KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.4
/
pp.941-951
/
2015
In the recent years, Korean construction companies have been awarded 680 billion USD in the oversea projects which lead to a successful quantitative growth. However, due to the lack of capability in the core technology and project management compared to the leading companies, in addition to low-price bidding, massive deficit projects have caused problems to the companies. In order to overcome the limitations of the lack of capabilities, the term constructability has been researched recently by developed countries to apply in the practical use. The concept of constructability must be applied for Korean companies to compete in the EPC construction projects. The term constructability is defined as the factor that affect the overall construction process of a project which is defined by the ease of construction and to secure the project quality. Therefore, this study aims to develop a constructability assessment model using the structural equation to assess the factors that affect the constructability in the design and construction stage. The purpose of using the structural equation is to analyze the direct and indirect correlation between each factor that affects the international construction projects. Total of 8 latent variables and 34 measured variables are derived through literature review, corporate reports, experts' interview and surveys. The result of the model suggests the constructability factors that are to be managed the most efficiently to reduce cost, time and improve the quality as well as a countermeasure strategy to successfully execute the target international construction projects.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.6D
/
pp.755-764
/
2011
At the present, planning and installation of parking space sections and lane width are implemented in accordance with the installation standard and parking lot structure by the enforcement regulations of the Parking Act. While large and RV (Recreational Vehicle) vehicles have increased in number recently, parking is complex with improper installation standards. It causes serious problems, including vehicle vandalism, increased civil complaints, travel inconveniences for parking lot users, management and maintenance issues for parking lots, and so forth. The study, therefore, determined that the practical and appropriate realignment of parking unit adjustment and lane width regulations are essential. The study conducted prior review on domestic parking sections and change cases of composition by vehicle types, including the component ratio of domestic and foreign vehicles, width of vehicle by types in order to examine the parking problems that account for a increasing social issues, and provided parking plan methods by types of vehicle, as well as reform and reaction plans for parking unit adjustment and lane width considering security and smooth traffic flow. After comparing and analyzing between estimated installation of parking space and lane width and internal and external cases, the study suggests the improvement that considers expenses and convenience of a driver. Also, it shows installation of parking space that considers traffic safety, improvement of lane width, and parking way depends on vehicle types. By providing estimation for parking planning and parking planning methods that secure safe and smooth traffic flow within a parking lot, the study will contribute to the development of improved alternatives for cost-effective traffic safety and set-up structure, including installation standards of parking lots.
Highway design speed is a very important design element which determines highway design level. When determining highway design speed, one would estimate it utilizing the most likelihood of design speed and vehicle operating speed relationship. Existing operating speed prediction models only include highway geometric characteristics and their impacts on speed, which usually can not consider the impact of highway design speed on surrounding roadway environment and land use pattern. If this happens, excessive highway construction cost and huge environmental impact can occur. In this research project, a new vehicle operating speed prediction model was developed which can reflect the effect of surrounding roadway environment into vehicle speed prediction. The followings are the research findings : Firstly, highway terrain types and land use pattern on national roads were classified and integrated into drivers' visual recognition pattern. This was performed using a data management software. Secondly, the developed highway terrain types and land use pattern were related to vehicle speeds and it was found that there were significant statistical differences among vehicle speed for each different terrain and land use pattern. Thirdly. the General Linear Model analysis was employed to analyze the effects of highway geometric features, terrain types, and land use patterns. For two-lane highway and four-lane highway tested in this research project, it was found that R squares were 0.67 and 0.85, respectively. Additionally an optimal highway design speed range table, based on this research project. was proposed for practical use. This table can be reliably used on South Korean national road design, but discretion is required for applying this table to other types of highways including provincial roads and municipal roads.
