• Title/Summary/Keyword: Engineering characteristic

Search Result 9,759, Processing Time 0.04 seconds

Design of Deep Learning-based Tourism Recommendation System Based on Perceived Value and Behavior in Intelligent Cloud Environment (지능형 클라우드 환경에서 지각된 가치 및 행동의도를 적용한 딥러닝 기반의 관광추천시스템 설계)

  • Moon, Seok-Jae;Yoo, Kyoung-Mi
    • Journal of the Korean Applied Science and Technology
    • /
    • v.37 no.3
    • /
    • pp.473-483
    • /
    • 2020
  • This paper proposes a tourism recommendation system in intelligent cloud environment using information of tourist behavior applied with perceived value. This proposed system applied tourist information and empirical analysis information that reflected the perceptual value of tourists in their behavior to the tourism recommendation system using wide and deep learning technology. This proposal system was applied to the tourism recommendation system by collecting and analyzing various tourist information that can be collected and analyzing the values that tourists were usually aware of and the intentions of people's behavior. It provides empirical information by analyzing and mapping the association of tourism information, perceived value and behavior to tourism platforms in various fields that have been used. In addition, the tourism recommendation system using wide and deep learning technology, which can achieve both memorization and generalization in one model by learning linear model components and neural only components together, and the method of pipeline operation was presented. As a result of applying wide and deep learning model, the recommendation system presented in this paper showed that the app subscription rate on the visiting page of the tourism-related app store increased by 3.9% compared to the control group, and the other 1% group applied a model using only the same variables and only the deep side of the neural network structure, resulting in a 1% increase in subscription rate compared to the model using only the deep side. In addition, by measuring the area (AUC) below the receiver operating characteristic curve for the dataset, offline AUC was also derived that the wide-and-deep learning model was somewhat higher, but more influential in online traffic.

A Study on the Changes of Landscape Perception for 'Bejing-Palgyeong(北京八景)' in China (중국 역대 북경팔경(北京八景)의 경관인식 변화에 대한 고찰)

  • Kwon, Ji-Young;Kim, Sung-Kyun
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.38 no.2
    • /
    • pp.1-13
    • /
    • 2020
  • This study closely analyzed poems and paintings related to Beijing-Palgyeong, as well as ancient maps and ancient writings. Through the study, people who read this study can consider, Beijing-Palgyeong's the process of changing times, changing landscape perception, physical and symbolic landscape elements, structural analysis, national management relationships, and finally how it was localized as symbolic place. The view point of the Beijing-Palgyeong is distributed in four places, one outside and one inside the city. Outside of the capital city of Beijing-Palgyeong were concentrated in Seosan(西山) where the resting place of the emperor and the center of the landscape view of Beijing. The view point of Beijing-Palgyeong inside the capital city is located in two places in the royal palace's Imperial Garden and in two villages around the fortress. In other words, Beijing-Palgyeong was selected as a place closely related to the imperial family, emperor, and royal palace from the time of its initial creation. Since then, many scholars, including the emperor, have used it for national management through Won(元), Ming and Qing Dynasty, and it have become more and more characteristic of 'The capital city of eight scenic views'. The two places inside the capital city praised the Gods and Emperors in the same way. Outside the capital city, the two sites depict the comfortable lives of the people who are governed by the emperor and depicting the village landscape around the city. In the end, it can be seen that most of the Beijing-Palgyeong are related to imperial palaces and emperors. If you look at the physical landscape of Beijing-Palgyeong by element, it mainly contains the contents of national management and the emperor's eulogy. Qianlong Emperor established the Beijing-Palgyeong in 1751 through the construction of a monument. A four-character on the front of the monument, and inscribed with a seven-word written by the person on the back. It can be said that Qianlong Emperor's Beijing-Palgyeong were intended to show off the results of Manchurian rule through the material symbol of the monument. Beijing-Palgyeong have been transformed into a landmark, and modern people use it as an indicator of the Beijing-Palgyeong.

