• 제목/요약/키워드: Estimation of wasteload

검색결과 2건 처리시간 0.015초

수질오염총량관리 계획수립의 개선방안에 관한 연구 (A Study on the Improvement Scheme of the Total Water Pollution Load Management Plan)

  • 김영일;이상진
    • 한국물환경학회지
    • /
    • 제22권6호
    • /
    • pp.977-981
    • /
    • 2006
  • In order to improve water quality in drinking water sources, Ministry of Environment (MOE) was implemented total water pollution load management (TWPLM) in all the major river basins. From the experience of the application of TWPLM, we could find some problems relating the target watershed, standard operating procedure (SOP) of establishment and implementation plan, water quality and flow rate, design flow, water quality model, margin of safety (MOS), and estimation of wasteload were found. The authors were reviewed ongoing TWPLM and presented the improvement schemes for a successful TWPLM. For the application of these suggestions, further detailed studies should be done to implement TWPLM in the future.

유역경계 추출을 위한 DEM별 전처리 방법과 격자크기 분석 (Preprocessing Methods and Analysis of Grid Size for Watershed Extraction)

  • 김동문
    • 한국측량학회지
    • /
    • 제26권1호
    • /
    • pp.41-50
    • /
    • 2008
  • 최근 지형정보 취득을 위한 다양한 신기술의 개발로 수치지도, LiDAR(Light Detection And Ranging), 고해상도 위성영상 등의 Digital Elevation Model(DEM) 자료원이 다양해졌다. 이러한 DEM은 효율적인 유역관리를 위해 수문지형 특성인자 추출에 필요한 주요 자료원이다. 특히 DEM을 이용한 유역 추출은 최근의 오염총량관리 계획의 수립에 필요한 당해 지역의 수계환경자료조사, 오염원조사, 오 폐수량 및 오염부하량 산정, 수질모델링 등의 공간적 경계를 구분 짓는 매우 중요한 공간자료이다. 지금까지의 DEM을 이용한 유역추출 연구가 격자크기나 전처리 방법에 따른 인자추출이 주를 이뤘으나, 이 연구에서는 LiDAR와 수치지도를 통해 작성한 DEM별 격자크기와 전처리방법에 따른 유역 추출의 정확도를 분석하였으며, 2m 격자의 LiDAR DEM을 Agree burn으로 전처리한 것이 가장 적합한 것으로 나타났다.