• Title/Summary/Keyword: Energy plant

Search Result 3,892, Processing Time 0.026 seconds

Evaluation of Pb (II) and Cd (II) biosorption from aqueous solution by Ziziphus lotus stem powder (ZLSP)

  • Nosair El Yakoubi;Mounia Ennami;Naouar Ben Ali;Zineb Nejjar El Ansari;Mohammed L'bachir EL KBIACH;Loubna Bounab;Brahim El Bouzdoudi
    • Membrane and Water Treatment
    • /
    • v.15 no.2
    • /
    • pp.89-98
    • /
    • 2024
  • The ability of Zizyphus lotus stem powder (ZLSP) to remove Pb (II) and Cd (II) ions from an aqueous solution was evaluated. The present phenomenon of biosorption was revealed to depend on pH, biosorbent dosage, temperature, initial ionic concentration, time of contact and biosorbent's particle size. The sorption process was exothermic (∆H°<0), and showing a strong Pb(II)/Cd(II)-ZLSP affinity (∆S°>0). Gibbs free energy data (∆G°<0, and decreases as temperature increase) reveals that the process studied is characterized by its feasibility and spontaneous nature. The best fits of the equilibrium data were obtained by the Temkin model and the Langmuir model. The maximum Pb(II)/Cd(II)-ZLSP biosorption capacities were 33.02 mg/g for Pb (II) and 20.73 mg/g for Cd (II). The pseudo-second order model was the most appropriate for fitting the kinetic data. The characterization of the biochemical groups essentially involved in the sorption phenomenon was made possible by FTIR spectral analysis. The capacity of ZLSP as an effective and ecofriendly biosorbent is confirmed through this study.

A Study on Program Development for Pipe Hanger & Support Design in Plant (플랜트 배관지지대의 설계 프로그램 개발에 대한 연구)

  • Shin-hyun Kang;Wang-do Lee;Sun-chul Huh
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.5
    • /
    • pp.1129-1136
    • /
    • 2024
  • This study aims to present a method for reducing human error, time spent on design, and waste of design manpower when designing plant pipe hanger & support using sketches based on piping and steel structure drawings in plant. The method involves organizing the pipe hanger & support design process based on codes and standards and developing a program to facilitate this. The design of whole plant systems, including pipe hangers & supports, is conducted within 3D plant CAD software that applies BIM (Building Information Modeling). All attribute information of the pipe hanger & support is digitized as a digital asset, and the design is executed as an add-in module. This module is then used for BOM(generating Bill of Materials) and installation drawings, which are essential for the fabrication and on-site installation of pipe hangers & supports.

Study on Flow-Shifted Region Depending on Spool Displacement in Hydraulic Servo Valve with Hybrid Lap (하이브리드 랩 방식 유압 서보 밸브의 스풀 변위에 따른 유동 천이 영역에 대한 연구)

  • Jeong, Hwang-Hun;Yun, So-Nam;Lee, Sung-Soo;Yang, Joo-Ho
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.37 no.3
    • /
    • pp.213-219
    • /
    • 2013
  • This study examined the static characteristics of a spool valve with a hybrid lap between the spool land and the sleeve. The static equation for the pressure characteristics was derived from flow equations that depend on the spool displacement, and the final model was derived from $q_a=q_b=0$ because the pressure characteristics test needs to block the control port in the valve. The static equation for the flow characteristics was derived from the pressure characteristics when the control port is open ($q_a=q_b$, $p_a=p_b$). The characteristic equation in the shifted region was assumed from the proportional relationship between the pressure-flow characteristics and the spool displacement.

Semantic Network Analysis on Teen's Perceptual Construct about Nuclear Power (고등학생들의 원자력 인식구조에 대한 언어 연결망 분석)

  • Kim, Bong-Chul;Chung, Woon-Kwan;Choi, Myung-Il
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.7
    • /
    • pp.578-590
    • /
    • 2015
  • This paper investigated how high school students perceive on nuclear power applying semantic network analysis. The total number of 250 high school students in 6 metropolitan areas responded to the survey. Results indicate that the word which most frequently appeared is 'Nuclear plant' (87 times) following by 'Japan' (71 times), 'Danger'(59 times), 'Fukushima' (59 times), 'Radioactivity' (56 times), 'Energy' (47 times), 'Youngkwang' (37 times), 'Electricity' (30times), 'Chernobyl' (29 times), 'Explosion' (25 times). For students in higher acceptance level of nuclear 'Radioactivity' (25 times) was most frequently showed up following by 'Fukushima' (23 times), 'Energy' (21 times), 'Japan' (21 times), Nuclear plant' (20 times), 'Danger' (17 times), 'Youngkwang' (16 times). For student in lower acceptance level of nuclear, the word of 'Nuclear plant' (40 times) most frequently appeared following by 'Japan' (31 times)', 'Danger' (29 times), 'Fukushima' (23 times), 'Radioactivity' (17 times), 'Energy' (16 times), 'Youngkwang' (16 times), 'Chernobyl' (15 times).

