• Title/Summary/Keyword: Electrical Inspection

Search Result 613, Processing Time 0.041 seconds

Design, Fabrication, and Performance Evaluation of Showing Material for Early Expression of Fire Signs and Combined Inspection (화재징후 조기표출과 복합검사를 위한 표출재 설계, 제작 및 성능 평가)

  • Dongcheol Shin;Hyoungho Ko
    • Journal of Sensor Science and Technology
    • /
    • v.32 no.3
    • /
    • pp.187-193
    • /
    • 2023
  • Previous research has explored early expression of fire signs before the burning of insulation. To achieve this, typically, automatic inspections are used to detect gas emitted from odor capsules at electrical connection points; additionally, early fire signs can be expressed using visual inspection of changes in the appearance of temperature caps. However, early detection of electrical fire is often difficult because only specific inspections, which are not complex, are performed. Therefore, in this paper, we present complex inspection techniques, such as visual inspection, odor inspection, and automatic inspection, and propose a showing material of fire signs that can solve conventional problems. In addition, this study examines the conditions under which the candidate material for the showing material is designed, the composition of the candidate material selected based on the designed conditions, the manufacturing means used to produce the showing material considering the temperature for early expression of fire signs, and the performance of the produced showing material. Furthermore, we analyze various effects that can occur through the proposed display material.

The Inspection Procedure and Method of GIS to Guarantee the Safety of Power Facility (전력설비 안전성 확보를 위한 GIS(가스절연개폐장치) 검사수행 절차 및 방법)

  • Park, Jun-Sung;Hwang, Kwang-Soo;Kim, Jin-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.361-364
    • /
    • 2015
  • 본 논문은 전기사업법 제61조의 공사계획인가 및 신고대상인 차단기에 대하여 동법 제63조에 의거해 실시하는 사용전검사의 항목 및 검사수행 방법에 대하여 서술하였다. 차단기는 전력계통을 이상전압에서 보호하기 위한 밀폐형 개폐장치로서 전기사업용 전기설비인 변전소에 설치되는 차단기는 대부분 GIS(Gas Insulated Switchgear)화 되고 있는 실정이다. GIS는 정상전류의 차단, 설비사고의 억제 및 파급사고 확산방지에 중추적인 역할을 수행하고 있기 때문에 그 중요성은 더욱 더 높아지고 있다고 볼 수 있다. 이에 핵심 전력설비인 GIS의 사용전 검사항목 및 검사수행 방법을 고찰함으로써 안정적인 전력공급과 전력계통의 신뢰도 제고에 기여하고자 한다.

  • PDF

Development of a Standard Checklist for Protection to Electrical Accidents of Laboratory (연구실 전기사고방지를 위한 표준체크리스트개발)

  • Lee, Dong-Yoon
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.3
    • /
    • pp.108-115
    • /
    • 2011
  • This paper informs the standard guideline of electrical inspection for the University laboratories and R&D institutes. A routine electrical inspection is there to prevent an electric shock and electrical fire accident in the Lab. The main issue of this paper is to check the problem of a routine electrical inspection and this paper provides a detailed guideline of a checklist for the Lab which do not have detailed instruction. It mentions the standard model of an effective routine inspection to upgrade the weak electrical environment in the Lab. One of the main purposes of this paper is to develop a routine checklist to control the electrical environment in the Lab. The evaluation checklist we develop will then be applied to every Lab. Introducing an electrical safety checklist builds a clear standard guideline for a real safety check. This will be used as a regular routine check-up for every Lab. The goal of this paper is to enforce safety from electrical accidents in the lab and it will provide safety guidelines for every Lab.

Study on the reform case about a bad connection of M.Tr 87Ry 2nd CT circuit etc. (M.Tr 87Ry 2nd CT 회로 오결선 등 개선사례 분석)

  • Park, Kang-Seo;Park, Jun-Sung;Choi, Jong-Soo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.374-378
    • /
    • 2008
  • The analysis about cases which does not correspond in electric equipment technical standard and judgement standard while doing pre inspection, it improves the technical specifications and the draft of construction plan. The analysis of the reform cases prevents the electric disaster and propagates the electrical safety. Hereafter the reform cases will improve the electric technical ability and help the electrical safety of the yard.

  • PDF

Development of Wireless Diagnostic System for Substation Equipments Using SMS Mode of Mobile Communication Network (이동통신망의 SMS방식을 이용한 변전기기 무선진단 시스템 개발)

  • Kim, Jin-Cheol;Kim, Ji-Ho;Yun, Man-Sik;Song, Ho-Jun;Lee, Hyang-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.259-261
    • /
    • 2003
  • This paper suggests wireless diagnosis and monitoring system using SMS mode of mobile communication network for distribution transformer which could prevent electrical accident in the near future. Data are acquired by measuring the temperature of insulator oil in the distribution transformer and load current. Data acquisition of sensor using mobile communication network carried out filtering of sensor's output to optimize the size of send data Merit of this inspection method is that management, control and monitoring some transformers can be carried out using only one server. This inspection method will be the way of inspection to be worth spotlight in the near future because it is able to solve easily with the minimum facility inspection about state of transformer which is operating, to wide coverage about machine's wrong operation in other field.