Evaluation of the Removal Characteristics of Pollutants in Storm Runoff Depending on the Media Properties (여재 특성에 따른 강우 유출수 내 오염물질 제거특성 평가)

  • Kim, Tae-Gyun;Cho, Kang-Woo;Song, Kyung-Guen;Yoon, Min-Hyuk;Ahn, Kyu-Hong;Hong, Sung-Kwan
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.31 no.7
    • /
    • pp.483-490
    • /
    • 2009
  • The aims of this study were to evaluate the removal efficiency for various pollutants in urban storm runoff by a filtration device, and to determine design parameters depending on filter media properties. Appropriate selection of filter media will affect the size and life time of the filtration device. Sets of column tests were performed in order to evaluate the removal efficiency by perlite and a synthetic resin. An investigation of surface properties including CEC (cation exchange capacity) and zeta-potential suggested that the perlite had a superior adsorption capability for cationic pollutants. TCODcr and turbidity were analyzed to investigate the removal characteristic of particulate pollutant. In both columns, the particles in the collected storm runoff was almost completely capture with a small EBCT (empty bed contact time) of 2.5 minutes. Complete clogging at the EBCT of 2.5 minutes occurred after 630 minutes in the perlite column and 810 minutes in the resin column. The removal efficiency of TCODcr and turbidity at the EBCT of 2.5 minutes decreased to below 70% due to an wall effect. The removal efficiency for dissolved pollutant (SCODcr) was negligible due to the insufficient contact time for adsorption. The removal of heavy metals (Cu, Zn, Pb) was mostly ascribed to the filtration of particles containing metals, since the relationship between CEC and the removal efficiency was not apparent. The result of this study would be valuable for the application of filtration device to control of urban storm runoff.

Remediation of Heavy Metal Contaminated Groundwater by Using the Biocarrier with Dead Bacillus sp. B1 and Polysulfone (Bacillus sp. B1 사균과 Polysulfone으로 이루어진 미생물 담체를 이용한 중금속 오염 지하수 정화)

  • Lee, Min-Hee;Lee, Ji-Young;Wang, Soo-Kyun
    • Economic and Environmental Geology
    • /
    • v.43 no.6
    • /
    • pp.555-564
    • /
    • 2010
  • Remediation process by using the bio-carrier (beads) with dead Bacillus sp. B1 and polysulfone was investigated for heavy metal contaminated groundwater. Sorption batch experiments using the bio-carrier were performed to quantify the heavy metal removal efficiencies from the contaminated solution. The analyses using SEM/EDS and TEM for the structure and the characteristic of precipitates on/inside the beads were also conducted to understand the sorption mechanism by the bio-carrier. Various amounts of freeze-dried dead Bacillus sp. B1 were mixed with polysulfone + DMF(N,N-dimethylformamide) solution to produce the bio-carrier (beads; less than 2mm in diameter) and 5% of Bacillus sp. B1 in the bio-carrier was optimal for Pb removal in the solution. The removal efficiency ratings of the bio-carrier for Pb, Cu and Cd were greater than 80% after adding 2g of bio-carrier in 50ml of aqueous solution (<10mg/L of each heavy metal concentration). Reaction time of the bio-carrier was very fast and most of the sorption reaction for heavy metals were completed within few hours. Batch experiments were duplicated at various pH conditions of aqueous solutions and Cu and Pb removal efficiencies highly maintained at wide pH ranges (pH 2-12), suggesting that the bio-carrier can be useful to clean up the acidic waste water such as AMD. From SEM/EDS and TEM analyses, it was observed that the bio-carrier was spherical shape and was overlapped by many porous layers. During the sorption experiment, Pb was crystallized on the surface of porous layers and also was mainly concentrated at the boundary of Bacillus sp. B1 stroma and polysulfone substrate, showing that the main mechanism of the bio-carrier to remove heavy metals is the sorption on/inside of the bio-carriers and the bio-carriers are excellent biosorbents for the removal of heavy metal ions from groundwater.

