On the other hand, the supplementary costs related to the operation of the developer show very low importance weight. Accordingly, the hierarchy of factors for equity capital should be clearly developed in order to minimize any dispute and prevent non-performing loans to real estate project finance.

Prediction of Occupant Load Density using People Counting System in Discount Stores (무인계수시스템을 이용한 대형할인점의 재실자밀도 예측)

  • Seo, Dong-Goo;Hwang, Eun-Kyoung
    • Fire Science and Engineering
    • /
    • v.31 no.6
    • /
    • pp.53-59
    • /
    • 2017
  • The purpose of this study is to verify the suitability of the current standards by predicting the density of the occupant load density for discount stores. An internal data survey as well as an actual survey using a People Counting System (PCS) were employed to ascertain the number of occupants and 95% confidence interval of nationwide discount stores. According to the results of the actual survey, the time and days on which the maximum number of occupants were reached was from 16:00 to 18:00 and Christmas Eve and the weekend before New Year's Day, respectively. From the results of the maximum number of occupants, a regression equation was derived from the relationship between the internal data and the amount of sales, and this equation was verified in a previous study. Thus, the internal data of 50 discount stores were analyzed using this process. As a result, the 95% confidence interval was determined to be $2.7{\sim}2.9m^2/pers.$ and the error level was not large compared to the domestic and foreign standards. Therefore, this study proposes that a conservative estimate of the standard occupant load density for discount stores is $2.7m^2/pers.$

A Study on the Adequacy Evaluation of Criteria of Occupant Load Density in School Classrooms (학교 교실의 재실자밀도 기준 적정성 평가에 관한 연구)

  • Seo, Dong-Goo;Hwang, Eun-Kyoung
    • Fire Science and Engineering
    • /
    • v.32 no.6
    • /
    • pp.134-140
    • /
    • 2018
  • This study examined the adequacy of a school classroom's occupant load density standard to cope with the issues associated with the decreasing number of students and regional variations. Therefore, this study analyzed the occupant load density standards of kindergarten, elementary school, middle school, high school, and universities using the data open to the public by the Ministry of Education. The results revealed a high variance in the occupant load density according to the school type. The median values were 1.49, 3.45, 2.64, 2.45, and $3.41m^2/person$ for kindergarten, elementary school, middle school, high school, and universities, respectively. Although the occupant load density was higher than the current standard ($1.9m^2/person$), except for kindergarten, the present standard did not need to be improved immediately, considering the purpose of calculating the maximum occupancy. On the other hand, if improvements are made in line with other enhancements of a national education policy, it will be possible to mitigate the measure to $2.5m^2/person$ based on the survey results.

A comparative study of risk according to smoke control flow rate and methods in case of train fire at subway platform (지하철 승강장에서 열차 화재 시 제연풍량 및 방식에 따른 위험도 비교 연구)

  • Ryu, Ji-Oh;Lee, Hu-Yeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.4
    • /
    • pp.327-339
    • /
    • 2022
  • The purpose of this study is to present the effective smoke control flow rate and mode for securing safety through quantitative risk assessment according to the smoke control flow rate and mode (supply or exhaust) of the platform when a train fire occurs at the subway platform. To this end, a fire outbreak scenario was created using a side platform with a central staircase as a model and fire analysis was performed for each scenario to compare and analyze fire propagation characteristics and ASET, evacuation analysis was performed to predict the number of deaths. In addition, a fire accident rate (F)/number of deaths (N) diagram (F/N diagram) was prepared for each scenario to compare and evaluate the risk according to the smoke control flow rate and mode. In the ASET analysis of harmful factors, carbon monoxide, temperature, and visible distance determined by performance-oriented design methods and standards for firefighting facilities, the effect of visible distance is the largest, In the case where the delay in entering the platform of the fire train was not taken into account, the ASET was analyzed to be about 800 seconds when the air flow rate was 4 × 833 m3/min. The estimated number of deaths varies greatly depending on the location of the vehicle of fire train, In the case of a fire occurring in a vehicle adjacent to the stairs, it is shown that the increase is up to three times that of the vehicle in the lead. In addition, when the smoke control flow rate increases, the number of fatalities decreases, and the reduction rate of the air supply method rather than the exhaust method increases. When the supply flow rate is 4 × 833 m3/min, the expected number of deaths is reduced to 13% compared to the case where ventilation is not performed. As a result of the risk assessment, it is found that the current social risk assessment criteria are satisfied when smoke control is performed, and the number of deaths is the flow rate 4 × 833 m3/min when smoke control is performed at 29.9 people in 10,000 year, It was analyzed that it decreased to 4.36 people.