• 제목/요약/키워드: Energy plant

Search Result 3,892, Processing Time 0.031 seconds

Spectral analysis for thermal discharge of Hadong Power Plant (하동화력 발전소 온배수에 대한 Spectrum 분석)

  • Park, Il-Heum;Lee, Geun-Hyo
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.435-440
    • /
    • 2006
  • In order to understand changes of water temperature for thermal discharge of Hadong power plant in Gwangyang and Jinju Bay, it was analyzed for temperature data of representative season by MEM(Maximum entropy method) that is one of the spectral analysises. And due to understand effect of thermal discharge at each point, analyzed spectral data showed reactive energy rate of reference point by calculating energy from 24 time period to height frequency zone. As a result of spectral analysis, it showed that there were 9 points which are largely effected, 7 points which will be estimated, 6 points which is difficult to estimate, 14 points which rarely effected by thermal discharge.

  • PDF

Development of Predictive Model for Pollutants Emission from Power Plants (발전소의 대기오염물질 배출 예측 모델 개발)

  • 김민석;김경희;이인범
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.4
    • /
    • pp.543-550
    • /
    • 1998
  • From the power plant in a steel plant, environment pollutants such as $SO_x$, $NO_x$, CO and $CO_2$ are emitted by combustion reactions of the fuels which are by-product gases, oil and liquefied natural gas(LNG). To reduce the amounts of the pollutants, it is important to build a predictive model for the emission of the pollutants. In this paper, model that predict the amounts of generated pollutants for the used fuel is developed by using Gibbs free energy minimization method[1] with the temperature correction technique. For some data set, the calculation results from this model are compared with the real emission amounts of $SO_x$, $NO_x$, and the result of the calculation by both ASPEN PLUS which is a commercial simulation software. This model shows good results and can be applied to other power plants.

  • PDF

The study on Estimate of Tidal Power Using Matlab T-tide Based on Tide Prediction (Matlab T-tide를 이용한 조위예측기반의 조력발전량 산정에 관한 연구)

  • Lee, Sung-Hun;Kwak, Hee-Jin;Kim, Jong-Deug;Lee, Eun-Chun;Kim, Ji-Chan;Jeon, Kyeong-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1048-1049
    • /
    • 2015
  • The sihwa tidal power plant is the first tidal power plant in korea and the biggest of the world. The tidal power turbine is operated by tidal energy. The tidal energy is generated by the relative motion of the earth and celestial masses specially the sun and the moon, which interact via gravitational forces. The tidal power is estimated by the predicted the tidal amplitude and phase. This paper gives a process of estimate of tidal power using Matlab T-tide based on tide prediction. The proposed method is tested using actual recorded data comparing to predicted date.

  • PDF

Optimization of Grid Network for Offshore Wind Power Plant (해상풍력발전단지의 전력망 구성의 최적화에 관한 연구)

  • Moon, Won-Sik;Jo, Ara;Kim, Jae-Chul;Bae, In-Soo;Yoon, Gi-Gab;Park, Sang-Ho;Choy, Young-Do
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1094-1095
    • /
    • 2015
  • The costs of installation, loss, and energy not supplied energy for submarine cable of offshore wind power plant (OWPP) are very high because the level of technology is still in the early stage as well as because of the marine environments. Therefore, reducing the total costs of a grid network for OWPPs is very important for financial feasibility. In particular, it is needed to minimize the project cost for optimizing the grid design and offshore substation location of a OWPP. The suggested method can reduce the total system cost and make it lower compared with existing methods.

  • PDF

Modeling for the Automation of Start-up Operation in Boiler Plant (보일러 플랜트의 Start-Up 운전자동화를 위한 모델링)

  • 윤영진;황규석
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.1
    • /
    • pp.60-70
    • /
    • 1997
  • Since, human error is a major factor contributing to disaster during start-up of operation in Boiler plant. it is necessary to develop an automation system which prevent mode of operation that are known to be dangerous and to bring a loss of energy. The aim of this study is to suggest a model for the computer-aided synthesis of operation sequence as a part of automation system for start-up operation. Synthesis is accomplished by the formation of a hierarchical network of goals which decide sequence of operations. Hierarchical Network is formed by using method which upper goals ( i.e. upper operation al situation) are classified by the function of themselves into lower goals (i.e. lower operational situation). Knowledge for deciding operation sequence is generated by putting In order the knowledge of hazard operation and energy management.

  • PDF

Thermoeconomics Analysis to apply net concept of material flow to Power System (발전시스템에 물질흐름의 net 개념을 적용한 열경제학 해석)

  • Kim, Deok-Jin
    • Proceedings of the KSME Conference
    • /
    • 2000.04b
    • /
    • pp.962-969
    • /
    • 2000
  • Quality that character of energy is the same at every state in case of equal working fluid and net concept of material flow was applied to thermoeconomics about energy system, and we could naturally explain the suitable degree about this concept, also thermoecomic equations about general power plant was easily deduced. And deduced equations exactly corresponded with principle of thermoeconomics that overall input cost flow rate equal overall output cost flow rate. This equations is applied to gas turbine cogeneration power plant as one example and found the product unit cost. Also this product cost comparison could been naturally explained.

