• Title/Summary/Keyword: Engineering integrated management

Search Result 1,847, Processing Time 0.034 seconds

Web-Based Integrated Monitoring and Management System for High-Speed and High-Precision Machining Systems (고속.고정밀 가공시스템을 위한 웹기반 통합 모니터링 및 관리 시스템)

  • Nam S.H.;Moon J.S.;Hong W.P.;Choi H.Z.;Lee S.W.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.605-606
    • /
    • 2006
  • Today, the need for more flexible and adaptive production system and integrated management of their manufacturing information and facilities is ever increasing to cope with competitive and ever-changing global market environments and complexity of new control systems. This paper presents the whole system architecture and the technological characteristics of for each individual system layer which are able to flexibly integrate and manage high-speed and high-precision machining systems. It is investigated that monitoring and integrated management of the control systems can be realized with consideration of detailed information of various CNCs, and the management function may be easily constructed and extended using components of the manufacturing execution layer.

  • PDF

A Study on the Establishment Plan of Integrated Construction Information Classification (통합건설정보분류체계의 구축방안에 관한 연구)

  • Lee Kyo Sun;Park Hwan Pyo;Oh Uno;Park Sang Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.99-106
    • /
    • 2002
  • It was few to the integrated information classification system In domestic construction. Furthermore, it became considerable obstacles to hamper the increase of national competitiveness as well the hoarding of information and overlapped investment. The standardization of information classification is also necessary prior to the Computer-Integrated Construction, CALS(Continuous Acquisition & Life-cycle Support/Electronic Commerce) in construction, EVMS(Earned Value Management System) and the various projects which manipulate construction information. Therefore, this report suggests the development direction and application proposal of Integrated Construction Information Classification.

A Study on Establishment and Management of Training Curriculum Integrated Information Network (훈련과정종합정보망 구축 및 운영 방안에 관한 연구)

  • Rha, Hyeon-Mi
    • Journal of Engineering Education Research
    • /
    • v.13 no.1
    • /
    • pp.78-86
    • /
    • 2010
  • Training Curriculum Integrated Information Network is allowed to searching the all curriculums and courses related with training but also is a one stop handling integrated learning system to cover a course registration, learning and analysis of learning performance. Through developing and managing the Training Curriculum Integrated Information Network, it is available to get the various curriculum thus it is for trainers able to enforce the self oriented course choice and then high quality of training could be proposed by the diverse training curriculums and competitions. To manage Training Curriculum Integrated Information Network more effectively, active public relations marketing activities, high reliable correct information service and rich contents are required. It is essential to manage the learner and learning contents supplier, stable financial resources, personal security issue and protecting a copyright of training curriculum to be a successful network system.

  • PDF

Flood Risk Management for Weirs: Integrated Application of Artificial Intelligence and RESCON Modelling for Maintaining Reservoir Safety

  • Idrees, Muhammad Bilal;Kim, Dongwook;Lee, Jin-Young;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.167-167
    • /
    • 2020
  • Annual sediment deposition in reservoirs behind weirs poses flood risk, while its accurate prediction remains a challenge. Sediment management by hydraulic flushing is an effective method to maintain reservoir storage. In this study, an integrated approach to predict sediment inflow and sediment flushing simulation in reservoirs is presented. The annual sediment inflow prediction was carried out with Artificial Neural Networks (ANN) modelling. RESCON model was applied for quantification of sediment flushing feasibility criteria. The integrated approach was applied on Sangju Weir and also on estuary of Nakdong River (NREB). The mean annual sediment inflow predicted at Sangju Weir and NREB was 400,000 ㎥ and 170,000 ㎥, respectively. The sediment characteristics gathered were used to setup RESCON model and sediment balance ratio (SBR) and long term capacity ratio (LTCR) were used as flushing efficiency indicators. For Sangju Weir, the flushing discharge, Qf = 140 ㎥/s with a drawdown of 5 m, and flushing duration, Tf = 10 days was necessary for efficient flushing. At NREB site, the parameters for efficient flushing were Qf = 80 ㎥/s, Tf = 5 days, N = 1, Elf = 2.24 m. The hydraulic flushing was concluded feasible for sediment management at both Sangju Weir and NREB.

  • PDF

Design and Implementation of Information Resource Management System with Hierarchical Management Architecture (계층적 관리 구조를 갖는 정보 자원 관리 시스템의 설계 및 구현)

  • Lee, Won-Hyuk;Ahn, Seong-Jin;Chung, Jin-Wook
    • The KIPS Transactions:PartC
    • /
    • v.9C no.3
    • /
    • pp.421-430
    • /
    • 2002
  • In this paper, we propose the integrated management system for computing resource such as personal computers, the interface of router, and server equipment. IRMS defines and analyzes the performance factors for system such as pc and router, also it manages assets for server equipment. Manager can make use of data for understanding conditions whether system is normal or not. We suggest a hierarchical integrated management architecture for resolving problems of scalability and managing efficiency in large domain networks.

