• Title/Summary/Keyword: Engineering integrated management

Search Result 1,847, Processing Time 0.028 seconds

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

The Framework Development of Cloud Computing-based Integrated EHS Management System for Small and Medium Construction Companies (중소건설사를 위한 클라우드 컴퓨팅 기반 EHS 통합관리시스템 프레임워크 개발)

  • Seo, Kwang-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.139-143
    • /
    • 2010
  • The small and medium construction companies are facing potential EHS(Environment, Health & Safety) of major accidents to cause casualties or a financial loss and increasing social responsibility. So, they have to voluntarily accomplish the EHS management system rather than passively with regard to EHS regulation. In this study, the framework of integrated EHS management system is developed based on cloud computing, and construction companies are to materialize self-regulation EHS process of construction workplace and to standardize the total EHS business process using the developed system. The proposed system also provides risk analysis, education/control and continuous improvement for EHS tasks and users can easily access the system on the web at a low price through cloud computing service. Eventually, the integrated system contributes to the managerial improvement by minimizing economic and physical loss caused by construction accidents.

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

A System Development for Management of On-the-spot Using the Event Management Theory (EVENT 관리기법을 응용한 건설현장관리시스템에 관한 연구)

  • Yoon, In;Jeong, Chang-Won;Choi, Young-Sik;Yoon, Min
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.2 no.1
    • /
    • pp.113-119
    • /
    • 1999
  • In order to accomplish either information system with future estimate or scientic management, application package of integrated detail management is required for Construction Company. The application package of integrated detail management is based on management of estimation, management of account. management of tax bill, management of on the spot, management of equipment and management of labor. This research focuses on the basic survey for this system such as circumstance of information system for construction company, a barrier of progress, development dirction, development article.

  • PDF

Development of an Integrated DB Management System for GIS-Based Client/Server Data Sharing in Climate and Environment Fields (GIS기반의 기후·환경 분야 자료 공유를 위한 Client/Server 방식의 통합DB 관리시스템 개발)

  • Choi, Yong-Kuk;Kim, Kye-Hyun;Lee, Chol-Young
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.17 no.2
    • /
    • pp.32-43
    • /
    • 2014
  • To identify major causes of the global environment changes arising from extreme and unusual weather patterns occurring these days, and to foresee future environmental changes, it is highly important to shed light on the correlation between climate changes and global environment system. To investigate the correlation between climate changes and global environment system, it calls for establishing an integrated climate-environment DB for analyzing comparatively the data on climatic changes and global environment system. In the preceding studies, we researched an XML-based integrated climate-environment DB and developed a management system for the DB. However, the existing integrated climate-environment DB, designed and installed only for individual PCs, does not allow multiple users 'simultaneous access. Accordingly, it fails to systematically update and sharing data which is being generated continuingly. Hence, this study aims to develop an easy-to-use GIS-based integrated DB management system by improving the existing integrated climate-environment DB through the adoption of the client/server model. For this, this study collected and analyzed climate and environment data prior to designing and building a DBMS-based integrated DB. In addition, in order for multidisciplinary researchers to easily get access and apply the integrated DB, this study designed and developed a GIS-based integrated DB management system using a client/server model which facilitates connections with multiple PCs. The GIS-based integrated climate-environment DB management system makes it easier to efficiently manage and locate scattered climate-environment data. It is also expected that the DB system will bring the effects in saving time and cost by avoiding the overlapping generation of data in the areas of integrated climate-environment research.

Development of Integrated Project Management System for Industry-Academy-Research Cooperation (산학연 통합 프로젝트 관리 시스템 개발)

  • Shin, Dong-Suk;Jeong, Gi-Ho;Lee, Jae-Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.2
    • /
    • pp.403-408
    • /
    • 2010
  • In this paper, we design and implement the iMPS(Integrated Project Management system). The iMPS is used in the performance evaluation which establishes the systematic management of support for Industry-Academy-Research Cooperation. The implemented iPMS mainly contain functions. First, the search function produces a report for result on the status of numerous projects and allows administrators to track project status in a excel file format. Second, the management function produces a performance evaluation, monitoring. Applying the iPMS to management of Busan-Ulsan Association of industry-academy cooperation, its usefulness is from the results of web service.