Numerical Modeling on the Change in Discharge Performance of the Sluice for Tidal Power Plant According to the Apron Shape (물받이 형상에 따른 조력발전용 수문의 통수성능 변화 수치모델링)

  • Oh, Sang-Ho;Han, In-Suk;Kim, Gunwoo;Jeong, Weon-Mu
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.2
    • /
    • pp.94-102
    • /
    • 2013
  • In this study, numerical modeling was performed to investigate influence of the apron shape on the discharge performance of the sluice for tidal power plant. The numerical modeling was carried out for comparison of the difference in the discharge coefficient when the apron width, slope, and the length of the horizontal section were different, without considering change in the shape of the sluice caisson itself. The modeling result showed that significant discrepancy in terms of the overall discharge performance appeared according to the apron geometry. In order to achieve maximum discharge performance of the sluice caisson, it is desirable to make the design by putting a space equivalent to the width of the sluice caisson on its both sides, by making the apron slope be 1:5, and by keeping length of the horizontal section to be 50 m that is corresponding to the streamwise length of the sluice caisson.

An Application of Realistic Evaluation Methodology for Large Break LOCA of Westinghouse 3 Loop Plant

  • Choi, Han-Rim;Hwang, Tae-Suk;Chung, Bub-Dong;Jun, Hwang-Yong;Lee, Chang-Sub
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.513-518
    • /
    • 1996
  • This report presents a demonstration of application of realistic evaluation methodology to a posturated cold leg large break LOCA in a Westinghouse three-loop pressurized water reactor with 17$\times$17 fuel. The new method of this analysis can be divided into three distinct step: 1) Best Estimate Code Validation and Uncertainty Quantification 2) Realistic LOCA Calculation 3) Limiting Value LOCA Calculation and Uncertainty Combination RELAP5/MOD3/K [1], which was improved from RELAP5/MOD3.1, and CONTEMPT4/MOD5 code were used as a best estimate thermal-hydraulic model for realistic LOCA calculation. The code uncertainties which will be determined in step 1) were quantified already in previous study [2], and thus the step 2) and 3) for plant application were presented in this paper. The application uncertainty parameters are divided into two categories, i.e. plant system parameters and fuel statistical parameters. Single parameter sensitivity calculations were performed to select system parameters which would be set at their limiting value in Limiting Value Approach (LVA) calculation. Single run of LVA calculation generated 27 PCT data according to the various combinations of fuel parameters and these data provided input to response surface generation. The probability distribution function was generated from Monte Carlo sampling of a response surface and the upper 95$^{th}$ percentile PCT was determined. Break spectrum analysis was also made to determine the critical break size. The results show that sufficient LOCA margin can be obtained for the demonstration NPP.

  • PDF

Experimental Investigation on the Efficiency of Reducing Air Bubble Formation by Installing Horizontal Porous Plate in the Submerged Outlet Structure of Power Plant (발전소 수중방류구조 내 수평유공판 설치에 따른 거품발생 저감효과에 관한 실험적 연구)

  • Oh, Sang-Ho;Oh, Young-Min;Kang, Keum-Seok;Kim, Ji-Young
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.5
    • /
    • pp.472-481
    • /
    • 2008
  • In this study hydraulic experiment was carried out to investigate the flow characteristics in the submerged outlet structure of Boryeong power plant and the efficiency of bubble reduction by installing horizontal porous plate in the outlet structure. The cross-sectional mean velocity in the submerged outlet structure was smaller than 1 m/s, the target value at the design stage to prevent bubble outflow to the open sea area. In addition, it was found that the maximum depth of bubble penetration is reduced 30 to 50% by installing the horizontal porous plate at the second falling location in the submerged outlet structure. It is expected that the total bubble amount entrained in the water will be most efficiently reduced by installing square-hole-shape porous plate of 20 cm hole size and making its central section as non-porous structure to dissipate the energy of falling water.