Fabrication and Filtering Test of Nanoparticle-Stabilized Emulsion to be Suitable for Enhanced Oil Recovery (석유증진회수에 적합한 나노 에멀젼의 제조 및 필터링 시험 분석)

  • Son, Han Am;Lee, Keun Ju;Cho, Jang Woo;Im, Kyung Chul;Kim, Jin Woong;Kim, Hyun Tae
    • Economic and Environmental Geology
    • /
    • v.46 no.1
    • /
    • pp.51-61
    • /
    • 2013
  • Researches on the oil recovery enhancement using the nanotechnology has recently been studied in the United States. The previous researches has focused mainly on the flow characteristics of nanoparticles in porous media, and the stability of the nano-emulsion itself. However, the analysis did not deal with the size effects between a nano-emulsion and the pore size which has an important role when nano-emulsion flows in the porous media. In this research, nano-based emulsion was fabricated which is able to be applied for the enhanced oil recovery techniques and its characteristics was analyzed. In addition, in order to identify the characteristics of nano-emulsions flowing through the porous media, the size effect was analysed by filtering test. According to the results, when the emulsion was fabricated, SCA(Silane Coupling Agent) or PVA(Poly Vinyl Alcohol) are added to improve the stability of emulsion. As the ratio of the decane to water increased, the viscosity of emulsion and the droplet size also increased. For the filtering test at the atmospheric conditions, the droplet did not go through the filter; only the separated water from the emulsion was able to be filtered. This phenomenon occurred because the droplet was not able to overcome the capillary pressure. At the filtering test by suction pressure, most of the emulsion was filtered over the filter size of $60{\mu}m$. However, the ratio of filtration was rapidly degraded at less than $45{\mu}m$ filters. This is caused due to deformation and destruction of the droplet by strong shear stress when passing through the pore. The results from the study on the basic characteristic of nano-emulsion and filtering test will be expected to play as the important role for the fabrication of the stable nano-emulsion or the research on the recovery of residual oil in porous media.

A Study on a Quantified Structure Simulation Technique for Product Design Based on Augmented Reality (제품 디자인을 위한 증강현실 기반 정량구조 시뮬레이션 기법에 대한 연구)

  • Lee, Woo-Hun
    • Archives of design research
    • /
    • v.18 no.3 s.61
    • /
    • pp.85-94
    • /
    • 2005
  • Most of product designers use 3D CAD system as a inevitable design tool nowadays and many new products are developed through a concurrent engineering process. However, it is very difficult for novice designers to get the sense of reality from modeling objects shown in the computer screens. Such a intangibility problem comes from the lack of haptic interactions and contextual information about the real space because designers tend to do 3D modeling works only in a virtual space of 3D CAD system. To address this problem, this research investigate the possibility of a interactive quantified structure simulation for product design using AR(augmented reality) which can register a 3D CAD modeling object on the real space. We built a quantified structure simulation system based on AR and conducted a series of experiments to measure how accurately human perceive and adjust the size of virtual objects under varied experimental conditions in the AR environment. The experiment participants adjusted a virtual cube to a reference real cube within 1.3% relative error(5.3% relative StDev). The results gave the strong evidence that the participants can perceive the size of a virtual object very accurately. Furthermore, we found that it is easier to perceive the size of a virtual object in the condition of presenting plenty of real reference objects than few reference objects, and using LCD panel than HMD. We tried to apply the simulation system to identify preference characteristics for the appearance design of a home-service robot as a case study which explores the potential application of the system. There were significant variances in participants' preferred characteristics about robot appearance and that was supposed to come from the lack of typicality of robot image. Then, several characteristic groups were segmented by duster analysis. On the other hand, it was interesting finding that participants have significantly different preference characteristics between robot with arm and armless robot and there was a very strong correlation between the height of robot and arm length as a human body.

