• Title/Summary/Keyword: Engineer Equipment

Search Result 94, Processing Time 0.023 seconds

A Database Design for Remote Maintenance of Navigation and Communication Equipments in a Vessel (선박 항해통신장비 원격유지보수를 위한 데이터베이스 설계)

  • Kim, Ju-young;Ok, Kyeong-suk;Kim, Ju-won;Cho, Ik-soon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.11
    • /
    • pp.2052-2060
    • /
    • 2017
  • The SOLAS ship should carry at least 83 different types of equipment based on the SFI group codes and each of which consists of several to dozens of components. During ship operation, it is necessary to ensure the normal operation of such equipment, and remote maintenance is highly demanded for immediate repair in the event of a equipment fault. This study proposes to find suitable classification system and to derive database structure for remote maintenance of navigation and communication equipment. As a result of this study, the classification system of equipment should be layered into equipment type, model, and component, and main table in the database consists of FMEA, service history, case data through Q&A, Preventive Maintenance. A database was constructed for 140 navigation and communication equipment models and 750 components. In order to evaluate the practical effects, service engineer evaluated the usefulness using the cloud app.

Study on the Treatment, Utilization and Control of the Acid Mine Drainage for Colliery - An on-site test on the Applicability of a Korean-type Prototype for Mine Drainage Purification- (석탄광의 산성갱내배수 처리.이용.제어에 관한 연구 -한국형 특수갱배수 정화장치 시작품 현지적용실험-)

  • 이춘택
    • Journal of the Korean Professional Engineers Association
    • /
    • v.19 no.4
    • /
    • pp.11-21
    • /
    • 1986
  • Mine drainage from coal mines is mostly acidic, polluted and/or contaminated, even if its quantity has increased substantially during recent days. This causes two kinds of problems arising at mining districts; one is the environmental disruption and the other is insufficient water supply for living, employee's bathing and industrial purposes. In order to mitigate the aforementioned problems, a specific equipment of Korea type for mine drainage purification has been developed and its prototype manufactured, followed by its applicability tests implemented at mine site. The results of the tests indicates that the new equipment developed is much lower than and economical compared to, other existing neutralization facilities at home and abroad in capital investment at installation stage, the consumption of neutralizing chemicals at operation stage and the requirements of installation site. Whangji area where the prototype water treatment equipment is installed has been sustaining a short supply of usable water, especially in dry seasons and supplementing about 40㎥ of water brought from a location farther than 4km in distance to meet water requirements. The prototype water treatment equipment is however considered capable of providing compressor cooling water in sufficient amount from winter season In the future.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

The Open Top Construction Method for the PHWR Reactor Building (중수로형(重水爐形) 원자로 건물의 Open Top시공공법)

  • 이수득
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.3
    • /
    • pp.41-45
    • /
    • 2001
  • The nuclear power plant(NPP) construction is a mammoth project, which requires a huge construction budget and the long construction duration of about 7 years. Recently there is a trend to shorten the construction period, to save the construction cost and to ensure the competitiveness through adopting the open top construction method. In this method, the major equipment are moved into the building through its top, and the internal works of the reactor building are being in process without installation of a dome roof.

  • PDF

New Trends of Non-Traditional Machining Technology (특수가공기술의 최신동향)

  • 김정두
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.2
    • /
    • pp.10-13
    • /
    • 2001
  • Workpiece materials may be relatively easy to machine by traditional methods but workpiece geometry also may be a constraint. Many shapes that are geometrically difficult to handle conventionally may be candidates for nontraditional processes. Nontraditional processes provide new opportunities for product design innovation and productivity improvements. Difficult-to-machine materials of geometric shapes difficult o produce with traditional equipment and tooling, may often be easily and cost effectively machined using nontraditional processes. Notraditional machining processes are relative newcomers o the manufacturing arena. Nontraditional chemical solutions, or even electrolytic current as the working medium rather than a conventional cutting tool or abrasive to remove or shape materials.

  • PDF

Anodic Oxidation (양극 산화)

  • 노해용
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.6
    • /
    • pp.16-23
    • /
    • 2000
  • Anodizing processes is the conversion of the aluminum surface to aluminum oxide while the part is the anode in an electrolytic cell. The object of the anodizing was increased corrosion resistant, paint adhesion and was provided unique, decorative colors. Many electrolytes, under different conditions, have been used for the anodic oxidation of alumminum and its alloys. This paper deals with the procedures used in the anodic oxidation of aluminum and its alloys, the nature and properties of the oxide films, their uses and anodizing equipment and process control.

  • PDF

A Photocatalytic Treatment equipment of Volatile Organic Compounds (광촉매를 이용한 휘발성유기화합물의 처리장치)

  • 유재흥;김태관;유진승;김광;김혜경;박윤창;이승호
    • Environmental engineer
    • /
    • s.176
    • /
    • pp.58-63
    • /
    • 2001
  • 여러 환경정화 방법들 중 광촉매를 이용한 처리기술들이 관심을 모으고 있다. 광에 의해 활성을 갖는 여러 촉매들 가운데 이산화티타늄($TiO_2$)을 중심으로 한 연구가 가장 활발히 진행되고 있다. 본 연구는 TiO2를 개질화하여 광활성이 우수한 광촉매를 개발하고 이를 이용한 VOC 처리를 목적으로 하고 있다. VOC 중 할로겐화(halogenated)된 것들의 처리는 매우 어려우며 현재의 소각방식으로는 효과적으로 처리되고 있지 않다.

  • PDF

Development of thermal-drying system and equipment for sewage/waste water sludge ($\cdot$폐수 슬러지 열건조 시스템 및 장치개발 <연속감압식 간접 열건조 시스템>)

  • 허병수;신용한;김태훈;장당엽;안영철
    • Environmental engineer
    • /
    • s.182
    • /
    • pp.62-67
    • /
    • 2001
  • 본 연구에서는 기존의 로터리 방식이나 플래시 방식 등의 직접열에 의한 건조방식이 2차 공해 유발 및 폭발이나 화재의 위험을 항상 내포하는 등 여러 가지 단점이 있으므로 이러한 문제점을 연속 감압식 간접열 방식의 건조장치를 개발하여 근원적으로 해결하고자 하였다. 본 연구의 목표는 50kg/hr용량의 연속 감압식 간접열 방식의 디스크 건조장치를 개발하여 건조효율을 70$\%$ 이상 향상시키며(기존의 제품은 50$\%$

  • PDF

A Study on a Neutralization Treatment Facility Design of an Acid Mine Drainage for Colliery (석탄광 산성항내배수의 중화 처리시설 설계에 관한 연구)

  • 이춘택
    • Journal of the Korean Professional Engineers Association
    • /
    • v.18 no.1
    • /
    • pp.1-17
    • /
    • 1985
  • This report is prepared to assist designers acid mine drainage treatment plants. Example of a treatment facility design is included, delineating general equipment specification and cost breakdowns. The purpose of this outline is to give the designer insight into tile evaluation of possible alternative and justification for choosing a certain method or process and also this report will allow designers to derive and estimated budget number for capital expenditures.

  • PDF