Journal of the Korea Organic Resources Recycling Association
/
v.8
no.2
/
pp.102-113
/
2000
This study was conducted to investigate the expandibility of sludge treatment by earthworm through real scale experiment and the optimum counter-plan for organic sludge treatment. For the purposes, sludge removal efficienciesof night-soil using earthworm and it's behavior according to the transplanting methods of the earthworm on non-cover worm bed or in the green house worm bed were compared. Sludge uptake rates on non-cover worm bed for 6 months were $0.27{\sim}0.33ton/m^2$ and the excrement of earthworm yields $0.15ton/m^2$(44.1~46.7% of raw night soil sludge dosage). These results were not much different from the worm bed in the green house. The average and maximum earthworm density were about $6.5kg/m^2$ and $7kg/m^2$ respectively on the non-cover worm bed. The density of the worm bed was comparatively higher in spring and fall terms but lower in summer. The amount of old earthworm was much plenty than young earthworm on the non-cover worm bed, resulting in reverse distribution type of pyramid. From the experiments on non-cover worm bed(7,000 pyeong)and in the green house worm bed(1,200 pyeong), it was concluded that landfill and transporting cost could be reduced when the earthworm was applied for the night-soil sludge treatment. Profits from the excrement sale of earthworm was 9,600,000 won. Through this study, it was founded that earthworm treatment method for organic sludge are much more environmentally sound than landfill treatment.
Recently, there has been much interest in the middleware that can smoothly acquire and analyze Geosensor information which includes sensor readings, location, and its surrounding spatial information. In relation to development of the middleware, researchers have proposed various algorithms for energy-efficient information filtering in Geosensor networks and have proposed Geosensor web technologies which can efficiently mash up sensor readings with spatial information on the web, also. The filtering algorithms and Geosensor Web technologies have contributions on energy-efficiency and OpenAPI, however the algorithms and technologies could not support easy and rapid development of u-GIS applications that need various Geosensor networks. Therefore, we propose a new Geosensor network middleware that can dramatically reduce the time and cost required for development of u-GIS applications that integrate heterogeneous Geosensor networks. The proposed middleware has several merits of being capable of acquiring heterogeneous Geosensor information using the standard SWE and an extended SQL, optimally performing various attribute and spatial operators, and easily integrating various Geosensor networks. Finally, we clarify our middleware's distinguished features by developing a prototype that can monitor environmental information in realtime using spatial information and various sensor readings of temperature, humidity, illumination, imagery, and location.
"Ubiquitous sensor network" definition is this-Someone attaches electro-magnetic tag everything which needs communication between man to man, man to material and material to material(Ubiquitous). By using attached every electro-magnetic tag, someone detects it's native information as well as environmental information such as temperature, humidity, pollution and infiltration information(Sensor). someone connects it realtime network and manage generated information(Network). 21st century's war is joint combined operation connecting with ground, sea and air smoothly in digitalized war field, and is systematic war provided realtime information from sensor to shooter. So, it needs dramatic development on watch reconnaissance, command and control, pinpoint strike etc. Ubiquitous computing and network technologies are essential in national defense to operate 21st century style war. It is possible to use many parts such as USN combined smart dust and sensor network to protect friend unit as well as to watch enemy's deep area by unmanned reconnaissance, wearable computer upgrading soldier's operational ability and combat power dramatically, RFID which can be used material management as well as on time support. Especially, unmanned watch system using USN is core part to transit network centric military service and to get national defense efficiency which overcome the dilemma of national defense person resource reducing, and upgrade guard quality level, and improve combat power by normalizing guardian's bio rhythm. According to the test result of sensor network unmanned watch system, it needs more effort and time to stabilize because of low USN technology maturity and using maturity. In the future, USN unmanned watch system project must be decided the application scope such as application area and starting point by evaluating technology maturity and using maturity. And when you decide application scope, you must consider not only short period goal as cost reduction, soldier decrease and guard power upgrade but also long period goal as advanced defense ability strength. You must build basic infra in advance such as light cable network, frequency allocation and power facility etc. First of all, it must get budget guarantee and driving force for USN unmanned watch system project related to defense policy. You must forwarded the USN project assuming posses of operation skill as procedure, system, standard, training in advance. Operational skill posses is come from step by step application strategy such as test phase, introduction phase, spread phase, stabilization phase and also repeated test application taking example project.
