• Title/Summary/Keyword: Electricity Load

Search Result 515, Processing Time 0.031 seconds

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro-Power Plants (터널식 소수력 발전소의 최적 설계유량에 관한 연구)

  • 이철형;박완순
    • Water for future
    • /
    • v.24 no.1
    • /
    • pp.63-71
    • /
    • 1991
  • This study represents the methodology for feasibility analysis of small hydro power plants. Cumulative density function of Weibull distribution and Thi-essen method were adopted to beside flow duration curve at candidate sites. The performance prediction model and construction cost estimation model for tunnel-type small hydro power plants were developed. Eight candidate sites existing on Han river selected and surveyed for actual sites reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrates with the lowest unit generation cost for tunnel-type small hydro power plants were the flowrate concerning with between 20 % and 30 % of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual average load factor, annual electricity production were estimated and discussed for surveyed sites.

  • PDF

Optimal Operation Control for Energy Saving in Water Reuse Pumping System (에너지절감을 위한 물 재이용 펌프시스템의 최적운전 제어)

  • Boo, Chang-Jin;Kim, Ho-Chan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.5
    • /
    • pp.2414-2419
    • /
    • 2012
  • This paper presents an optimal operation control method for energy saving in the water reuse pumping system. A predictive horizon switching strategy is proposed to implement an optimal operation control and a linear programming (LP) algorithm is used to solve optimal problems in each time step. Energy costs are calculated for electricity on both TOU in the light, heavy, and maximum load time period and peak charges. The optimal operation in water reuse pumping systems is determined to reduce the TOU and peak costs. The simulation results show a power energy saving for water reuse pumping systems and power stability improvement.

Determination of Optimal sizes of Battery Energy Storage System Considering Rate-Of-Return for Customers-side (수익률을 고려한 수용가측 전자전력저장시스템의 최적용량 선정)

  • Hong, Jong-Seok;Kim, Jae-Chul;Choi, Joon-Ho;Son, Hak-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.146-148
    • /
    • 2001
  • This paper discusses the optimal sizes of BESS. The goal must be optimized electricity charge of the customers-side with choosing the time-of-use rates. Therefore the cost is minimized by BESS installed the customers-side. Feasible ROR that means the ratio of capital costs to economic effect owned the optimal BESS sizes is determined the suitable domestic condition based on the battery cost and power converter system cost. Payback period times can be presented by BESS through the ROR. Multi-Pass Dynamic Programming(MPDP) algorithm is applied to the customer for the optimal sizes determination in this paper. It is to solve the optimal solution under the constraints. To investigate the efficiencies of the constraints, it is applied the typical load curve to the high-voltage customer owned Time-Of-Use(TOU) whether BESS is installed or not. Well, The result is obtained that feasible BESS sizes can be achieved the suitable customers-side of meter through the ROR.

  • PDF

Optimal Operation of Battery Energy Storage System for Customers using the MPDP (MPDP를 이용한 수용가측 전지전력저장시스템의 최적운전)

  • Hong, Jong-Seok;Kim, Jae-Chul;Choi, Joon-Ho;Jung, Yong-Chul;Kim, Tae-Su;Kim, Eung-Sang
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.315-317
    • /
    • 2001
  • This paper studies for the optimal operation of BESS. The goal must be optimized electricity charge of the customer sides owned time-of-use rates in this paper. Therefore, the least of cost is caused by BESS installation, Multi-Pass Dynamic Programming (MPDP) algorithm is applied to the customer for the optimal operation determination in this paper. It is to solve the optimal solution under the constraints. No matter how become one stage in general, problem is divided into several stage in series in this algorithm. Regardless of the decision step, MPDP is only accomplished based on the state of stage in the present. To investigate the efficiencies of the algorithm, it is applied the typical load curve to the cutomer owned Time-Of-Use(TOU). Result shows that the maximun economic benefits of the battery energy storage system can be achieved by the purposed algorithm.

  • PDF

Optimal Cooling Operation of a Single Family House Model Equipped with Renewable Energy Facility by Linear Programming (신재생에너지 단독주택 모델 냉방운전의 선형계획법 기반 운전 최적화 연구)

  • Shin, Younggy;Kim, Eui-Jong;Lee, Kyoung-ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.638-644
    • /
    • 2017
  • Optimal cooling operation algorithm was developed based on a simulation case of a single family house model equipped with renewable energy facility. EnergyPlus simulation results were used as virtual test data. The model contained three energy storage elements: thermal heat capacity of the living room, chilled water storage tank, and battery. Their charging and discharging schedules were optimized so that daily electricity bill became minimal. As an optimization tool, linear programming was considered because it was possible to obtain results in real time. For its adoption, EnergyPlus-based house model had to be linearly approximated. Results of this study revealed that dynamic cooling load of the living room could be approximated by a linear RC model. Scheduling based on the linear programming was then compared to that by a nonlinear optimization algorithm which was made using GenOpt developed by a national lab in USA. They showed quite similar performances. Therefore, linear programming can be a practical solution to optimal operation scheduling if linear dynamic models are tuned to simulate their real equivalents with reasonable accuracy.

