• Title/Summary/Keyword: Electrical Substation System

Search Result 504, Processing Time 0.027 seconds

IEC 61850 Application in Distribution Automation System (배전자동화 시스템에 IEC 61850 적용 방안)

  • Kim, Taw-Wan;Lim, Il-Hyung;Choi, Myeon-Song;Lee, Seung-Jae;Kwon, Sung-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.687-693
    • /
    • 2011
  • In this paper, problems and solutions are proposed for applying IEC 61850 to Distribution Automation System(DAS). Communication protocol integration in power automation system have issued by IEC standards, IEC 61850 of them has researched for applying IEC 61850 to many areas of power system in spite of that it was made for substation automation system. Especially, DAS is just about to apply IEC 61850 by communication network change from serial to ethernet although DNP 3.0 is used. But it's impossible to apply directly IEC 61850 to DAS by difference of environment which unfixed wide area and separated nodes in power distribution system unlike concept of IEC 61850 is made by Substation Automation System(SAS) environment of limited space. Thus, this paper proposed applications of three types which conceptual, practical, and future to consider problems and solutions when apply IEC 61850 to Ethernet based DAS.

A Study on the Field Test of IEC 61850 based Substation Automation System (IEC 61850 변전자동화시스템 실증시험에 관한 연구)

  • Lee, N.H.;Jang, B.T.;Kim, B.H.;Shim, E.B.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.250_251
    • /
    • 2009
  • IEC 61850 based substation automation system mainly consists of human machine interface as a client and a various of IEDs as a server. Both of them should require the field testing for performance verification including IEC 61850 communication services. This means that the test can assure the interoperability of IEC 61850 based substation automation system consisted of multi vendor's products. This paper shows a research result on the field test of the IEC 61850 based HMI and IEDs. And it proposes some engineering solutions for the system implementation.

  • PDF

Reliability analysis for substation based on the failure rate data the facilities (설비의 고장을 데이터를 이용한 변전소 신뢰도 분석 연구)

  • Lee, Y.H.;Baek, D.H.;Jang, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.29-31
    • /
    • 2006
  • The most crucial requirement of a power system is o supply quality electric energy to customers without interrution. This problem is directly related to reliability of power system. Reliability assessment of power system has been an important topic for the past several decades. This paper deals with reliability assessment of a 154kV power substation n KEPCO. In his paper, exponential distribution is used to calculate reliablity index. The failure rate data that are utilited for reliablity index based on the realistic system. Also, FTA(Fault Tree Analysis) is used to compute substation reliablity

  • PDF

A study of AC/DC combined emergency source for power system control (전력계통 제어를 위한 변전소 AC/DC 겸용 비상전원에 관한 연구)

  • Jun, Bum-Bae;Lee, Hyoung-Han;Kim, Chang-Gon;Ahn, Bo-Soon;Yun, Ki-Seob;Jung, Jong-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.135-138
    • /
    • 2005
  • This paper focuses on emergency source and control of substation against the consequence of power system breakdown or outage. the aim of the paper is to provide ideas and guidance concerning methods of using AC/DC combined emergency source for power system control to restore power system after unforseen events, such as outages caused by natural disaster. so the emergency source and lamp is very important for restoration control of substation after outage. therefore, this paper proposes countermeasure and method for security of substation emergency source and lamp which is restored at breakdown.

  • PDF

Derivation of Real-time Monitoring System for Power Supply System in Metro Substation (도시철도 변전소 전력설비 실시간 모니터링 방안 도출)

  • Jung, Ho-Sung;Park, Young;Oeu, Soo-Young
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.23 no.4
    • /
    • pp.333-337
    • /
    • 2010
  • This paper introduces an overall system design of a real-time monitoring system that monitors condition of urban railway AC/DC transformers, disconnecting switches, circuit breakers, regulators, and GIS (gas insulated switchgear). For effective diagnosis of urban railway facilities we developed optimized sensors and application technology. The proposed system is combined with wireless technology, implementing remote real-time monitoring of urban railway facilities. The derived real-time monitoring system for power facilities in urban railway substations will be applied not only to diagnose low voltage DC (direct current) railways but also to diagnose design of small power facilities of skyscrapers and apartments.