Optimal Reserve Allocation to Maximize Kinetic Energy in a Wind Power Plant

  • Yoon, Gihwan;Lee, Hyewon;Lee, Jinsik;Yoon, Gi-Gab;Park, Jong Keun;Kang, Yong Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.5
    • /
    • pp.1950-1957
    • /
    • 2015
  • Modern wind generators (WGs) are forced or encouraged to participate in frequency control in the form of inertial and/or primary control to improve the frequency stability of power systems. To participate in primary control, WGs should perform deloaded operation that maintains reserve power using speed and/or pitch-angle control. This paper proposes an optimization formulation that allocates the required reserve to WGs to maximize the kinetic energy (KE) stored in a wind power plant (WPP). The proposed optimization formulation considers the rotor speed margin of each WG to the maximum speed limit, which is different from each other because of the wake effects in a WPP. As a result, the proposed formulation allows a WG with a lower rotor speed to retain more KE in the WPP. The performance of the proposed formulation was investigated in a 100-MW WPP consisting of 20 units of 5-MW permanent magnet synchronous generators using an EMTP-RV simulator. The results show that the proposed formulation retains the maximum amount of KE with the same reserve and successfully increases the frequency nadir in a power system by releasing the stored KE in a WPP in the case of a disturbance.

Localization of solar-hydrogen power plants in the province of Kerman, Iran

  • Mostafaeipour, Ali;Sedaghat, Ahmad;Qolipour, Mojtaba;Rezaei, Mostafa;Arabnia, Hamid R.;Saidi-Mehrabad, Mohammad;Shamshirband, Shahaboddin;Alavi, Omid
    • Advances in Energy Research
    • /
    • v.5 no.2
    • /
    • pp.179-205
    • /
    • 2017
  • This research presents an in-depth analysis of location planning of the solar-hydrogen power plants for electricity production in different cities situated in Kerman province of Iran. Ten cities were analyzed in order to select the most suitable location for the construction of a solar-hydrogen power plant utilizing photovoltaic panels. Data envelopment analysis (DEA) methodology was applied to prioritize cities for installing the solar-hydrogen power plant so that one candidate location was selected for each city. Different criteria including population, distance to main road, flood risk, wind speed, sunshine hours, air temperature, humidity, horizontal solar irradiation, dust, and land costare used for the analysis. From the analysis, it is found that among the candidates' cities, the site of Lalezar is ranked as the first priority for the solar-hydrogen system development. A measure of validity is obtained when results of the DEA method are compared with the results of the technique for ordering preference by similarity to ideal solution (TOPSIS). Applying TOPSIS model, it was found that city of Lalezar ranked first, and Rafsanjan gained last priority for installing the solar-hydrogen power plants. Cities of Baft, Sirjan, Kerman, Shahrbabak, Kahnouj, Shahdad, Bam, and Jiroft ranked second to ninth, respectively. The validity of the DEA model is compared with the results of TOPSIS and it is demonstrated that the two methods produced similar results. The solar-hydrogen power plant is considered for installation in the city of Lalezar. It is demonstrated that installation of the proposed solar-hydrogen system in Lalezar can lead to yearly yield of 129 ton-H2 which covers 4.3% of total annual energy demands of the city.

Effect of Surfactant-Coated Charcoal Amendment on the Composting Process and Nutrient Retention

  • Pinwisat, Phetrada;Phoolphundh, Sivawan;Buddhawong, Sasidhorn;Vinitnantharat, Soydoa
    • Environmental Engineering Research
    • /
    • v.19 no.1
    • /
    • pp.37-40
    • /
    • 2014
  • This research investigates the quality changes during composting of bagasse and pig manure amended with 30% of surfactant-coated charcoal (SC). Two treatments, 30% uncoated charcoal (UC) amendment and no charcoal (NC) amendment, were done as control. Charcoal was coated with 0.37 mM tetradecyltrimethylammonium bromide (TDMA), a cationic surfactant, at the dosage of 10 g/L. At the end of the composting period, the carbon to nitrogen (C/N) ratio of SC amendment was 9.7; whereas, the C/N ratios of UC and NC amendment were 12.6 and 21.4, respectively. Plant nutrients contents of the compost produced from SC amendment were 20.7 mg $NH_4{^+}-N/g$, 42.8 mg $NO_3{^-}-N/g$, and 41.7 mg P/g. High nitrate and phosphate concentrations in SC amendment were due to the adsorption of these anions on the positive charge of TDMA. Desorption of plant nutrients retained in the compost pellets was also investigated. It was predicted that nitrate was fully desorbed from a pellet at 23 days for SC amendment, which was later than UC (14 days) and NC (10 days) amendment. A slow release of nitrate from the compost pellet will reduce the nitrate leaching into the environment. Thus, the adding of SC in the compost pile is one of the alternative methods to improve the quality of compost and plant nutrient retention.