  • PDF

Characteristic of Odorous Compounds Emitted from Livestock Waste Treatment Facilities Combined Methane Fermentation and Composting Process (메탄발효와 퇴비화 공정이 연계된 가축분뇨 처리시설에서 발생되는 악취물질 특성 조사)

  • Ko, Han Jong;Kim, Ki Youn;Kim, Hyeon Tae;Ko, Moon Seok;Higuchi, Takasi;Umeda, Mikio
    • Journal of Animal Science and Technology
    • /
    • v.50 no.3
    • /
    • pp.391-400
    • /
    • 2008
  • Odor management is significantly concerned with sustainable livestock production because odor nuisance is a primary cause for complaint to neighbors. This study was conducted to measure the concentration of odorous compounds, odor intensity, and odor offensiveness at unit process in animal waste treatment facility combined composting and methane fermentation process by an instrumental analysis and direct olfactory method. Ammonia, sulfur-containing compounds, and volatile fatty acid were analyzed at each process units and boundary area in summer and winter, respectively. Higher concentration of odorants occurred in the summer than in the winter due to high ambient temperature. The maximum concentration of odorants was detected in composting pile when mixed manure was being turned followed by inlet, curing, outlet, and screen & packing process. Highest concentration of detected odorous compounds was ammonia ranging from 3.4 to 224.7 ppm. Among the sulfur-containing compounds measured, hydrogen sulfide was a maximum level of 2.3 ppm and most of them exceeded reported odor detection thresholds. Acetic acid was the largest proportion of VFA generated, reaching a maximum of 51 to 89%, followed by propionic and butyric acid at 1.9 to 35% and 1.8 to 15%, respectively. Malodor assessment by a human panel appeared a similar tendency in instrumental analysis data. Odor quotient for predicting major odor-causing compounds was calculated by dividing concentrations measured in process units by odor detection thresholds. In the composting process, hydrogen sulfide, ammonia, dimethyl sulfide, and methyl mercaptan were deeply associated with odor-causing compounds, while the major malodor compounds in the inlet process were methyl mercaptan, hydrogen sulfide, and butyric acid.

An Analysis of the Cognition of Professionals Regarding the Validity of Planting Design Change that Occurred in the Landscape Construction of a Major Private Company (민간기업 조경공사에서 나타나는 식재설계 변경 타당성에 대한 전문가 인식 분석)

  • Park, Jae-Young;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.6
    • /
    • pp.101-110
    • /
    • 2014
  • This study analyzes the validity of the type classification of the type and design changes of apartment landscaping planting construction design changes that were completed in the private sector, efficiently manages the design changes that are displayed over landscaping planting work in general in the future, and performs research by placing the object underlying the presentation. The results are as follows. First, the percentage that occurred in the planting construction of design changes that have occurred in the apartment landscaping construction was carried out in the private sector and accounted for 61.8%. This indicates that part of the planting is a major design change. Second, as the cause of such a design change to be those associated with the field conditions such as lack of main construction period. In particular, due to a change in oral, appeared 7-48 times design changes of one review design change approval is complex, design changes of planting construction had shown a feature that occurs in multiple simultaneous. Third, the 7 types of Design Changes in planting design were delineated as 'design changes for consideration of the user', 'design changes for image improvement', 'design changes for ease of maintenance', 'design changes due to the mismatch of design statement', 'design changes due to the relationship with the engineering species of other', 'design changes due to lack of field study', and 'design changes due to the consideration of feasibility.' Fourth, 'design changes for consideration of the user' and 'design changes for image improvement' were found in more than half of the frequency of the overall changes. This differed from the results shown in public corporations. Fifth, if planting construction design change process, private companies, it was found that is showing the approval of the practice after the previous construction of the construction cost savings due to construction time. However, in the case of a public corporation, these exhibited a different aspect from the private sector and show a design change procedure that reflects the changes after the design change events in the field have occurred. The above results, the type of landscaping works in planting design change of public enterprises, regardless of the private sector, is the same in the seven types, the main reason of and procedures for design changes, indicating that there are other respects. In design change, it may be desirable to apply becomes liquidity rationality and efficiency of the dimension, depending on the nature of the landscape construction.

