KIEE International Transactions on Power Engineering
/
제2A권4호
/
pp.166-173
/
2002
Dispersed Generation (DG) units significantly effect the existing distribution protection practices. Therefore, new protection practices of the distribution system interconnected with DG units should be reevaluated and developed. In this paper, a new inter-tie protection scheme of DG units for distribution automatic reclosing is proposed. The impact of DG units on existing radial-sectionaliser coordination is analyzed. And the effects of the distribution reclosing type (radial and passive reclosing) on DG dynamics are analyzed and classified. From the results of the DG dynamic responses by the reclosing type, i.e. radial and passive reclosing, the inter-tie protection schemes of DG are introduced to improve the reliability and availability of utility interactive DG. The proposed schemes are proved and evaluated by a case study using PSCAD/EMTDC simulation.
In this paper, we investigated the quenching characteristics of a superconducting fault current limiter (SFCL) with connection of $2{\times}3$ matrixes. This SFCL consists of the trigger part to apply magnetic field and the current-limiting part to limit the fault current. When the fault occurs, the magnetic field generated in the reactor connected in parallel was applied to the two superconducting units of the current-limiting part to reduce of inhomogeneous critical current behavior between the superconducting units. The quenching behavior of a superconducting unit in the trigger part was affected by the increase of turn numbers. This is because of the difference of current distribution between the inductance of the reactors and the resistance generated in the superconducting units in trigger part. We confirmed that the voltage differences between two superconducting units of the current-limiting part were decreased. This is because of the improvement of inhomogeneous critical current behavior between the superconducting units according to the increase of external magnetic field.
This paper presents a new method for solving a long term unit commitment problem including hydro and pumped storage hydro units in a large scale power system. The proposed method makes it possible to get variable power of hydro and pumpde storage hydro units and results in the better unit commitment with good convergency. Moreover this paper proposes an unit commitment algorithm to consider variable power of these units effectively by Lagrangian Relaxation method. By applying the proposed method to the test system and the real system, it is verified the usefulness of this method.
Ye, Xi;Qiao, Ying;Lu, Zongxiang;Min, Yong;Wang, Ningbo
Journal of Electrical Engineering and Technology
/
제8권6호
/
pp.1596-1604
/
2013
Coordinating operation between large-scale wind power and thermal units in multiple time scale is an important problem to keep power balance, especially for the power grids mainly made up of large coal-fired units. The paper proposes a novel operation mode of multi-scale unit commitment (abbr. UC) that includes mid-term UC and day-ahead UC, which can take full advantage of insufficient flexibility and improve wind power accommodation. First, we introduce the concepts of multi-scale UC and then illustrate the benefits of introducing mid-term UC to the wind-coal intensive grid. The paper then formulates the mid-term UC model, proposes operation performance indices and validates the optimal operation mode by simulation cases. Compared with day-ahead UC only, the multi-scale UC mode could reduce the total generation cost and improve the wind power net benefit by decreasing the coal-fired units' on/off operation. The simulation results also show that the maximum total generation benefit should be pursued rather than the wind power utilization rate in wind-coal intensive system.
The study on power capacity increase of superconducting fault current limiter (SFCL) is one of the most important researches to apply a SFCL in the power system. To achieve this, we thought that the unbalanced quenching problem generated in series connection of superconducting units should be solved. In this paper, we investigated the quenching characteristics of superconducting units in the transformer-type SFCL with or without the neutral line between secondary windings and superconducting units. In case of transformer-type SFCL without neutral line, the connection structure of superconducting units is identical to that of the resistive-type SFCL connected in series. Therefore, the unbalanced quenching was occurred by difference of critical current between superconducting units. However, in case of transformer-type SFCL with neutral line, the superconducting units with different critical current were simultaneously quenched. It was because the currents induced by secondary winding were separately flowed through the superconducting units. By these results, we confirmed that the resistances and consumption powers of the superconducting units were equally generated.
In order to increase the capacity of the superconducting fault current limiter(SFCL), the current and voltage grades of the SFCL must be increased. As a method for the increase of the current and voltage grades of the SFCL, we compared the various characteristics between the flux-lock type SFCL "With three superconducting units connected in series and the transformer type SFCL using the transformer with three secondary circuits. One of three superconducting units had not quenched in the flux-lock type SFCL. Therefore, the unbalanced power burden happened because of the voltage difference generated by unbalanced quenching between the superconducting units. In the meantime, the three superconducting units were all quenched in the transformer type SFCL using the transformer, and the voltage difference generated between the superconducting units was decreased. Therefore, the difference of critical characteristics was complemented by distribution of fault current in accordance with the turn's ratio between primary and secondary windings. The unbalanced power burden of the superconducting units was reduced due to flux-share between the superconducting units in the transformer. In conclusion, the capacity increment of the SFCL using a transformer was easier due to equal distribution of voltages generated by simultaneous quench of the superconducting units. We think that the characteristics is improved more because of the decrease of saturation in the iron core if the secondary winding is increased in the SFCL using the transformer.