A Study on the Management System Integrated Safety$\cdot$Health and Environment in Chemical Industries (화학공장에서의 안전$\cdot$보건, 환경 통합체제 구축에 관한 연구)

  • Im Cha-Soon;Kim Sung-Bin;Kim Ky-Soo;Lim Dong-Ho;Baek Jong-Bae;Um Sung-In;Ko Jae Wook
    • Journal of the Korean Institute of Gas
    • /
    • v.3 no.3 s.8
    • /
    • pp.17-22
    • /
    • 1999
  • This study established management system integrated Safety$\cdot$Health, Management System(SHMS) and Environment Management System(ISO 14000) which satisfy all the systems through analyzing the PSM, SMS, BS 8800 and ISRS. Also, this study presented the guideline model which can make regular document forms in the integrated Safety, Health and Environment Management System. Furthermore, integrating management system developed in this study can reduce the duplication and inefficiency of materials and human resources in chemical industries

  • PDF

Case Study on the Mitigation of Dangerous Slope Considering the Value of Geoheritage (지질유산 가치를 고려한 위험비탈면 보존 방안 사례 연구)

  • Jeong, Jun-Ho;Kim, Seung-Hyun;Park, Byung-suk;Woo, Yong-Hoon;Kang, Yun-seok;Koo, Ho-bon;Son, Moon
    • The Journal of Engineering Geology
    • /
    • v.30 no.1
    • /
    • pp.71-84
    • /
    • 2020
  • Various geological structures are found on the slope of Bangnim district in Pyeongchang, Gangwon-do, based on the Paleozoic Joseon Supergroup Limestone. The recumbent fold observed on the slope is a very rare geological structure that has not been found in Korea, and has important academic value in exploring the formation process of the Paleozoic geological structures in the Gangwon region. In this study, discussed the geological value of the geological structure observed on the slope of the road, and studied the management method of rockfall problem slopes. The state of development of recumbent folds has conservation value in geological scarcity and specificity. Preservation management measures should be prepared through the protection of slopes and measures to reduce of rockfall risks as geoheritage with an important value in geology science and education. Furthermore, it is expected to be preserved and utilized as a geopark.

An Implementation of Integrated Interface System for the Digital Ship (디지털 선박의 통합 연동 시스템 구현)

  • Park, Jong-Won;Sung, So-Young;Lim, Yong-Kon;Yun, Chang-Ho;Kim, Seung-Geun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.6
    • /
    • pp.1158-1166
    • /
    • 2012
  • Thus, all systems and sensors corresponding to navigation are integrated to an INS (Integrated Navigation System) or an IBS (Integrated Bridge System). Propulsion automation systems, propulsion systems, auxiliary systems, and power management systems are integrated to an ICMS (Integrated Control and Monitoring System), an IPMS (Integrated Platform Management System), and IMCS (Integrated Monitoring and Control System). This paper introduces the results of designing and implementing an Integrated Interface System which ties up diverse system interfaces via network and inversely converts network signals into a proper interface signal type connected to other systems.

Security Analysis and Improvement of Integrated Security Management System (통합보안관리시스템 보안 분석 및 개선)

  • Kim, Kyung-Shin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.1
    • /
    • pp.15-23
    • /
    • 2015
  • This thesis proposes how data security has changed since the emergence of 'Big Data' in 2012 and the type of Integrated Security Management System that needs to be built against security threats, based on an analysis of Big Data. Much research has been conducted in Big Data. I need to think about what an Integrated Security Management System requires in order to safeguard against security threats such as APT. I would like to draw a comparison between the current Integrated Security Management System and one that is based on Big Data, including its limitations and improvements, so that I can suggest a much improved version of Integrated Security Management System.