• Title/Summary/Keyword: Emergency Power System

Search Result 438, Processing Time 0.023 seconds

Research on Line Overload Emergency Control Strategy Based on the Source-Load Synergy Coefficient

  • Ma, Jing;Kang, Wenbo;Thorp, James S.
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1079-1088
    • /
    • 2018
  • A line overload emergency control strategy based on the source-load synergy coefficient is proposed in this paper. First, the definition of the source-load synergy coefficient is introduced. When line overload is detected, the source-load branch synergy coefficient and source-load distribution synergy coefficient are calculated according to the real-time operation mode of the system. Second, the generator tripping and load shedding control node set is determined according to the source-load branch synergy coefficient. And then, according to the line overload condition, the control quantity of each control node is determined using the Double Fitness Particle Swarm Optimization (DFPSO), with minimum system economic loss as the objective function. Thus load shedding for the overloaded line could be realized. On this basis, in order to guarantee continuous and reliable power supply, on the condition that no new line overload is caused, some of the untripped generators are selected according to the source-load distribution synergy coefficient to increase power output. Thus power supply could be restored to some of the shedded loads, and the economic loss caused by emergency control could be minimized. Simulation tests on the IEEE 10-machine 39-bus system verify the effectiveness and feasibility of the proposed strategy.

Multi Remote Control of Ship's Emergency Lighting Power Supply (선박 비상조명 전원장치의 다중 원격제어)

  • Lee Sung-Geun;Lim Hyun-Jung
    • Journal of Navigation and Port Research
    • /
    • v.29 no.10 s.106
    • /
    • pp.859-863
    • /
    • 2005
  • This paper describes the improvement of power control characteristics of ship's emergency lighting power supply(SELPS), by which electric power is controlled extensively, and power ON-OFF is controlled and system parameter monitored in remote distance by PC serial communication. Proposed system is composed of step-down converter(SDC), emergency power supply circuit(EPSC), half bridge(HB) inverter, fluorescent lamp(FL) starting circuit, microprocessor control and multi communication circuit. Experimental works confirm that relative system stops when over current is detected and speedy and stable emergency power is supplied when main power source cut-off, and controls input power up to 35[$\%$] by adjusting pulse frequency of the HB inverter, and ON-OFF control of multiple SELS, real time transmission and monitor of parameters as to voltage, current, and power values are performed appropriately by PC communication.

Development of Hybrid Power Storage System for Urban Railway with UPS Function for Emergency Power Generation (비상발전용 UPS 기능을 갖춘 도시철도용 복합형 전력저장시스템 개발)

  • Hong, Kyungjin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.6
    • /
    • pp.191-196
    • /
    • 2019
  • In the case of urban railway facilities, the power supply should be maintained for the safe movement of passengers in communication facilities, disaster prevention facilities and boarding area security because of the confusion when power supply is cut off due to the nature of public transportation. In addition, considering that the number of trains is running on the urban railway line, it is necessary to operate at least 30 minutes for the bus stop and at least 1 hour for the communication and disaster prevention facilities. Therefore, it is essential to supply emergency power source to maintain stable operation of induction lamp and smoke exhaust system because main power is cut off in order to prevent further spread due to fire in case of the history of urban railway section or vehicle fires. Recently, UPS(Uninterruptible Power Supply) function to prevent power outage in emergency, emergency power generation combined with ESS function which saves electricity at nighttime price time, A hybrid power storage system with a UPS function.

Dynamic Analysis of Diesel Generators on Starting Large Induction Motors (대용량유도전동기 기동시의 비상용 디젤발전기 동특성 해석)

  • Han, Poong;Cho, Sung-Don
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.139-142
    • /
    • 1987
  • It is important to evaluate the voltage characteristics of diesel generator as an emergency power supply in nuclear power plant. On loss of offsite power sources, emergency safeguard loads required to safely shutdown the reactor should be supplied by diesel generator. This paper presents the dynamic stability program to evaluate diesel generator performance as an emergency power system. The results Indicate the diesel generator ability to start the motors successfully seems to life in its impedances and inertias.

  • PDF

A Study on the Development of EDG Engine Condition Diagnosis Program in Power Plant (발전용 비상디젤발전기 엔진 상태진단 프로그램 개발 연구)

  • Lee, Sang-Guk;Kim, Dae-Woong
    • Journal of Power System Engineering
    • /
    • v.19 no.5
    • /
    • pp.67-72
    • /
    • 2015
  • The reliable operation of onsite emergency diesel generator(EDG) should be ensured by a conditioning monitoring system designed to maintain, monitor and forecast the reliability level of diesel generator. The purpose of this paper is to develop condition diagnosis algorithm(logic) and analysis program of engine for the accurate diagnosis in actual condition of emergency diesel generator engine. As a result of this study, we confirmed that developed engine condition diagnosis algorithm and analysis program could be efficiently applied for actual EDG engine in nuclear power plant.