An Investigation of Treatment Effects of Limestone and Steel Refining Slag for Stabilization of Arsenic and Heavy Metal in the Farmland Soils nearby Abandoned Metal Mine (폐금속 광산 주변 비소 및 중금속 오염농경지의 안정화 처리를 위한 석회석과 제강슬래그의 처리효과 검토)

  • Yun, Sung-Wook;Kang, Sin-Il;Jin, Hae-Geun;Kim, Ha-Jin;Lim, Young-Cheol;Yi, Ji-Min;Yu, Chan
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.44 no.5
    • /
    • pp.734-744
    • /
    • 2011
  • A soil stabilization method is an effective and practical remediation alternative for arsenic (As) and heavy metal contaminated farmland soils nearby abandoned metal mine in Korea. This method is a technique whereby amendments are incorporated and mixed with a contaminated soil. Toxic metal bind to the amendments, which reduce their mobility in soil, so the successful stabilization of multi-element contaminated soil depends on the combination of critical elements in the soil and the type of amendments. The objective of this study is to investigate the treatment effects and applicability of limestone (LS) and steel refining slag (SRS) as the amendment for farmland soil contaminated with As and heavy metals, and a lab-column test was conducted for achieving this purpose. The result showed that soil treated with LS and SRS maintained pH buffer capacity and, as a result, the heavy metal leaching concentration was quite low below the water quality standard compared to untreated soil which leachate exceeding the water quality standard was observed, however, the arsenic concentration rather increased with increasing mixture ratio of SRS. This was believed to be related to phosphorus (P) contained in SRS, and dominancy in the competitive adsorption relation between As and P binding strongly to iron might be different according to soil characteristic. We suggested that LS is a effective amendment for reducing heavy metals in soil, and SRS should be used after investigating its applicability based on the adsorption selectivity of arsenic and phosphorus in selected soil.

A Study on the Construction method of Stamped earthen wall (판축토성(版築土城) 축조기법(築造技法)의 이해(理解) - 풍납토성(風納土城) 축조기술(築造技術)을 중심(中心)으로 -)

  • Shin, Hee-kweon
    • Korean Journal of Heritage: History & Science
    • /
    • v.47 no.1
    • /
    • pp.102-115
    • /
    • 2014
  • The stamped earth method is a typical ancient engineering technique which consists of in-filling wooden frame with layers of stamped earth or sand. This method has been universally used to construct earthen walls and buildings, etc. The purpose of this article is to understand the construction method and principles of the stamped earthen wall through analysis of various construction techniques of Pungnaptoseong Fortress(Earthen Fortification in Pungnap-dong). First of all, the ground was leveled and the foundations for the construction of the earthen wall were laid. The underground foundation of the earthen walls was usually constructed by digging into the ground and then in-filling this space with layers of mud clay. Occasionally wooden posts or paving stones which may have been used to reinforce the soft ground were driven in. The method of adding layers of stamped earth at an oblique angle to either side of a central wall is the most characteristic feature of Pungnaptoseong Fortress. Even though the traces of fixing posts, boards, and the hardening of earth - all signatures of the stamped earth technique - have not been identified, evidence of a wooden frame has been found. It has also been observed that this section was constructed by including layers of mud clay and organic remains such as leaves and twigs in order to strengthen the adhesiveness of the structures. The outer part of the central wall was constructed by the anti-slope stamped earth technique to protect central wall. In addition a final layer of paved stones was added to the upper part of the wall. These stone layers and the stone wall were constructed in order to prevent the loss of the earthen wall and to discharge and drain water. Meanwhile, the technique of cementing with fire was used to control damp and remove water in stamped earth. It can not be said at present that the stamped earth method has been confirmed as the typical construction method of Korean ancient earthen walls. If we make a comparative study of the evidence of the stamped earth technique at Pungnaptoseong Fortress with other archeological sites, progress will be made in the investigation of the construction method and principles of stamped earthen wall.