• Title/Summary/Keyword: Equipment cost

Search Result 1,704, Processing Time 0.078 seconds

Determining the Optimum Maintenance Period of the Steel Making Equipment Having Multiple Failure Types (다수의 고장유형을 갖는 제철설비의 최적 정비주기 산출)

  • Song, Hong-Jun;Jun, Chi-Hyuck
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.27-33
    • /
    • 2003
  • The maintenance cost in K Steelworks has been continuously increased in proportion to the production cost. However, there seems to be a possibility of reducing cost through the optimization of maintenance actions. The failure types of the equipment in steelworks ate various with different failure cost. Thus the failure rate and cost of each type of failures should be considered simultaneously when the optimum maintenance period is to be determined. It is considered that the equipment undergoes periodic replacement and a specified number of incomplete preventive maintenance actions are performed during a replacement period. Assuming that the time to failure follows a Weibull distribution, the parameters of the failure rate are estimated using the maximum likelihood estimation. The optimal replacement period is determined to minimize the average cost per unit time. As the result of analysis it is suggested that the existing maintenance period for a hot-rolling equipment can be extended significantly.

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

Effects of Reactor Type on the Economy of the Ethanol Dehydration Process: Multitubular vs. Adiabatic Reactors

  • Yoo, Kee-Youn
    • Korean Chemical Engineering Research
    • /
    • v.59 no.3
    • /
    • pp.467-479
    • /
    • 2021
  • Abstract: A kinetic model was developed for the dehydration of ethanol to ethylene based on two parallel reaction pathways. Kinetic parameters were estimated by fitting experimental data of powder catalysts in a lab-scale test, and the effectiveness factor was determined using data from pellet-type catalysts in bench-scale experiments. The developed model was used to design a multitubular fixed-bed reactor (MTR) and an adiabatic reactor (AR) at a 10 ton per day scale. The two different reactor types resulted in different process configurations: the MTR consumed the ethanol completely and did not produce the reaction intermediate, diethyl ether (DEE), resulting in simple separation trains at the expense of high equipment cost for the reactor, whereas the AR required azeotropic distillation and cryogenic distillation to recycle the unreacted ethanol and to separate the undesired DEE, respectively. Quantitative analysis based on the equipment and annual energy costs showed that, despite high equipment cost of the reactor, the MTR process had the advantages of high productivity and simple separation trains, whereas the use of additional separation trains in the AR process increased both the total equipment cost and the annual energy cost per unit production rate.

Methodology and Application of Avoided Cost Calculation for Natural Gas and District Heating DSM programs (천연가스.지역난방 수요관리 투자사업의 회피비용 산정기법 개발 및 적용)

  • Choi, Bong-Ha;Park, Sang-Yong;Lee, Deok-Ki;Park, Soo-Uk
    • IE interfaces
    • /
    • v.20 no.3
    • /
    • pp.353-362
    • /
    • 2007
  • This paper proposed the calculation method of the avoided cost for natural gas and district heating DSM programs. And the proposed method is applied to real DSM programs. The avoided cost for natural gas consists of commodity avoided cost, supply equipment avoided cost, storage equipment avoided cost, and electric power avoided cost. In case of the district heating, avoided cost consists of heat generation equipment avoided cost, heat energy avoided cost, environment avoided cost, and electric power avoided cost. This method can be used to evaluate the benefit of DSM programs quantitatively in cost. Therefore, this method can contribute to make the cost-effectiveness evaluation system and to operate the DSM programs for natural gas and district heating effectively.

Equipment replacement cost analysis within the construction industry

  • Oh, Hyun-Seung
    • Korean Management Science Review
    • /
    • v.8 no.1
    • /
    • pp.41-50
    • /
    • 1991
  • Within the current construction industry, constractor equipment management practices lack structure and often are not addressed through an economic analysis and evaluation process. This paper explores two areas...cost of capital and inflation...with the intention of providing insight for a more structured and economic based approach to contractor equipment replacement practices rather than by the traditional "rule of thumb".umb".uot;.