A PCS Control Strategy for Hybrid ESS with Function of Emergency Power Supply (비상전원 기능을 갖는 하이브리드 ESS를 위한 PCS 제어전략)

  • Kim, Sang-Jin;Kwon, Min-Ho;Choi, Se-Wan;Paik, Seok-Min;Kim, Mi-Sung
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.21 no.4
    • /
    • pp.302-311
    • /
    • 2016
  • This paper proposes a hybrid ESS that integrates an energy storage system (ESS) with an uninterruptible power supply (UPS). The hybrid ESS has a demand management and emergency power supply function while increasing the battery utilization of the UPS, which has just been used in a power failure. In addition to the critical load, the proposed system augments the capacity of emergency generation using an additional load, which has voltage and frequency-dependent characteristics to the grid side. The control algorithm of the AC-DC converter and bidirectional DC-DC converter is proposed for demand management and emergency power supply. Furthermore, seamless and autonomous transfer methods to alleviate the transient during mode transfer are proposed. To validate the proposed control scheme, experimental results from a 5 kW prototype are provided.

A Study on the Implementation and Modeling of 20kW Scale ESS Load Test Device for Emergency Generator (소방용 비상발전기의 현장부하시험을 위한 20 kW급 ESS 부하시험장치 모델링과 구현에 관한 연구)

  • Choi, Seung-Kyou;Lee, Hu-Dong;Choi, Sung-Sik;Ferreira, Marito;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.541-550
    • /
    • 2019
  • An emergency generator is key equipment for fire-fighting to supply power to fire-fighting facilities, which protect property and people in cases of fire accidents. A rated load test for emergency generators must be carried out by connecting an emergency load to the generator in accordance with related regulations. However, a no-load test has been performed for emergency generators in general since serious problems can occur when the main power is cut off, including the damage of customer devices and shut down of critical loads. Therefore, this paper proposes a load test method for an emergency generator using energy storage system (ESS) without the interruption of main power. The emergency power system was also modeled based on PSCAD/EMTDC software, and a 200-kW scale ESS load test device was implemented. The simulation and test results show that the load test method is useful and practical for an emergency power supply system.

Development of Operation Scenarios by HILS for the Energy Storage System Operated with Renewable Energy Source (HILS를 이용한 신재생 에너지원이 포함된 에너지 저장시스템의 운영 시나리오 개발)

  • Shin, Dong-Cheol;Jeon, Jee-Hwan;Park, Sung-Jin;Lee, Dong-Myung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.2
    • /
    • pp.224-232
    • /
    • 2018
  • According to government policy, renewable energy facility such as solar power generation is being implemented for newly constructed buildings. In recent years, the introduction of Energy Storage System (ESS) served as an emergency power for replacing an existing diesel generator has been increasing. Furthermore, in order to expand the efficacy of the ESS operation, operation in combination with renewable energy sources such as solar and wind power generation is increasing. Hence, development of the ESS operation algorithms for emergency mode as well as the peak power cut mode, which is the essential feature of ESS, are necessary. The operational scenarios of ESS need to consider load power requirement and the amount of the power generation by renewable energy sources. For the verification of the developed scenarios, tests under the actual situation are demanded, but there is a difficulty in simulating the emergency operation situation such as system failure in the actual site. Therefore, this paper proposes simulation models for the HILS(Hardware In the Loop Simulation) and operation modes developed through HILS for the ESS operated with renewable energy source under peak power reduction and emergency modes. The paper shows that the ESS operation scenarios developed through HILS work properly at the actual site, and it verifies the effectiveness of the control logic developed by the HILS.

Preventive and Emergency Control of Power System for Transient Stability Enhancement

  • Siddiqui, Shahbaz A.;Verma, Kusum;Niazi, K.R.;Fozdar, Manoj
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.83-91
    • /
    • 2015
  • This paper presents preventive and emergency control measures for on line transient stability (security) enhancement. For insecure operating state, generation rescheduling based on a real power generation shift factor (RPGSF) is proposed as a preventive control measure to bring the system back to secure operating state. For emergency operating state, two emergency control strategies namely generator shedding and load shedding have been developed. The proposed emergency control strategies are based on voltage magnitudes and rotor trajectories data available through Phasor Measurement Units (PMUs) installed in the systems. The effectiveness of the proposed approach has been investigated on IEEE-39 bus test system under different contingency and fault conditions and application results are presented.

A study on the improvement of Auxiliary Power Unit auto-shutdown of T-50 series aircraft based on analysis of ECU response characteristics (ECU 응답특성 분석을 통한 T-50 계열 항공기 보조동력장치 자동 꺼짐 개선에 관한 연구)

  • Park, Sung-Jae;Yoo, In-Je;Choi, Su-Jin;Lee, Dong-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.640-646
    • /
    • 2017
  • A GEN TEST of the auxiliary power unit of a T-50 series aircraft is performed as part of the operational test of its emergency power system on the ground before flight. At this time, the auxiliary power unit should be automatically turned off via the response signal of the ECU when power is not normally supplied to the emergency power system. If the correct operation of the emergency power system cannot be confirmed on the ground, it is not possible to proceed with the flight. This kind of defect is a major factor causing the operation rate of the aircraft to be decreased. The defect code identified by the ECU was confirmed as a defect in the inverter. However, the same defect was found after replacing the inverter. This report presents an improved method of identifying the cause of the defect by analyzing the response characteristics of the ECU and emergency power system and allows the ECU to be recognized as the cause of the defect if the inverter does not generate a voltage within a certain time. Also, the application of the improved method confirmed that it can satisfy the output request time of the emergency power system and effectively prevent the auto-shutdown of the auxiliary power unit.