Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction (공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측)

  • Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

Human Pose-based Labor Productivity Measurement Model

  • Lee, Byoungmin;Yoon, Sebeen;Jo, Soun;Kim, Taehoon;Ock, Jongho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.839-846
    • /
    • 2022
  • Traditionally, the construction industry has shown low labor productivity and productivity growth. To improve labor productivity, it must first be accurately measured. The existing method uses work-sampling techniques through observation of workers' activities at certain time intervals on site. However, a disadvantage of this method is that the results may differ depending on the observer's judgment and may be inaccurate in the case of a large number of missed scenarios. Therefore, this study proposes a model to automate labor productivity measurement by monitoring workers' actions using a deep learning-based pose estimation method. The results are expected to contribute to productivity improvement on construction sites.

  • PDF

Effects of Technology and Innovation Management and Total Factor Productivity on the Economic Growth of China

  • LEE, Jung Wan;XUAN, Ye
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.6 no.2
    • /
    • pp.63-73
    • /
    • 2019
  • The paper aims to investigate relationships between technology and innovation management, total factor productivity and economic growth in China. By comparing the trends in total factor productivity growth of industrialized economies (i.e. OECD), this study intends to showcase the importance of total factor productivity progress in the Chinese economy. The study employs time series data of an annual basis for the period from 1977 to 2016 retrieved from the World Development Indicator. The study employs unit root test, cointegration test, fully modified least squares estimation method, canonical cointegrating regression and dynamic least squares estimation method to test the hypotheses. The results of the cointegrating regression analysis show that manufacturing growth leads to an increase of total factor productivity in the short-run in China. The findings of the study suggest that manufacturing (i.e. technology and product innovation) is positively related to the increase of total factor productivity in the short-run and total output growth in the long-run. The findings suggest that promoting technology and innovation management and supporting R&D subsidies may reduce the marginal cost of conducting R&D and increase the rate of technology and innovation management and R&D activity and therefore, the total factor productivity growth rate.

Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis (생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발)

  • An, Soo-Bae;Ji, Seong-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.135-136
    • /
    • 2011
  • A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.

  • PDF

Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant (철골 공장가공의 생산성 및 공장간접비율 실태분석)

  • Kim, Kyoung-Won;Ahn, Bang-Ryul;Tae, Yong-Ho;Huh, Young-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

A Model for Software Maintenance Cost Estimation based on Productivity (생산성 기반의 소프트웨어 유지보수 대가산정 모델)

  • Bae, Joon-Soo
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.122-130
    • /
    • 2004
  • Since the cost of software maintenance occupies about 50~75% in a general successful organization, the software maintenance plays an important role in software life cycle. In particular, if the managed system needs to be operated in a long term or the system is very large and complex, then the maintenance is especially more important. Software maintenance is defined as software modification activities after customer delivery, such as improvement of performance or functionality, error correction, adaptation to environmental changes, etc. In this paper, software cost estimation models are proposed, that is based on productivity of manpower in maintenance projects. In order to do this, the activities of maintenance are classified into function change, non-function change, user support and application operation. The proposed models are constructed and verified based on the real size and cost information of projects in the real world. The approach in this paper is to discriminate the heterogeneous activities in maintenance projects, and then to calculate the respective cost of each discriminated activity. By using the proposed models, the total cost of maintenance project is summed from the costs of four activities. In addition the number of conflicts between owner and order receiver about the amount of cost will be reduced and the reasonable cost estimation system will be established.

The ecosystem modelling for enhancement of primary productivity in Kamak Bay (가모만에서의 기초생산력 향상방안에 관한 생태계모델링)

  • Lee, Dae-In;Jo, Eun-Il;Park, Cheong-Gil
    • Journal of Environmental Science International
    • /
    • v.8 no.5
    • /
    • pp.575-586
    • /
    • 1999
  • From the environmental aspects, primary productivity of phytoplankton plays the most improtant role in enhancement of marine culture oyster production. This study may be divided into two branches; one is estimation of maximum oyster meat production per unit facility(Carrying Capacity) under the present enviromental conditions in Kamak Bay, the other is improvement of carrying from increase of primary productivity by changing the environmental conditions that cause not ot form an unfavorable environment such as the formation of oxygen deficient water mass using the eco-hydrodynamic model. By simulation of three-dimensional hydrdynamic model and ecosystem model, the comparison between observed and computed data showed good agreement. The results of sensitivity analysis showed that phytoplankton maximum growth rate was the most important parameter for phytoplankton and dissolved oxygen. The estimation of mean primary productivity of Wonpo, Kamak, Pyongsa, and Kunnae culture grounds in Kamak Bay during culturing period were 3.73gC/$m^2$/d, 2.12gC/$m^2$/d, 1.98gC/$m^2$/d, and 1.26gC/$m^2$/d, respectively. Under condition not ot form the oxygen deficient water mass, four times increasing of pollutants loading as much as the present loading from river increased mean primary productivity of whole culture grounds to 4.02gC/$m^2$/d. Sediment N, P fluxes that allowed for 35% increasing from the present conditions increased mean primary productivity of whole culture grounds to 3.65gC/$m^2$/d. Finally, ten times increasing of boundary loadings from the present conditions increased mean primary productivity of whole culture grounds to 3.95gC/$m^2$/d. The maximum oyster meat production per year and that of unit facility in actual oyster culture grounds under the present conditions were 6,929ton and 0.93ton, respectively. This 0.93ton/unit facility is considered to be the carrying capacity in study area, and if the primary productivity is increased by changing the environmental conditions, oyster production can be increased.

  • PDF

MULTIPLE LINEAR REGRESSION APPROACH FOR PRODUCTIVITY ESTIMATION OF BULLDOZERS

  • Abbas Rashidi;Hoda Rashidi Nejad;Amir H. Behzadan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1140-1147
    • /
    • 2009
  • Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.

  • PDF

Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work (거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구)

  • Kang, Dong-Wan;Ji, Soung-Min;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.44-52
    • /
    • 2012
  • In the cost management of public construction projects, it is an important issue to develop an adequate cost data for estimating the predetermined amount by various methods. For a long time, a standard of estimation in korea is used as a basis for estimating the predetermined amount of public construction. However, they did not have a reasonable cost data based on a labor and equipment productivity analysis. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for more accurate cost data to use in an early phase. This study analyzed the productivity of form work by the CYCLONE model, and presented the model on the number of optimal labor through sensitivity analysis. This CYCLONE model can be useful in analyzing productivity on the various sizes of form. Also, the regression model to estimate the daily output can be used in predicting the amount of labor. Considering the work duration in the regression model is expected to make the daily output estimation much more accurate.