• 제목/요약/키워드: Emergency Power Generator

검색결과 124건 처리시간 0.034초

DSP-Based Direct Source Current Control for Three-Phase Four-Wire Power Coditioner

  • Jeong, C.Y.;Cho, J.G.;Baek, J.W.;Yoo, D.W.;Song, E.H.
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1998년도 Proceedings ICPE 98 1998 International Conference on Power Electronics
    • /
    • pp.871-875
    • /
    • 1998
  • A DSP-based source current control for power conditioner is presented to compensate current harmonics and asymmetries of three-phase four-wire emergency generators caused by nonlinear and/or unbalanced loads. There-phase voltage type converter with split-dc-capacitor is adopted as the power circuit and a new direct source current control method is suggested, which simplifies the controller. The proposed control method shapes the generator current sinusoidally inphase with the voltage and allows the generator to supply maximum power even to single phase loads. An IGBT base lookVA prototype with the controller realized with a DSP (TMS320C32) is built and tested to verify the performance of the power conditioner.

  • PDF

LOSS OF OFFSITE POWER TEST EXPERIENCE FOR YGN 4

  • Chi, Sung-Goo;Sung, Kang-Sik;Kim, Se-Chang;Kim, Eul-Ki;Eom, Young-Meen;Park, Young-Boo
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1995년도 추계학술발표회논문집(1)
    • /
    • pp.230-234
    • /
    • 1995
  • The loss of offsite power test was successfully performed on YGN 4 to demonstrate that the reactor can be shutdown and the RCS can be maintained in a hot standby condition following a loss of all offsite Alternating Current (AC) power. Following the loss of main generator and all offsite AC power, the ensile emergency diesel generators were automatically started and the plant was stabilized via natural circulation. Plant conditions were maintained in hot standby for at least 30 minutes before offsite power was restored. Thus, the capability of equipment, controls and instrumentation necessary to remove decay heat from the core using only ensile emergency power was demonstrated, thereby satisfying all objectives and acceptance criteria of the test.

  • PDF

Operational Availability Improvement through Online Monitoring and Advice For Emergency Diesel Generator

  • Lee, Jong-Beom;Kim, han-Gon;Kim, Byong-Sub;M. Golay;C.W. Kang;Y. Sui
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1998년도 춘계학술발표회논문집(1)
    • /
    • pp.264-270
    • /
    • 1998
  • This research broadens the prime concern of nuclear power plant operations from safe performance to both economic and safe performance. First emergency diesel generator is identified as one of main contributors for the lost plant availability through the review of plants forced outage records. The framework of an integrated architecture for performing modern on-line condition for operational availability improvement is configured in this work. For the development of the comprehensive sensor networks for complex target systems, an integrated methodology incorporating a structural hierarchy, a functional hierarchy, and a fault-system matrix is formulated. The second part of our research is development of intelligent diagnosis and maintenance advisory system, which employs Bayesian Belief networks (BBNs) as a high level reasoning tool incorporating inherent uncertainty use in probabilistic inference. Our prototype diagnosis algorithms are represented explicitly through topological symbols and links between them in a causal direction. As new evidence from sensor network development is entered into the model especially, our advisory of system provides operational advice concerning both availability and safety, so that the operator is able to determine the likely modes, diagnose the system state, locate root causes, and take the most advantageous action. Thereby, this advice improves operational availability

  • PDF

광범위 입력전압을 갖는 준공진형 플라이백 파워서플라이의 연구 (A Study of Quasi-Resonant Flyback Power Supply with Very Wide Input Voltage)

  • 이용근;나재두
    • 전기학회논문지P
    • /
    • 제64권3호
    • /
    • pp.143-145
    • /
    • 2015
  • One of the many problems besetting the converter designer is being able to design a switching power supply that can operate in the range of very wide input voltage. Specially, in an emergency diesel generator system, the AVR(Automatic Voltage Regulator) is a regulator which regulates the output voltage of the generator at a nominal constant voltage level. In addition, the AVR must be operated in very wide input voltage. Therefore, a power supply for the AVR must be operated at the very wide input voltage range. In this paper, a quasi-resonant flyback power supply with very wide input voltage range is proposed. Also, the performance of the proposed power supply is demonstrated through experiments.

