• Title/Summary/Keyword: Emergency power supply

Search Result 119, Processing Time 0.034 seconds

Improved DC-DC Bidirectional Converter (개선된 DC-DC 양방향 컨버터)

  • Kim, Seong-Hwan;Hur, Jae-Jung;Jeong, Bum-Dong;Yoon, Kyoung-Kuk
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.76-82
    • /
    • 2017
  • Since the introduction of electronically controlled engines and electric propulsion ships, the need for an uninterruptible power supply for emergency power supply devices that use batteries has gained importance. The bidirectional converter in such emergency power supply devices is a crucial component. This paper proposes, a topology for an improved DC-DC bidirectional converter that is characterized by a high voltage conversion ratio and low voltage stress of switches. To confirm the performance of the converter, a computer simulation was executed with PSIM software. The conversion ratio of the proposed converter was found to be four times higher than the conventional boost converter in step-up mode and one-fourth that of the conventional buck converter in step-down mode, and the voltage stress of the switches was one-fourth of the high-side voltage. Moreover, the proposed converter was confirmed to be able to distribute equal currents between two interleaved modules without using any extra current-sharing control method because of the charge balance of its blocking capacitors.

Hybrid Energy Storage System with Emergency Power Function of Standardization Technology (비상전원 기능을 갖는 하이브리드 에너지저장시스템 표준화 기술)

  • Hong, Kyungjin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.2
    • /
    • pp.187-192
    • /
    • 2019
  • Hybrid power storage system with emergency power function for demand management and power outage minimizes the investment cost in the building of buildings and factories requiring emergency power generation facilities, We propose a new business model by developing technology that can secure economical efficiency by reducing power cost at all times. Normally, system power is supplied to load through STS (Static Transfer Switch), and PCS is connected to system in parallel to perform demand management. In order to efficiently operate the electric power through demand forecasting, the EMS issues a charge / discharge command to the ESS as a PMS (Power Management System), and the PMS transmits the command to the PCS controller to operate the system. During the power outage, the STS is rapidly disengaged from the system, and the PCS becomes an independent power supply and can supply constant voltage / constant frequency power to the load side. Therefore, it is possible to secure reliability through verification of actual system linkage and independent operation performance of hybrid ESS, By enabling low-carbon green growth technology to operate in conjunction with an efficient grid, it is possible to improve irregular power quality and contribute to peak load by generating renewable energy through ESS linkage. In addition, the ESS is replacing the frequency follow-up reserve, which is currently under the charge of coal-fired power generation, and thus it is anticipated that the operation cost of the LNG generator with high fuel cost can be reduced.

Application and Evaluation of Emergency Rates in Overhead Transmission Lines (가공송전선로의 비상용량 응용과 평가)

  • Kim, Sung Duck
    • Journal of IKEEE
    • /
    • v.18 no.4
    • /
    • pp.442-446
    • /
    • 2014
  • A method for applying emergency ratings to improve the reliability of power supply in ACSR overhead transmission lines is described in this paper. Due to re-regulate power industry, most power companies worldwide as well KEPCO have been searching for only economical strategies without new investment. Power demand was rapidly increasing, however, generation amount did not follow sufficiently. Hence in order to increase the transmission capacity for the existing transmission lines in case of peak load, or contingency in transmission lines, an application method of emergency ratings such as short or long term rating is proposed. If applying long term emergency rating instead of static line rating for the period of a peak load, power transmission can be increased to 10 % or more. Furthermore, it was shown that emergency rating can be effectively used in the contingency of double-circuit transmission lines and/or overload cases.

A Study on Site Survey of Emergency Generator for Resources (비상용 발전기 자원화 확대를 위한 현장실태조사에 관한 연구)

  • Cho, Sung-Koo;Han, Woon-Ki;Jung, Jin-Soo;Song, Young-Sang;Lim, Hyun-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1565-1566
    • /
    • 2015
  • As a result of increasing power demand and concern about power supply shortage in the world, various energy sources without depletion of fossil fuel are installed to electrical network. Above all, nuclear energy can be considered as the most economical energy source to generate electricity. But recently, due to problem of safety which has emerged as a key social issue, additional construction of nuclear power plants is difficult. In order to replace nuclear power, researches on the emergency generator have been actively conducting. This study conducted a survey of public institutions about specification of backup generator system and current states to secure available capacity.

  • PDF

Investigation of Excitation System for Nuclear Emergency Diesel Generator (원전 비상디젤발전기 여자시스템 고찰)

  • Shin, Man-Su;Lee, Joo-Hyun;Lim, Ick-Hun;Jeong, Tae-Won
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1894-1895
    • /
    • 2007
  • It is excitation system for nuclear emergency generator that is to startup automatically and sequentially supply essential loads with power. There are static type and alternating exciter, etc in its excitation system. An object of study is static excitation system which power is taken from power potential transformer and power current transformer. It is to complement curtailment of excitation system ability at happening short accidents. And Startup mode are quick startup and slow startup, etc. Its characteristic is looked into in this paper.