Transactions on Electrical and Electronic Materials
/
제18권2호
/
pp.111-118
/
2017
The increased diversity of different types of energy sources requires moving towards smart distribution networks. This paper proposes a probabilistic DG (distributed generation) units planning model to determine technology type, capacity and location of DG units while simultaneously allocating ESS (energy storage systems) based on pre-determined capacities. This problem is studied in a wind integrated power system considering loads, prices and wind power generation uncertainties. A suitable method for DG unit planning will reduce costs and improve reliability concerns. Objective function is a cost function that minimizes DG investment and operational cost, purchased energy costs from upstream networks, the defined cost to reliability index, energy losses and the investment and degradation costs of ESS. Electrical load is a time variable and the model simulates a typical radial network successfully. The proposed model was solved using the DICOPT solver under GAMS optimization software.
The effect of calcitonin gene-related peptide (CGRP), substance P (SP) and electrical stimulation of the tooth on the intradental nerve activtiy (INA) was investigated in anesthetized cats. The INA was recorded from single pulp nerve units dissected from the inferior alveolar nerve under stereomicroscope. The INA elicited by 3 minute application of 4M NaCl in deep dentinal cavity was compared before and after stimulation at 10 minute intervals. The magnitude of INA was calculated as the total number of nerve impulses produced in given period, and the changes of INA are expressed as % of control INA. The results obtained were as follows. 1. 16 single pulp nerve units were classified as 14 $A{\delta}$-fibers (3.4~19.4m/sec) and 2-fibers (1.5~1.7m/sec) according to the conduction velocity. 2. 4M NaCl evoked an irregular bursts of spikes which continued until washing out. Isotonic saline did not affect INA to subsequent applications of the hypertonic NaCl solution (P>0.05). 3. Local application of CGRP ($200{\mu}g$/ml) in deep dentinal cavity reduced the INA induced by 4M NaCl in $A{\delta}$-fiber units (P<0.01) and some units of those responded to CGRP during application. 4. Local application of SP ($100{\mu}g$/ml) in deep dentinal cavity reduced the INA induced by 4M NaCl in AS-fiber units (p<0.05), but increased the INA in C-fiber unit coincided with large reduction of the INA of $A{\delta}$-fiber units. 5. Monopolar electrical stimulation applied to the crown at intensities high enough to excite C-fibers (12V, 5ms, 10Hz, 10~30min) decreased the INA in $A{\delta}$-fiber units (P<0.01) and systemic pretreatment with phenoxybenzamine (3mg/kg, i.v.) enhanced this inhibitory effect (P<0.01). On the contrary, electrical stimulation increased the INA in C-fiber unit.
The increase of power capacity in the superconducting fault current limiter (SFCL) is essential for application into the power grid. To achieve this, when superconducting units were connected in series and parallel, the unbalanced quenching characteristics between superconducting units generated by different critical current behavior should be improved. In the transformer-type SFCL, the superconducting units connected in series could be simultaneously quenched by the connection of neutral lines between secondary coils and superconducting units. From this the consumed power in superconducting units was equally distributed. In addition, the more the turn ratio of the transformer was reduced, the more consumed power in the superconducting units was reduced by the decrease of the induction voltage generated in the superconducting units. From those results, the transformer-type SFCL using neutral lines could increase the power capacity of the SFCL by the equal power division into the superconducting units.
Novel mechanism of customized adequacy formulation is proposed in order to enhance micro grids system reliability. The mechanism accounts for 2-levles of load curtailment, and is mainly based on probabilistic load profile and hybrid Distributed Generation (DG) units modeling. The two load curtailments are needed in order to ensure adequate technical constraints at steady state condition during islanding mode of operation. The effectiveness of the proposed formulation has been verified using system independent analytical expressions for the evaluation of both reliability and Expected Energy Not Served (EENS) indices. The evaluation has examined the impact of different penetration levels of Hybrid DG Units in case study islands. Results show the enhancement of the overall distribution system reliability and the recommended conditions for successful islanding mode of operation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.