상정사고를 고려한 무효전력/전압제어 전문가 시스템 (A Knowledge Based System for Reactive Power/Voltage Control Including Contingency)

  • 박영문;김두현
    • 대한전기학회논문지
    • /
    • 제39권8호
    • /
    • pp.779-791
    • /
    • 1990
  • This paper presents a knowledge based system to solve reactive power/voltage control problem in a power system. A need is recognized for new methods to alleviate a bus voltage limit violation more quickly when a power system becomes an emergency state due to contingency. To cope with this object, a set of indices concept which is used to make bus order list of reactive power injection priority is introduced. A set of indices, based on the overall system conditions, consists of steady state stability index, reactive power transmittance indes, voltage severity index and generator fuel cost index. This scheme and empirical rules of the knowledge on the basis of the human expert result in fast decision-making of the reactive power compensation devices since only the amount of devices is determined by the inference in the knowledge based system when the voltage violation is detected. In this approach, control devices such as shunt capacitor (reactor), transformer tap settings and generator voltages are utilized. Also the developed system herein can be used to minimize control action taken or generator fuel cost according to the user's option on the weighting factor. The results of a case study are also presented.

  • PDF

Characteristics on Stand-alone Operation of a Doubly-fed Induction Generator Applied to Adjustable Speed Gas Engine Cogeneration System

  • Daido, Tetsuji;Miura, Yushi;Ise, Toshifumi;Sato, Yuki
    • Journal of Power Electronics
    • /
    • 제13권5호
    • /
    • pp.841-853
    • /
    • 2013
  • An application of doubly-fed induction generator (DFIG), which is one of adjustable speed generators, to a gas engine cogeneration system has been investigated. To operate during a blackout as an emergency power supply is one of important roles for the gas engine cogeneration system. However, the DFIG requires initial excitation for startup during a blackout because the DFIG has no excitation source. In this paper, we propose the "blackout start" as a new excitation method to generate a rated voltage at the primary side during a blackout. In addition, a stand-alone operation following a blackout has been investigated by using experimental setup with a real gas engine. Power flows in the generating set with the DFIG at the stand-alone operation have been investigated experimentally. Experimental investigation of the power flow suggests that the generating set with DFIG has optimal speed in minimizing whole system losses.

보조동력장치 회전자 유동 및 출력특성에 관한 연구 (A Study on the Flow and Power Characteristics of Rotor in the APU)

  • 이중섭;정인국;윤지훈;서정세;이태의
    • 한국생산제조학회지
    • /
    • 제20권6호
    • /
    • pp.805-810
    • /
    • 2011
  • Recently, Use of Auxiliary power unit(APU) is increasing by growing demand for improvement of insufficient electric power and installation of emergency generation devices in military tracked vehicles and civil markets. And the trend is that the units are demanded for smaller size, lighter weight and higher output power, etc to suit consumer demands. To achieve these, it is essential to develop high performance system. Therefore, in this study, it was conducted in numerical analysis to investigate flow characteristics of rotor in APU generator. Also output performance of APU applied on the rotor is analyzed by experimental method. As the result, higher rotating speed of rotor caused high air flow rate at suction and it leads to linear increase of discharging flow rate. The maximum theoretical power was achieved at 12 $m^3$/min of flow rate and, at that time, output power of generator was about 7.825 kW. Also, it can be confirmed the stabilization of output performance is achieved in about 2 seconds by experiment.

원자력발전소 비상전력계통 강화 방안에 따른 리스크 영향 평가 (A Risk Impact Assessment According to the Reliability Improvement of the Emergency Power Supply System of a Nuclear Power Plant)

  • 전호준
    • 한국안전학회지
    • /
    • 제27권5호
    • /
    • pp.224-228
    • /
    • 2012
  • According to the results of Probabilistic Safety Assessment(PSA) for a Nuclear Power Plant(NPP), an Emergency Power Supply(EPS) system has been considered as one of the most important safety system. Especially, the interests in the reliability of the EPS system have been increased after the severe accidents of Fukushima Daiichi. Firstly, we performed the risk assessment and the importance analysis of the EPS system based on the PSA models of the reference plant, which is the Korean standard NPP type. Considering a portable Diesel Generator(DG) system as the reliability reinforcement of the EPS system, we modified the PSA models and performed the risk impact assessment and the importance analysis. Although the reliability of the potable DG could be about 20% of the reliability of the alternative AC DG, we identified that Core Damage Frequency(CDF) was decreased by at least 4.6%. In addition, the risk impacts due to the unavailability of the EPS system on CDF were decreased.

중수로형 원자력 발전소 비상디젤발전기 주기적 안전성 평가 (Periodic Safety Review of EDG for CANDU Type Nuclear Power Plant)

  • 하체웅;한성흠;임우상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.666_667
    • /
    • 2009
  • 원자력발전소의 비상전력계통은 소외정전 시 발전소 안전정지에 필요한 안전관리 설비에 비상전력을 공급하는 계통으로 비상전력계통 모선에 비상디젤발전기(Emergency Diesel Generator : EDG)가 설치되어 있다. 본 논문에서는 국내 중수로형 원자력 발전소에 대해서 최초로 주기적 안전성 평가(Periodic Safety Review : PSR)을 수행한 결과를 기술하였다.

  • PDF