Journal of the Institute of Electronics Engineers of Korea SC
/
v.46
no.4
/
pp.28-38
/
2009
In this study, a remote air quality monitoring system for underground spaces was developed by using NDIR-based CO$_2$ sensor. And the remote monitoring system based on wireless sensor networks was installed practically on the subway station platform. More than 6.5 million citizens commutate everyday by the Seoul subway transportation that is the most typical public transportation. They concern about air quality with increasing interest on public health or many workers in subway stations or underground shopping centers. Recently, the Korean Ministry of Environment has operated the air quality monitoring system in some subway stations for testing phase. However, it showed many defects which are large-scale, high-cost and maintenance of precision sensors imported from abroad. Therefore this research includes the reliability test and a theoretical study about the inexpensive commercialized CO$_2$ sensor for reliable measurement of air quality which changes rapidly by the surrounding environments. And then we develop the wireless sensor nodes and the gateway applied for remote air quality monitoring. In addition, web server program was realized to manage air quality in the subway platform. This result will be valuable for a basic research for air quality management in underground spaces for future study.
Background: Follow-up clinical consultations could improve overall health status as well provide knowledge and education for cancer prevention. Materials and Methods: This is the cross-sectional study using the Korean Community Health Survey (KCHS) 6th edition for 2012, with 115,083 respondents who underwent cancer checkups selected as subjects. Associations between the presence of consultation and the socioeconomic status were determined using statistical methods with the SAS 9.3 statistical package (Cary, NC, USA). Findings: Among the recipients, 32,179 (28.0%) received clinical consultations after cancer screenings. Those in rural areas (odds ratio, OR=0.71, 95% confidence interval (CI), 0.69-0.73) visited follow-up clinics less frequently than did those in urban areas. Starting at the elementary school level, as the education level increased to middle school (OR=1.26, 95% CI: 1.19-1.34), high school (OR=1.29, 95% CI: 1.23-1.36) or college (OR=1.76, 95% CI: 1.65-1.89), the participation rates also increased. When compared with the lowest quartile group, the quartile income level showed a statistical trend and difference as follows: second lowest quartile (OR=1.11, 95% CI: 1.07-1.16), third lowest (OR=1.12, 95% CI: 1.07-1.17) and highest quartile income (OR=1.29, 95% CI: 1.23-1.35). In addition, the people with economic activities (OR=0.87, 95% CI: 0.84-0.90) visited follow-up clinics less frequently than did the others. Current smokers (OR=0.93, 95% CI: 0.89-0.98) and inveterate drinkers (OR=0.88, 95% CI: 0.85-0.94) had a tendency to visit less often than did non-smokers and other drinkers with all cancers combined. Interpretation: We suggest primary prevention through lifestyle modifications including smoking and drinking, and environmental interventions may offer the most cost-effective approach to reduce the cancer burden.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.2
/
pp.285-295
/
2016
The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.3
/
pp.989-998
/
2014
Recently volcanic eruptions and activities occurring in many parts of world have become a common global concern to many countries. The severity of these Volcanic disasters, such as of Mt. Eyjafjallajokull in Iceland and Mt. Merapi in Indonesia, have caused damages and causalities reaching astronomical levels. The infrastructure is categorized into 18sections that appropriately reflecting the survey data collected from various government agents, current inhabitant and engineers to accumulate a database on the priorities and preferences of restoring and reconstructing many kinds of infrastructure and facilities. The survey data was collect by using the "Likert 5 Scale Method" which emphasized the importance and priority of reconstruction and restoration for the specific facilities and infrastructures. The data was corrugated, organized and used in plotting and planning a strategic recovery agenda. The survey results were analyzed and verified to ensure the validity and reliability of the data by using chi-square test. This paper presents that recovery period and recovery cost to the total damage of infrastructure and facilities were used to make a recovery network with implemented construction management method. The research is expected that a more efficient and prompt recovery protocol and recovery plan can be executed and can be use as a reference and database.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.