  • PDF

Prediction of Tidal Regime According To Garolim Tidal Power Plant operation (가로림만 조력발전소 가동에 따른 조석체계 변화 예측)

  • Kang, Sok-Kuh;Lee, Kwang-Soo;Park, Jin-Soon;Yum, Ki-Dai;Jung, Kyung-Tae;Jang, Chan-Joo
    • New & Renewable Energy
    • /
    • v.3 no.2 s.10
    • /
    • pp.3-10
    • /
    • 2007
  • Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.

  • PDF

Development of the Virtual Reality Plant for Nuclear Power Plant (원자력발전소를 위한 강의실용 가상발전소 교육훈련 시스템 개발)

  • 홍진혁
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2003.05a
    • /
    • pp.391-398
    • /
    • 2003
  • 지금까지 전범위 시뮬레이터에 의해 이루어진 원자력 및 화력발전소에서의 운전원교육은 실제 발전소 주제어실과 유사한 상황을 전개한다는 장점을 가지고 있으나, 주요 계통 및 기기에 대한 설명을 위해서는 교과서를 공유하거나, 강사의 지식을 칠판에 서술하는 방법으로만 진행되어 왔다. 전력연구원은 이러한 교육을 상당부분 강의실 컴퓨터를 이용하여 수행할 수 있다는데 착안하여 강의실용 가상발전소 교육훈련 시스템(VRPLANT)을 개발하였다. VRPLANT는 3차원 웹(Web) 기술을 적용하여 발전소 건물, 건물내의 주요기기 등을 3차원 가상공간에서 구축하여 Navigation할 수 있도록 하였으며, 주요기기에 대해서는 엔지니어링 데이터베이스가 연동되어 있어서 이동 중에 특정 기기를 선택하면 P&ID, 논리도면, 기술설명서 등을 참조해 볼 수 있도록 개발하였다. 또한 기기들은 모니터상에서 분해 및 조립이 가능하여 기기의 형태, 내부구조 및 동작원리 등을 용이하게 이해할 수 있도록 하였다.

  • PDF

PERIODIC SAFETY REVIEW ON KORI UNIT 1 (고리 1호기 주기적안전성 평가)

  • Kim, Tae-Ryong
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2003.05a
    • /
    • pp.403-414
    • /
    • 2003
  • Periodic safety review on Kori Unit 1 has been successfully done for the first time in Korea. 11 safety factors of the review were fully evaluated in accordance with the domestic legal system. Although it is the oldest nuclear power plant in Korea, Kori Unit 1 was found to have maintained good operating conditions and continuously enhanced its safety by implementing post-TMI action plans and other safety issues, such as replacing steam generators and process/control system. It can be therefore confirmed that safe operation of Kori Unit 1 is guaranteed until next periodic safety review. Nevertheless, some corrective action items were recommended to enhance further its safety level, such as equipment qualification, additional ageing management program, strengthening of some procedures related to administration and human factor. The results of PSR can be utilized for the continued operation beyond the design life as long as the plant safety is maintained and improved. Experiences of the PSR on Kori Unit 1 can be also applied to PSR on other plants.

  • PDF

Development of Westinghouse 950 MWe-type NPA (WH형 950MWe 원전 운전최적분석기 개발)

  • 홍진혁
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2003.05a
    • /
    • pp.473-483
    • /
    • 2003
  • 본 논문은 안전해석 등에 사용되는 RETRAN-3D 등 최적해석 코드를 기반으로 하면서도 복잡한 하드웨어 없이 간편한 GUI (Graphic User Interface)를 이용하여 광범위한 발전소 과도상태를 해석하기 위한 다양한 기능을 통해 시뮬레이션 조작을 쉽게 할 수 있는 웨스팅하우스형 950MW급 최적 원전운전분석기 (Nuclear Plant Analyzer)를 다루고자 한다. WH형 950MW 원전 운전최적분석기는 기존의 단순한 Point Kinetics 모델이 아닌 정교한 3D 실시간 노심모델과 RETRAN 코드를 기반으로 하는 실시간 NSSS 열수력 모델 (ARTS)이 통합된 모델을 갖추고 있으며, 해당형식발전소 (WH 3 Loop PWR Plant : 고리 3,4호기, 영광1,2호기 원전)의 여러 가지 과도사고를 실시간으로 정상, 비정상, 비상운전 등으로 모의할 수 있도록 개발되었다. 모의결과 주요 과도 상태의 결과가 해석한 결과와 잘 일치하였으며, 해당형식 발전소 과도 분석이나 규제요원 훈련에 이용될 계획이다.

  • PDF