  • PDF

The Development of Portable Digital X-ray Power Supply Unit for Emergency Medical Services (응급의료에서 이용될 휴대용 디지털 X-ray 전원장치 개발)

  • Cho, Dong-Heon;Koo, Kyung-Wan;Yong, Hae-Sool
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.1
    • /
    • pp.125-131
    • /
    • 2006
  • The existing X-ray generators are either ones which are settled at fixed places or ones which are movable to sick rum. Movable generators can be very useful according to the circumstances of patients, but there remains a restraint that AC220[V] in the hospitals must be provided. When examining a first-aid patient who stays distant from the hospital or when grouping patients caused by disaster, the services of doctors at emergency centers should be very restrictive. Hence, this study developed a portable digital X-ray power supply unit that are utilizable at the accident spot or in a moving ambulance. By using the nit, the information of patients can be transmitted to the emergency center on the spot and thereby doctors can make a correct diagnosis. The properties of the unit are as follows: First, portable batteries(DCl2[V]) are utilized as electric source for the wit. Second PIC16F84A is utilized as control circuit in order to guarantee considerable reliance and to provide various functions. This portable digital X-ray power supply unit is expected to contribute to the emergency medical service system to be more advanced.

Development of Arm Insulator for Self-Build Based Emergency Tower (긴급복구용 자주조립식 철주 절연암 개발)

  • Min, Byeong-Wook;Wi, Hwa-Bog;Park, Jae-Ung;Lee, Cheol-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.107-108
    • /
    • 2007
  • Overhead transmission lines are completely exposed to the environment. This causes faults in transmission lines due to natural environmental conditions. In some cases, transmission towers are damaged by typhoons and snow, as well as sleet on the transmission lines. It takes a lot of time to repair the damaged towers. For emergency restoration purposes, steel poles are installed to temporarily supply power. Before 2003, emergency restoration steel poles were made of angled steel, which required a large number of beams, bolts, etc. In addition, the foundation of the steel pole and ground wire was constructed using excavation and burial methods, therefore it required a lot of manpower and time to construct temporary transmission lines. In September 2003, typhoon Maemi, whose maximum wind speed was 60m/s, hit Korea. 'Maemi' destroyed transmission lines in the Busan and Geojea area, causing long blackouts. To reduce the recovery time to the damaged transmission lines, self-build based emergency towers were developed. self-build based emergency towers reduced recovery time from 24 hours to 4 hours or less. However, the self-build based emergency tower had no arms, so the temporary transmission lines could only be constructed without curves in line routes. In this paper, solving these self-build based emergency tower limitations, using insulated arms(designed for use with the self-build based emergency tower), shall be explained.

  • PDF

A Case Study on Noise Impact Assessments and Countermeasures for Emergency Generators of the Data Center Building (건축물 내외부에 설치된 비상용 발전기 소음영향 평가 및 대책방안 사례연구)

  • Yun, Dae-Jin;Choi, Jae-Sung;Kim, Chang-Yeol;Kim, Han-Jun
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.10
    • /
    • pp.932-939
    • /
    • 2012
  • Recently, data centers are being established because IT and telecommunication industries are growing. The data centers have to install emergency generators to prevent unexpected shutdown of the electrical power supply. When the data centers are located in the densely populated urban area, the operating noise of the emergency generators can be a cause of people's complaints. In this case, it is necessary to establish effective countermeasure by noise & vibration specialists. To achieve this, noise reduction measure using noise measurement data and 3D noise analysis method have been employed in this study.

A Study on the Transformer Spare Capacity in the Existing Apartments for the Future Growth of Electric Vehicles (전기자동차 보급에 따른 기존 아파트의 변압기용량 한계시점에 대한 연구)

  • Choi, Jihun;Kim, Sung-Yul;Lee, Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.1949-1957
    • /
    • 2016
  • Rapid Expansion of EVs(Electric Vehicles) is inevitable trends, to comply with eco-friendly energy paradigm according to Paris Agreement and to solve the environment problems such as global warming. In this paper, we analyze the limit point of transformer acceptable capacity as the increase of power demand considering EVs supply in the near future. Through the analysis of transformer utilization, we suggest methods to analyze the spare capacity of transformer for the case of optimal efficiency operation and emergency operation respectively. We have the results of 18.4~29% spare capacity for the charging infrastructure to the rated capacity of transformer by analyzing the existing sample apartments. It is analyzed that the acceptable number of EVs is 0.09~0.14 for optimal efficiency operation and 0.06~0.13 for emergency operation. Therefore, it is analyzed the power demand of EV will exceed the existing transformer spare capacity in 7~8 years as the annual growth rate of EVs is prospected 112.5% considering current annual growth rate of EVs and the government EV supply policy.