  • PDF

Solar Power Plant Inspection Techniques and Practices to Improve Inadequate Facilities (태양광 발전설비 검사기법 및 부적합설비 개선사례 분석)

  • Park, Byeong-Ha;Go, Seok-Il;Ahn, Seon-Ju;Choi, Joon-Ho
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.439-444
    • /
    • 2012
  • Photovoltaic energy is regarded as the key solution to the instability of energy supply and environmental pollution, and it is spreading from the developed countries to world wide. This paper looks into guide lines of KESCO (Korea electrical Safety Corporation) on Photovoltaic system and analyzed case of inconsistencies of pre-service inspection. Through these analyses it will be possible to prevent possible accidents in the process of installing Photovoltaic system and thus ensure electrical safety of Photovoltaic system.

  • PDF

Analysis of Remote Electrical Facilities Safety Checkup for General Use (일반용 전기설비 수용가의 원격전기안전점검 모델 설계 및 요소기술 분석)

  • Yoo, Jae-Geun;Choi, Myeong-Il;Jeon, Jeong-Chay
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2214-2215
    • /
    • 2008
  • KESCO performed periodical inspection every 1${\sim}$3 years to check the status of maintenance and performance of electric installations for general use (less than 600V in voltage and 75kW in capacity in residential homes) but recently a resident have been avoiding periodical check due to increase of sex crime and empty house, which more and more difficult to secure electrical safety of installation. In order to solve non-inspection problems and improve efficiency of inspection, this paper introduce the model of remote monitoring system that check electrical facilites for general use and we are developing remote monitoring device for reliability test.

  • PDF

Development of a Live-line Insulator Inspection Tool System for 154 kV Power Transmission Lines

  • Lee, Jae-Kyung;Park, Joon-Young;Cho, Byung-Hak;Oh, Ki-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.23-33
    • /
    • 2012
  • The current paper deals with a new live-line insulator inspection tool system that will be used by the Korea Electric Power Corporation for its 154 kV power transmission lines in 2011. Unlike the existing contact type tools, the developed inspection tool automates parts of the insulator inspection process using a sensor and an actuator. The tool sustains its weight independently, not by a lineman. In addition, the inspection tool measures the insulation resistance of an insulator together with its distribution voltage, thus providing more information for analysis and diagnosis. Such characteristics improve the system's operation efficiency, measurement reliability, and usability. We confirmed its effectiveness through live-line field tests with actual power transmission lines.

The Reduction Methods of Inspection Time for SMT Inspection Machines Using Clustering Algorithms (클러스터링 알고리즘을 이용한 SMT 검사기의 검사시간 단축 방법)

  • Kim, Hwa-Jung;Park, Tae-Hyoung
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2453-2455
    • /
    • 2003
  • We propose a path planning method to reduce the inspection time of AOI (automatic optical inspection) machines in SMT (surface mount technology) in-line system. Inspection windows of board should be clustered to consider the FOV (field-of-view) of camera. The number of clusters is desirable to be minimized in order to reduce the overall inspection time. We newly propose a genetic algorithm to minimize the number of clusters for a given board. Comparative simulation results are presented to verify the usefulness of proposed algorithm.

  • PDF

The Study on Application of Flying Inspection Method for the 22.9kV Distribution Line (22.9kV 배전선로 비행점검 방법 적용에 관한 연구)

  • Zhang, Jeong-Il;Kang, Byoung-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.2
    • /
    • pp.194-198
    • /
    • 2012
  • This paper describes flying inspection apparatus for 22.9kV distribution line. This apparatus is composed of multi-copter(more than 4 propellers), camcorder and remote controller. The existing inspections, such as hot-line inspection job and optical inspection method and distribution Line Checking Robot, have many restrictions. A electric working vehicle and hot-line job license are essential in hot-line inspection job. Besides its high cost, it can't be applied to the electric pole over 18m and road-blocked area. Optical method can't inspect upper side of electric facilities mounted on the electric pole. Robot method can't be applied to the corroded overhead earth wire and nothing of overhead earth wire. To solve the problems, in Korea Electric Power Co., we have applied flying inspection apparatus to the 22.9kV distribution line. The results of trial application show that this paper is practical and effective for the inspection technical method in 22.9kV distribution line