  • PDF

The Study on Items derived of Machine Equipment Construction Standards for Project Cost Savings (사업비 절감을 위한 기계설비 건설기준 개선 항목 도출에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Tae-Song
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.60-61
    • /
    • 2014
  • the reference values are high, because the Korean construction standards quote the foreign construction standars indiscriminately. Therefore ten experts were consulted to draw the items about the machine equipment construction standards for project cost saving in this study.

  • PDF

Optimal location of overwork-allowed facilities subject to choice of various equipment modes

  • Kwon, Min-Kyu;Sung, Chang-Sup
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.332-335
    • /
    • 2006
  • This paper considers a facility location problem, which is concerned with locating facilities on a supply chain network and installing the associated equipments at the facilities to meet a given set of demands. The objective function is to minimize the sum of setup cost (facility opening cost and equipment installation cost), operation cost, and distribution cost. For the equipments, various choices of equipment modes need to be determined. Moreover, in the problem, overwork is allowed each facility but at expensive operation cost. The proposed problem is characterized as being NP-hard problem, so that a heuristic algorithm is derived. In order to evaluate the performance of the proposed algorithm, computational experiments with various numerical instances are conducted.

  • PDF

Estimation of Construction Equipment Expenses - Bulldozer and Loader - (표준품셈의 기계경비 산정 현실화를 위한 자료 조사.분석 -불도우저와 로우더를 중심으로-)

  • Huh, Young-Ki;Kim, Kyung-A;Ahn, Bang-Ryul;Tae, Yong-Ho;Park, Hee-Sung;Kim, Chang-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.155-166
    • /
    • 2008
  • The Equipment Expenses section of the Poom-Saem that is used for Construction Cost Estimation of public sectors in Korea has been rarely revised, and so does not reflect changes of Construction Equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of equipment expenses for a bulldozer and a loader, the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

A Study on the Socio-economic Characteristics of Magnetic Resonance Image(MRI) Uses in Korea (우리나라 MRI 이용의 사회경제적 특성)

  • 김루시아;문옥륜
    • Health Policy and Management
    • /
    • v.2 no.2
    • /
    • pp.194-220
    • /
    • 1992
  • In recent years there has been a rapid influx of high cost MRI equipment into Korea. This diffusion has raised concerns about the changes it will bring for the health care utilization. Therefore, the purpose of this study is to identify socio-economic characteristics of MRI uses in Korea. A structured questionnaire was designed for this purpose, and 1, 091 users were surveyed at the 35 MRI units of 33 hospitals during a week, sometimes March 1992. The study reveals that high cost technology such as MRI, CT scanner is so prevalent in Korea. This is particularly the case in metropolitan areas. Among others, Seoul has the highest percentage of MRI equipment, 51.05%, Pusan 12.10% and Kwangju 11.9%. Unfortunately, most high cost technology equipments are foreign products. Thus, hospitals with such a high cost technology have difficulties in maintenance of the equipment. The average performance of MRI equipment has declined from 10.2 cases per day in 1988 to 7.16 cases in March 1992. Due to the rapid increase, the performance of MRI equipment seems to be deterioration. Male usere are dominant in the case of MRI use. The utilization rate has positively increased with the rise of educational level of users. The same is true for the level of income; the MRI utilization rate by income level shows that it is negatively proportional to income, which indicates that the poor have difficulties in the use of high cost technology. Particularly, the cost of MRI is so high that ordinary patients are unable to pay for it. For example, 86.3% of respondents have answered that the cost is too high even though they are insured by health insurance. This is the first empirical study on the use status of MRI. The information obtained in this study is sufficient to maintain that the Korean health insurance programme is urgently in need of improving the insurance benefit schemes. The easiest way to do this is to include provision of high cost technology service into the benefit package.

  • PDF

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'