• Title/Summary/Keyword: Energy plant

Search Result 3,892, Processing Time 0.034 seconds

Estimation of energy self-sufficiency in municipal wastewater treatment plant using photovoltaic power simulated by azimuth and hydrophilic coating (방위각과 초친수코팅에 따른 태양광발전량 시뮬레이션과 하수처리장 에너지자립율 산정)

  • An, Young-Sub;Kim, Sung-Tae;Kang, Ji-Hoon;Chae, Kyu-Jung;Yoon, Jong-Ho
    • KIEAE Journal
    • /
    • v.11 no.6
    • /
    • pp.133-138
    • /
    • 2011
  • This paper presents energy self-sufficiency simulated in municipal wastewater treatment plants (WWTPs) by adopting solar energy production systems that were simulated by varying azimuth and super-hydrophilic coating on the surface of photovoltaic (PV). Relative to the national average energy consumption in WWTPs, the employment of 100 kW PV system was simulated to achieve 2.75% of energy self-sufficiency. The simulated results suggested that the installation of PVs toward South or Southwest would produce the highest energy self-sufficiency in WWTPs. When super-hydrophilic coating was employed in the conventional PV, 5% of additional solar energy production was achievable as compared to uncoated conventional PV. When 100 kW of PV system was installed in a future test-bed site, Kihyeung Respia WWTP located in Yongin, South Korea, the energy self-sufficiency by solar power was simulated to be 1.77%. The simulated solar power production by azimuth and super-hydrophilic coating will be useful reference for practitioners in designing the solar PV systems in the WWTPs.

Stabilization technology of biogas plant applied recovery system (Recovery system 적용을 통한 바이오가스플랜트의 안정화 기술)

  • Jang, Byoungin;Jeoung, Mihwa;Cho, Yoonmi;Jo, Yongil;Park, Kyungho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.102.2-102.2
    • /
    • 2010
  • We are to evaluate the stabilization technology of actual biogas plant facilities, which is operating currently. It describes the traits of the consistent facilities of mesophilic anaerobic digestion using Unison Biogas plant Recovery system(UBR). Also the economical efficiency is examined with the electric power sales earnings and applying the deserted heating by generating electric power, which is generated by operated combined heat and power using biogas produced by mesophilic anaerobic digestion. We have generated the 481,113kw for electric power and 1,376Gcal for thermal energy simultaneously. If these electric power and thermal energy are converted into diesel, we can achieve savings equal to 114,300L, and 152,109L in the quantity of heat. Finally, if CDM, RPS, liquid fertilizer sales business, etc. is activated, the earnings will be expected to improve dramatically and is considered to contribute a drop of the greenhouse gas.

  • PDF

Numerical Analysis of Wave-induced Motion of Floating Pendulor Wave Energy Converter (부유식 진자형 파력발전 장치의 파랑운동 수치해석)

  • Nam, Bo-Woo;Hong, Sa-Young;Kim, Ki-Bum;Park, Ji-Yong;Shin, Seung-Ho
    • Journal of Ocean Engineering and Technology
    • /
    • v.25 no.4
    • /
    • pp.28-35
    • /
    • 2011
  • In this paper, the wave-induced motion characteristics of a floating pendulor are investigated numerically. A floating pendulor is a movable-body-type wave energy converter. This device consists of three main parts (floater, pendulum, and damping plates). In order to obtain the hydrodynamic coefficients and wave exciting forces acting on floating bodies, a higher-order boundary element method (HOBEM) using a wave Green function is applied to the present problems. The hinged motion of a pendulum is simulated by applying the penalty method. In order to obtain a more realistic motion response for a pendulor, numerical body damping is included. First, the wave force and motion characteristics of just a floater are observed with respect to different shape parameters. Then, a coupled analysis of a floater, pendulum, and damping plates is carried out. The relative pitch velocity and wave forces acting on the floating pendulor are compared with those of a fixed pendulor.

