• Title/Summary/Keyword: Electrical Installation

Search Result 6,497, Processing Time 0.032 seconds

Distribution Analysis of Land Surface Temperature about Seoul Using Landsat 8 Satellite Images and AWS Data (Landsat 8 위성영상과 AWS 데이터를 이용한 서울특별시의 지표면 온도 분포 분석)

  • Lee, Jong-Sin;Oh, Myoung-Kwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.434-439
    • /
    • 2019
  • Recently, interest in urban temperature change and ground surface temperature change has been increasing due to weather phenomenon due to global warming, heat island phenomenon caused by urbanization in urban areas. In Korea, weather data such as temperature and precipitation have been collected since 1904. In recent years, there are 96 ASOS stations and 494 AWS weather observation stations. However, in the case of terrestrial networks, terrestrial meteorological data except measurement points are predicted through interpolation because they provide point data for each installation point. In this study, to improve the resolution of ground surface temperature measurement, the surface temperature using satellite image was calculated and its applicability was analyzed. For this purpose, the satellite images of Landsat 8 OLI TIRS were obtained for Seoul Metropolitan City by seasons and transformed to surface temperature by applying NASA equation to the thermal bands. The ground measurement data was based on the temperature data measured by AWS. Since the AWS temperature data is station based point data, interpolation is performed by Kriging interpolation method for comparison with Landsat image. As a result of comparing the satellite image base surface temperature with the AWS temperature data, the temperature difference according to the season was calculated as fall, winter, summer, based on the RMSE value, Spring, in order of applicability of Landsat satellite image. The use of that attribute and AWS support starts at $2.11^{\circ}C$ and RMSE ${\pm}3.84^{\circ}C$, which reflects information from the extended NASA.

A Study on OBC Integrated 1.5kW LDC Converter for Electric Vehicle. (전기자동차용 OBC 일체형 1.5kW급 LDC 컨버터에 대한 연구)

  • Kim, Hyung-Sik;Jeon, Joon-Hyeok;Kim, Hee-Jun;Ahn, Joon-Seon
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.12 no.4
    • /
    • pp.456-465
    • /
    • 2019
  • PHEV(Plug in Hybrid Electric Vehicle) and BEV(Battery Electric Vehicle) equip high voltage batteries to drive motor and vehicle electric system. Those vehicle require OBC(On-Board Charger) for charging batteries and LDC(Low DC/DC Converter) for converting from high voltage to low voltage. Since the charger and the converter actually separate each other in electrical vehicles, there is a margin to reduce the vehicle weight and area of installation by integration two systems. This paper studies a 1.5kW LDC converter that can be integrated into an OBC using an isolated current-fed converter by simplifying the design of LDC transformers. The proposed LDC can control the final output voltage of the LDC by using a fixed arbitrary output voltage of the bidirectional buck-boost converter, so that Compared to the existing OBC-LDC integrated system, it has the advantage of simplifying the transformer design considering the battery voltage range, converter duty ratio and OBC output turn ratio. Prototype of the proposed LDC was made to confirm normal operation at 200V ~ 400V input voltage and maximum efficiency of 91.885% was achieved at rated load condition. In addition, the OBC-LDC integrated system achieved a volume of about 6.51L and reduced the space by 15.6% compared to the existing independent system.

Model-based Efficiency Analysis for Photovoltaic Generation O&M: A Case Study (태양광발전 운전 및 유지보수를 위한 모델기반 효율분석: 사례연구)

  • Yu, Jung-Un;Park, Sung-Won;Son, Sung-Yong
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.15 no.5
    • /
    • pp.405-412
    • /
    • 2022
  • This paper studies the method of estimating power loss and classifying the factors for improving the power generation efficiency through O&M. It is installed under various climatic conditions worldwide, operational and maintenance technologies suitable for the characteristics of the installation location are required. Existing studies related to solar power generation efficiency have been actively quantifying the impact on short-term losses by environmental factors such as high temperature, dust accumulation, precipitation, humidity, and wind speed, but analysis of the overall impact from a long-term operation perspective is limited. In this study, the potential for efficiency improvement was analyzed by re-establishing a loss classification system according to the power flow of solar power to derive a comprehensive efficiency model for long-term operation and estimating power loss through a case study for each region where climate conditions are classified. As a result of the analysis, the average annual potential for improving soiling loss was 26.9%, Death Valley 7.2%, and Seoul 3.8%. Aging losses was 6.6% in the 20th year as a cumulative. The average annual potential due to temperature loss was 2.9 % for Doha, 1.9% for Death Valley, and 0.2% for Seoul.

A Case Study of Risk Assessments and Safety Measures in a PCB Manufacturing Process (인쇄회로기판 제조 공정에서 위험성평가와 안전조치 적용 사례 연구)