Research into The Future Development of the Hybrid System for Buoy

  • Lee, Ji-Young;Kim, Jong-Do;Lee, Jong-Ho;Lee, Jin-Yeol;Oh, Jin-Seok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.31 no.5
    • /
    • pp.583-591
    • /
    • 2007
  • This paper reports the performance of a 150W PV-wave hybrid system with battery storage in buoy. This system was originally designed to meet a new hybrid ower system for buoy in Korea. In the case or lighted buoys and lighthouses, a light failure alarm system of wireless radio is attached so that light failures are immediately notified to the office. At lighthouse offshore fixed lights and light buoys where commercial electricity is not available, the power source depends on solar system and batteries. This power system has a various problems. Therefore energy derived from the sunshine, wind and waves has been used as the energy source lot aids to navigation. Recently a hybrid system of combining the solar, wind and the wave generator is a favorable system lot the ocean facilities like lighthouse and buoy. The hybrid system in this paper is intended for variable DC load like light, communication system in the buoy and includes a PV-wane generation system and battery. This is composed a high efficiency charging algorithm, switching converter and controller. This paper includes discussion on system reliability, power quality, and effects of hybrid system in the buoy. Simulation and experimental results show excellent performance.

A Study on the Energy Performance Evaluation of Zero Energy House in Zero Energy Town (제로에너지타운 내 주택 에너지 성능 평가에 관한 연구)

  • Lee, Wang-Je;Baek, Nam-Choon;Lee, Kyoung-Ho;Heo, Jae-Hyeok
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.2
    • /
    • pp.85-91
    • /
    • 2015
  • In this study, energy performance analysis of houses in zero energy demonstration town(ZeT) was carried out using the monitoring results. This ZeT was composed 29 zero energy individual houses(ZeH) which were applied passive as well as active technologies. The results are as follows. (1) Residents are generally considered to have been lacking basic mind to save energy, (2) In particular, average yearly total energy consumption per house is 12,834 kWh and specific heating energy is $53.2kWh/m^2{\cdot}yr$ which is higher than that of passive house. This is because of one of the reason just pointed out in subsection (1). (3) Most part of the residual energy load are supplied with only renewable energy, but not operating energy for geothermal heat pump which is use of cheap electricity.

A study on the Architectural Condition and Cases of BIPV-module for Roof (지붕일체형 PV모듈의 건축특성 및 적용사례 분석연구)

  • Lee, Eung-Jik
    • KIEAE Journal
    • /
    • v.6 no.3
    • /
    • pp.49-56
    • /
    • 2006
  • The roof among the outer surfaces of buildings is an optimum place to install PV since it is the best favorable part in the building to be exposed to day light. Especially, in case of module of BIPV for Roof, it should have essentially the functions of both electricity generation and roof-finish as a construction material. The followings are the results of the study which has analyzed the architectural conditions and applications thereof at the job site. -The aesthetic function of BIPV module is very important because the roof, mostly located at the top of the buildings, is easily recognized and affects outer interior design of the building a lot. -The heat proof of BIPV for Roof could affect the energy consumption through the roof having a wide area. -For architectural condition to the weather, the roof has to ensure the stability of the weather, humidity proof, and airtightness to the wind respectively. -For architectural condition of the structure, endurance by physical power such as stability of both combining and fixing and transfer of load should be ensured. -For residents protection, it has also architectural functions to secure for the space and shield ozone, UV and noxious substances. -Through its practical applications, It is already confirmed that there are various types of BIPV modules overseas and its application has been proved successfully.

A Study on the Evaluation of the Long-Term Avoided Generation Cost (장기 회피 발전비용 계산에 관한 연구)

  • Kim, Jong-Ok;Park, Jong-Bae;Kim, Kwang-In;Lee, Sang-Chul
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.878-882
    • /
    • 1996
  • This paper discusses the definition and concepts, approach methodologies, capable application areas in electricity business, and tentative calculation of avoided generation costs based on the Korea's official long-term generation expansion plan. The objective to evaluate avoided costs of a resource is to supply decision makers with the breakeven cost of a targeting avoided resource. For the evaluation of avoided costs of the Korea's generation system, we consider the pseudo-DSM option which has 1,000MW peak savings, load factor with 70 percent, and life-time With 25 years as the avoided resource. The DSM resource can save the fuel and capacity additions of a electric utility during its life time. The capacity and fuel savings are evaluated from the two different cashflows with and Without the DSM option, which are generated on the basis of the generation system optimization model(WASP-II), independently. The breakeven kWh costs of the DSM option over this 25-year period is projected to be 34.1[won/kWh], which is composed of generation-capacity and fuel avoided costs with 101.139[won/kW] and 17.6[won/kWh], respectively.

  • PDF

Transmission System Expansion Planning by Nodal Delivery Marginal Rate Criterion -II (모선수송전달능력(母線輸送傳達能力) 신뢰도 기준에 의한 송전계통(送電系統)의 광역설계(擴充計劃) -II)

  • Park, Jeong-Je;Shi, Bo;Jeong, Sang-Hun;Choi, Jae-Seok;Mount, Timothy;Thomas, Robert
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.574-575
    • /
    • 2007
  • This paper proposes a method for choosing the best transmission system expansion plan using nodal/bus delivery marginal rate criterion ($BMR_k$) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the $BMR_k$ which means a nodal deterministic reliability level requirement at specified load point. The proposed method models the transmission system expansion problem as an integer programming problem. It solves for the optimal strategy using a branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the transmission system expansion planning problem in competitive electricity market environment.