Reactor Power Cutback System Test Experience at YGN 4

  • Chi, Sung-Goo;Kim, Se-Chang;Seo, Jong-Tae;Eom, Young-Meen;Wook, Jeong-Dae;Park, Young-Boo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.10a
    • /
    • pp.235-241
    • /
    • 1995
  • YGN 3 and 4 are the nuclear power plants having System 80 characteristics with a rated thermal output of 2815 MWth and a nominal net electrical output of 1040 MWe. YGN 3 achieved commercial operation on March 31, 1995 and YGN 4 completed Power Ascension Test (PAT) at 20%, 50%, 80% and 100% power by September 23, 1995. YGN 3 and 4 design incorporates the Reactor Power Cutback System (RPCS) which reduces plant trips caused by Loss of Load (LOL)/Turbine Trip and Loss of One Main Feedwater Pump (LOMFWP). The key design objective of the RPCS is to improve overall plant availability and performance, while minimizing challenges to the plant safety systems. The RPCS is designed to rapidly reduce reactor power by dropping preselected Control Element Assemblies (CEAs) while other NSSS control systems maintain process parameters within acceptable ranges. Extensive RPCS related tests performed during the initial startup of YGN 4 demonstrated that the RPCS can maintain the reactor on-line without opening primary or secondary safety valves and without actuating the Engineered Safety Features Actuation System (ESFAS). It is expected that use of the RPCS at YGN will increase the overall availability of the units and reduce the number of challenges to plant safety systems.

  • PDF

Analysis on Negative Media Report of Wolsong Nuclear Power Plant's Heavy Water Leakage: Analysis on Daily Newspaper Report of Wolsong Nuclear Power Plant's Heavy Water Leakage Incident during the Month of October 1999 (월성 원자력발전소 중수 누출에 대한 언론의 부정적 보도 분석 : 주요 일간지의 1999년 10월 한 달간 월성 원자력발전소 중수 노출 사고 기사 내용 분석)

  • Lee, Sang Dae
    • Journal of Energy Engineering
    • /
    • v.21 no.3
    • /
    • pp.203-210
    • /
    • 2012
  • Nuclear power provides 30% of our country's power, which acts as one of the most important power sources. But on March 11, 2011, the earthquake that hit Northeast Japan with a 9.0 magnitude, known as the Fukushima Reactor Leak Incident has created fear in the public's mind that 'nuclear power is unstable'. The reason for such distrust are many but inaccurate reports of the incident by the media has added to the fear. This paper will analyze the contents of the media report of the heavy water leakage in reactor 3 at the Wolsong Nuclear Power Plant on October 4, 1999 to discover the problematic areas and ascertain a more appropriate method of media coverage.

Reevaluation of Seismic Fragility Parameters of Nuclear Power Plant Components Considering Uniform Hazard Spectrum

  • Park, In-Kil;Choun, Young-Sun;Seo, Jeong-Moon;Yun, Kwan-Hee
    • Nuclear Engineering and Technology
    • /
    • v.34 no.6
    • /
    • pp.586-595
    • /
    • 2002
  • The Seismic probabilistic risk assessment (SPRA) or seismic margin assessment (SMA) have been used for the seismic safety evaluation of nuclear power plant structures and equipments. For the SPRA or SMA, the reference response spectrum should be defined. The site-specific median spectrum has been generally used for the seismic fragility analysis of structures and equipments in a Korean nuclear power plant Since the site-specific spectrum has been developed based on the peak ground motion parameter, the site-specific response spectrum does not represent the same probability of exceedance over the entire frequency range of interest. The uniform hazard spectrum is more appropriate to be used in seismic probabilistic risk assessment than the site- specific spectrum. A method for modifying the seismic fragility parameters that are calculated based on the site-specific median spectrum is described. This simple method was developed to incorporate the effects of the uniform hazard spectrum. The seismic fragility parameters of typical NPP components are modified using the uniform hazard spectrum. The modification factor is used to modify the original fragility parameters. An example uniform hazard spectrum is developed using the available seismic hazard data for the Korean nuclear power plant (NPP) site. This uniform hazard spectrum is used for the modification of fragility parameters.