  • Lee, Young Man;Lee, Inseok
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.4
    • /
    • pp.120-128
    • /
    • 2022
  • Printed circuit boards (PCBs) are a basic component in the electronics industry and are widely used in nearly all electronic products, such as mobile phones, tablet computers, and digital cameras, as well as in electric equipment. PCB manufacturing involves the use of many chemicals and chemical processes and therefore has more risks than other manufacturing sectors. This study aims to identify the causes of possible accidents during PCB manufacturing through risk assessment, develop and implement safety measures, and evaluate the effectiveness of these measures. Note that the safety measures developed to mitigate the risks of a certain process were also implemented for other similar processes. The risk assessments conducted over seven years, from 2015 to 2021, at a PCB manufacturing company identified 361 hazardous processes. Between 2016 and 2019, 41-56 hazardous processes were identified per year; such processes decreased to fewer than 20 per year after 2020. Application of the risk assessment results to the improvement of the hazardous processes with the similar characteristics seems to be effective in decreasing the risks. Equipment-related factors such as lack of appropriate maintenance, low work standards, and defective protection devices were responsible for 59.8% of all possible accidents. Because PCB manufacturing involves many chemicals, skin contact with hazardous substances, electric shock, fire, and explosion were the most common types of possible accidents (81.7%). In total, 505 safety measures were implemented, including 157 related to purchase and improvement of equipment and devices for safety (31.1%), 147 related to the installation/modification of fire prevention facilities (29.1%), and 69 related to the use of standard electrical appliances (13.7%). Risk assessment conducted after implementing the safety measures showed that these measures significantly decreased risk; 247 processes (68.4%) had a risk level of 3, corresponding to "very low," and 114 processes (31.6%) showed a risk level of 4, corresponding to "low." In particular, risk assessment of 104 processes with risk scores of 12 and 10 other processes with risk score of 16 showed that the risk decreased to 4 after implementing the safety measures. Thus, implementing these measures in similar manufacturing sectors that involve chemical processes can mitigate risk.

The Study on Control Algorithm of Elevator EDLC Emergency Power Converter (승강기 EDLC 비상전원 전력변환장치 제어 알고리즘 연구)

  • Lee, Sang-min;Kim, IL-Song;Kim, Nam
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.709-718
    • /
    • 2017
  • The installation of the elevator ARD(Automatic Rescue Device) system has been forced into law in these days in order to safely rescue passengers during power failure. The configuration of the ARD system consists of energy storage device, power converter and control systems. The EDLC(Electric Double Layer Capacitor) are used as energy storage device for rapid charge/discharge purposes. The power conditioning system (PCS) consists of bi-directional converter, 3-phase converter and control system. The dead-beat control system is adopted for most systems however it requires complex mathematical calculations, the high performance microprocessors are mandatory and thus it can be a cause of high manufacturing cost. In this paper the new control method for average current mode control is presented for simple structure. The control algorithm is applied to the single phase system and then expands to three phase system to meet the sysem requirements. The mathematical modeling using average modeling method is presented and analysed by PSIM computer simulation to verifie the validity of the proposed control methods.

Life Cycle Environmental Analysis of Valuable Metal (Ag) Recovery Process in Plating Waste Water (폐도금액내 유가금속(Ag) 회수 공정에 대한 전과정 환경성 분석)

  • Da Yeon Kim;Seong You Lee;Yong Woo Hwang;Taek Kwan Kwon
    • Resources Recycling
    • /
    • v.32 no.2
    • /
    • pp.12-18
    • /
    • 2023
  • In 2018, the demand for silver (referred to as Ag) in the electrical and electronics sector was 249 million tons. The demand stood at 81 million tons in the solar module production sector. Currently, due to the rapid increase in solar module installation, the demand for silver is increasing drastically in Korea. However, Korea's natural metal resources and reserves are insufficient in comparison to their consumption, and the domestic silver ore self-sufficiency rate was as low as 2.2% as of 2021. This implies that a recycling technology is necessary to recover valuable metal resources contained in the waste plating solution generated in the metal industry. Therefore, this study compared and analyzed, the results of the impact evaluation through life cycle assessment according to an improvement in the process of recovery of valuable metals in the waste plating solution. The process improvement resulted in reducing GWP (Global Warming Potential) and ADP(Abiotic Depletion Potential) by 50% and 67%, respectively. The GWP of electricity and industrial water was reduced by 98% and 93%, respectively, which significantly contributed to the minimization of energy and water consumption. Thus, the improvement in recycling technology has a high potential to reduce chemical and energy use and improve resource productivity in the urban mining industry.

A Study on An Integrated GEO/TES with Geothermal Heat Exchanger and Thermal Ice Storage (지중열 교환기와 빙축열조(Thermal Ice Storage)를 연계시킨 통합 지중열-빙축열조 시스템(Integrated GEO/TES))

  • Lohrenz ED.;Hahn Jeongsang;Han Hyuk Sang;Hahn Chan;Kim Hyoung Soo
    • Economic and Environmental Geology
    • /
    • v.38 no.6 s.175
    • /
    • pp.717-729
    • /
    • 2005
  • Peak cooling load of large buildings is generally greater than their peak heating load. Internal and solar heat gains are used fur selection of adquate equipment in large building in cold winter climate like Canada and even Korea. The cost of geothermal heat exchanger to meet the cooling loads can increase the initial cost of ground source heat pump system to the extend less costly conventional system often chosen. Thermal ice storage system has been used for many years in Korea to reduce chiller capacity and shift Peak electrical time and demand. A distribution system designed to take advantage of heat extracted from the ice, and use of geothermal loop (geothermal heat exchanger) to heat as an alternate heat source and sink is well known to provide many benifits. The use of thermal energy storage (TES) reduces the heat pump capacity and peak cooling load needed in large building by as much as 40 to $60\%$ with less mechanical equipment and less space for mechanical room. Additionally TES can reduce the size and cost of the geothermal loop by 1/3 to 1/4 compared to ground coupled heat pump system that is designed to meet the peak heating and cooling load and also can eliminate difficuties of geothermal loop installation such as space requirements and thermal conditions of soil and rock at the urban area.