Performance management of communication networks for computer integrated manufacturing Part ll: Decision making (컴퓨터 통합 샌산을 위한 통신망의 성능관리)

  • Lee, Suk
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.11 no.4
    • /
    • pp.138-147
    • /
    • 1994
  • Performance management of computer networks is intended to improve a given network performance in order for more efficient information exchange between subsystems of an integrated large-scale system. Improtance of performance management is growing as many function of the large- scale system depend on the quality of communication services provided by the network. The role of performance management is to manipulate the adjustable protocol parameters on line so that the network can adapt itself to a dynamic environment. This can be divided into two subtasks : performance evaluation to find how changes in protocol parameters affect the network performance and decision making to detemine the magnitude and direction of parameter adjustment. This paper is the second part of the two papers focusing on conceptual design, development, and evaluation of performance management for token bus networks. This paper specifically deals with the task of decision making which utilizes the principles of stochastic optimization and learning automata. The developed algorithm can adjuxt four timer settings of a token bus protocol based on the result of performance evaluation. The overall performance management has been evaluated for its efficacy on a network testbed.

  • PDF

Studying Retailer Strategies through an Integrated E-Business Model: a Multi-Agent Approach

  • Xie Ming;Chen Jian
    • Management Science and Financial Engineering
    • /
    • v.11 no.3
    • /
    • pp.1-17
    • /
    • 2005
  • Agent technology has been widely applied in today's electronic business, such as mobile agents, multi-agent information systems, etc. In particular, multi-agent systems have been applied as powerful simulation tools to study complex business networks composed of various self-interested trading firms and/or human beings. In this paper, we build an integrated model that consists of a multi-agent B2C market model and a B2B trade network model, and incorporate more reality than much of prior work. Then with this model, we carry out experimental studies on two different strategies that are common in electronic business - 'loyal' strategy (retailers try to build stable cooperation with suppiers to ensure material supply) and 'cost-saving' strategy (retailers try to reduce cost by choosing suppliers with lower wholesale price).

Intelligent Information Technologies for Integrated Management Systems of Enterprises with A Complex Scheme of Gas-Extraction and Processing

  • Matvienko, Evgeny V.;Adilov, F.T.;Ivanyan, A.I.
    • Journal of Multimedia Information System
    • /
    • v.2 no.3
    • /
    • pp.249-254
    • /
    • 2015
  • This article considers the development of an integrated control and safety management system (ICSS) and its interfaces with an automated enterprise management system (AEMS) in light of the establishment of industrial enterprises with intelligent model of centralized management on the example of Kandym GPP.

Development of Integrated Management System for Steep Slope Prevention and Management (급경사지 방재 및 관리를 위한 급경사지정보 통합관리시스템 개발)

  • Lee, Kyungchul;Jang, Yonggu;Song, Jihye;Kang, Injoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.9
    • /
    • pp.77-85
    • /
    • 2014
  • Recently, the National Emergency Management Agency of Korea has been operating the National Disaster Management System. Nevertheless, there are numerous difficulties in systematic controlling the steep slope DB promptly, because the system's functions in input and control for steep slope information are merely simple. Futhermore, the hazard degrees of steep slope lands nowadays have risen suddenly in accordance with the increase rate of large scale landslides such as the landslide cases of Umyeonmountain, Chuncheon province and others or sever rain storm cases. these lead to rapid increases in frequencies of nature disasters nationally. therefore, it is needed to develop the GIS-based integrated management system for steep slope information in order to manage disasters in advance or high-degree control. This study shows the national GIS-based integrated management system to prevent the disasters that caused by steep slope lands. The integrated management system developed in this study consists of surface information input modules, realtime DB liaison modules of integrated underground information, V-world background map-based GIS, integrated management system for steep slope information user modules, realtime liaison interface modules designed for utilizing steep slope information. Also, tests about stability of data storage, system stability and consistency of processing speed were performed.

Design Data Exchange in an Integrated Architectural Design Environment: A Product Model Approach Using STEP Technology (통합 건축 설계 환경에서의 설계 정보의 교환에 관한 연구: STEP을 이용한 Product Modeling 접근 방법)

  • 김인한;김유진
    • Korean Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.44-52
    • /
    • 1997
  • A design process is difficult to describe comprehensively because a design problem has a multi-disciplinary nature and the design itself evolves as solutions are attempted by the designer. The process of design has been investigated in this paper with the purpose of characterizing the role that a system of this kind may have. In defining the system, an approach has been used that privileges the relationships with the existing CAD tools based on data exchange standards in course of definition today. Integrated design environment normally consists of a centralized data model a data management system and a set of CAD tools. In this study, all further investigations are directed towards the data management system, as one of the main components of the proposed environment. Moreover, product modeling, as a prerequisite for the data management core, is taken into special consideration.

  • PDF