Public-Private Cooperation in the Package Deal for Overseas Energy Resources Acquisition (에너지자원획득을 위한 패키지딜 적용시 민관협력 강화 방안)

  • Park, Dae-Young;Hur, Jin-Huek;Lee, Tae-Gu;Moon, Seung-Jae;Lee, Jae-Heon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.4 no.2
    • /
    • pp.73-78
    • /
    • 2008
  • The public-private cooperation in package deal has been studied for the overseas energy resources acquisition. The effectiveness of the package deal has not been successful because the deal has led by the government organizations. It is difficult for the plant EPC companies to join the packaged deal due to the lack of the whole responsibility organization to support the participation of the package deal. The followings are suggested as the ways to strengthen of the public-private cooperation in this study. 1) the relevant public enterprise privatization 2) establishment of the joint model for leading the plant EPC companies to the package deal 3) establishment of the whole responsibility organization for the public-private cooperation.

  • PDF

A Study on Accuracy Detection Method for Signal Peak Voltage (신호용 PEAK 전압 정밀검출에 관한 연구)

  • Park, Ho-Chul;Sung, Hyung-Su;Han, Seung-Moon;Han, Jeong-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2528-2530
    • /
    • 2000
  • In general, Diode makes a major role in electronic circuit. For example, switching of rectifier, cross current of switching rectifier, energy transfer of electronic element and reverse charge of capacitor, voltage insulation, energy feedback from load to power supply, and such as recovery of storaged energy. Generally, We regard power diode as ideal element, but it has a certain boundary actually, specially, We use diode for detecting circuit peak hold voltage signal. It has cut in voltage. It occurs error of measurement value namely. This error, below in region diode voltage drop (0.7v) measurement value is wholesome signal, Specially, We can not get precision data. Therefore, precision level is low between theoretical and measurement data because of error in actual circuit. Conclusionally, In this paper, We define the error concerning to the power diode characteristics which is used detecting of the minute signal, and recommend the method that minimize measurement error.

  • PDF

Fire Simulations for the Abandonment Risk Assessment of Main Control Room Fire in Domestic Nuclear Power Plant (국내 원자력발전소의 주제어실 화재 피난 리스크 평가를 위한 화재 시뮬레이션)

  • Kang, Dae Il;Kim, Kilyoo;Jang, Seung-Cheol;Yoo, Seong Yeon
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.199-207
    • /
    • 2014
  • In this paper, to systematically assess the abandonment risk of main control room (MCR) fire, fire simulations with Fire Dynamics Simulator were performed and abandonment probabilities were estimated for the MCR bench-board fire of domestic reference nuclear power plant. The fire simulation scenarios performed in this study included propagating and non-propagating fires of the MCR bench-board, and the availability and unavailability of heating, ventilation, and air conditioning system (HVACS). The following results were obtained. First, temperature was the major abandonment impact factor for the MCR bench-board fire if the HVACS was available and optical density was that if the HVACS was unavailable. Second, the fire scenario contributing the MCR bench-board fire abandonment risk was identified to be only the propagating fire. Third, it was confirmed that the abandonment probability of the MCR bench-board fire for domestic reference nuclear power plant could be reduced by using the fire modeling.

Analysis of Performance Characteristic for Small Scale Hydro Power Plant with Long Term Inflow Condition Change (장기유입량 변화에 의한 소수력발전소 성능특성분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • New & Renewable Energy
    • /
    • v.5 no.4
    • /
    • pp.39-43
    • /
    • 2009
  • The variation of inflow at stream and hydrologic performance for small scale hydro power(SSHP) plants due to climate change have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for SSHP plants is established. Monthly inflow data measured at Andong dam for 32 years were analyzed. The existing SSHP plant located in upstream of Andong dam was selected and analyzed hydrologic performance characteristics. The predicted results from the developed models show that the data were in good agreement with measured results of long term inflow at Andong dam and the existing SSHP plant. Inflow and ideal hydro power potential had increased greatly in recent years, however, these did not lead annual energy production increment of existing SSHP plant. As a results, it was found that the models represented in this study can be used to predict the primary design specifications and inflow of SSHP plants effectively.

  • PDF