The Development of an Operating System for Load-following Real-time Transformer Loss Minimization and Economic Analyses on its' Test Operation (부하 추종형 실시간 변압기 손실감소운전시스템 개발과 시범운영 경제성 분석)

  • Lee, Ok-Bae;Ahn, Jae-Kyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.6
    • /
    • pp.797-803
    • /
    • 2012
  • In this paper, for minimizing the real-time operating load losses of the power transformer, a SCADA optimum operating system was developed, and the economic analyses on the test operation were performed. Transformer loss DB which reflects the economic integration operation criteria was constructed by referring the transformer manufacturer's loss data(iron loss, copper loss). Based on the loss DB, each substation transformer real-time loss was calculated according to the size of the transformer loads, and if integration or separation transformer operating conditions minimizing the loss are met, then a window pops-up and the dispatcher performs the substation equipments operation according to the procedure provided by this system. With the existing SCADA main program, the relation database of the substation facilities and integration/separation operation algorithm were developed and applied to Auto MTR Processor and pconn Processor Task module. Seven stations test data for seven months were analyzed for the economic analyses, and the results showed that Cost-Benefit ratio was 2.64, and IRR(Internal Rate of Return), 36%, which asserted the economic justification of the proposed system.

Development of IEC 61850 based Integration Engineering Tool for Intelligent Electronic Device (IEC 61850 기반의 IED 통합 엔지니어링 툴 개발)

  • Han, Jeong-Yeol;Ahn, Yong-Ho;Jang, Byung-Tae;Song, In-Jun;Kim, Yong-Hak
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.8
    • /
    • pp.101-108
    • /
    • 2010
  • In order to construct the IEC 61850 based substation automation system, the IED integration engineering tool is necessary to cope with the substation automation by full digital devices in the real power system. Compared the configuration tools provided IED vendors which are able to support the operation and communication analysis among IEDs, the XML based IED integration engineering tool can build, edit and save the ICD, SCL and CID files. Particularly, the IED integration engineering tool is possible to apply the IEC 61850 based IEDs to engineering the systems and also provides the reliability and efficiency of the system to the utilities and manufacturers.

Bus Voltage Analysis of Substation Connected to the Wind Generation Farm (풍력발전단지와 연계된 변전소의 모선전압 분석)

  • Kim Young Hwan;Hyun Gil Ju;Ko Seok Bum;Yang Ik Jun;Na Kyoung Yun;Kim Se Ho
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.236-238
    • /
    • 2004
  • In recent years wind turbine technology has undergone the rapid development in response to the demands for increased use of renewable sources of energy. Using wind turbines for production of electrical energy requires reliable operation. The increased share of wind power in electrical system makes it necessary to have grid-friendly interfaces between the wind turbines and the grid in order to maintain power quality. Increasingly wind turbines are being connected into electricity distribution system. The grid-connected wind power stations have many impacts on power systems such as voltage variations, harmonics. The paper investigates the influences of grid-connected wind power generation system on substation bus voltage.

  • PDF

Recent Trend on Condition Monitoring Technology of Insulating Machine in Metro (도시철도 절연기기 모니터링 기술 현황)

  • Park, Young;Jung, Ho-Sung
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.380-381
    • /
    • 2008
  • This paper consider the condition monitoring technology of electrical machine in metro substation need for efficient and effective management and diagnosis. Developing management system using condition monitoring system is very competitive field, and still to a great extent seen as an unnecessary cost. There are several approaches to maintenance management in urban transit such as reliability-centered maintenance, availability-target maintenance and preventive maintenance to advanced approaches involving condition monitoring techniques. In this paper we give a brief introduction to condition-based management and diagnosis in metro substation and which management system satisfying various demanding in railway.

  • PDF

Development of IEC 61850 Client Testing System for Verifying the Communication Conformance of Substation Automation (변전자동화 통신 적합성 검증을 위한 클라이언트 IEC 61850 시험시스템 개발)

  • Lee, Nam-Ho;Jang, Byung-Tae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.6
    • /
    • pp.169-176
    • /
    • 2010
  • Substation Automation System is basically operating throughout communicative services among IEC 61850 based devices. So, minimum requirement in order to install the system in the substation is to verify server and client conformance of IEDs and HMIs according to the IEC 61850 standard. Even though UCA IUG issued IEC 61850 conformance test procedures for both the server and the client, Much of the test is limited to IEDs as server and there is no client-only testing tool except KEMA server test tool sets. this study aims to develop IEC 61850 client testing system for verifying the full communication conformance of the substation automation system and this paper describes the design and implementation of the testing system.