• 제목/요약/키워드: Electrical Inspection

검색결과 613건 처리시간 0.054초

화재징후 조기표출과 복합검사를 위한 표출재 설계, 제작 및 성능 평가 (Design, Fabrication, and Performance Evaluation of Showing Material for Early Expression of Fire Signs and Combined Inspection)

  • 신동철;고형호
    • 센서학회지
    • /
    • 제32권3호
    • /
    • pp.187-193
    • /
    • 2023
  • Previous research has explored early expression of fire signs before the burning of insulation. To achieve this, typically, automatic inspections are used to detect gas emitted from odor capsules at electrical connection points; additionally, early fire signs can be expressed using visual inspection of changes in the appearance of temperature caps. However, early detection of electrical fire is often difficult because only specific inspections, which are not complex, are performed. Therefore, in this paper, we present complex inspection techniques, such as visual inspection, odor inspection, and automatic inspection, and propose a showing material of fire signs that can solve conventional problems. In addition, this study examines the conditions under which the candidate material for the showing material is designed, the composition of the candidate material selected based on the designed conditions, the manufacturing means used to produce the showing material considering the temperature for early expression of fire signs, and the performance of the produced showing material. Furthermore, we analyze various effects that can occur through the proposed display material.

전력설비 안전성 확보를 위한 GIS(가스절연개폐장치) 검사수행 절차 및 방법 (The Inspection Procedure and Method of GIS to Guarantee the Safety of Power Facility)

  • 박준성;황광수;김진석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.361-364
    • /
    • 2015
  • 본 논문은 전기사업법 제61조의 공사계획인가 및 신고대상인 차단기에 대하여 동법 제63조에 의거해 실시하는 사용전검사의 항목 및 검사수행 방법에 대하여 서술하였다. 차단기는 전력계통을 이상전압에서 보호하기 위한 밀폐형 개폐장치로서 전기사업용 전기설비인 변전소에 설치되는 차단기는 대부분 GIS(Gas Insulated Switchgear)화 되고 있는 실정이다. GIS는 정상전류의 차단, 설비사고의 억제 및 파급사고 확산방지에 중추적인 역할을 수행하고 있기 때문에 그 중요성은 더욱 더 높아지고 있다고 볼 수 있다. 이에 핵심 전력설비인 GIS의 사용전 검사항목 및 검사수행 방법을 고찰함으로써 안정적인 전력공급과 전력계통의 신뢰도 제고에 기여하고자 한다.

  • PDF

연구실 전기사고방지를 위한 표준체크리스트개발 (Development of a Standard Checklist for Protection to Electrical Accidents of Laboratory)

  • 이동윤
    • 한국콘텐츠학회논문지
    • /
    • 제11권3호
    • /
    • pp.108-115
    • /
    • 2011
  • 대학 연구기관 등의 연구실에서 감전, 전기화재 등 전기사고방지를 위해 수행하는 전기분야 정기점검에 대한 문제점을 파악하고 명확한 기준이 없는 점검항목에 대해 실제 효율적으로 적용 가능하도록 구체적인 기준을 제시한다. 그래서 연구실 전기안전취약요인을 개선하도록 체계적이고 능률적인 정기점검 실시를 위한 표준모델을 마련하고자 한다. 또한, 모든 연구실의 전기안전환경을 중심으로 객관적인 평가가 가능하도록 공통으로 적용될 수 있는 점검항목을 도출하여 연구실 전기안전관리에 부합하도록 연구실 정기점검 전기분야 체크리스트를 개발 한다. 본 연구에서 개발된 전기분야 체크리스트는 실제 필요한 점검 항목에 대한 명확한 기준을 설정하여 모든 연구실에 공통으로 적용할 수 있도록 개발하여 정기점검 수행시 바로 실행 가능하도록 하였다. 이는 연구실의 전기사고 방지를 위한 효율적인 점검뿐만 아니라, 연구실안전수준을 전반적으로 상승시킬 것이다.

M.Tr 87Ry 2nd CT 회로 오결선 등 개선사례 분석 (Study on the reform case about a bad connection of M.Tr 87Ry 2nd CT circuit etc.)

  • 박강서;박준성;최종수
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2008년도 춘계학술대회 논문집
    • /
    • pp.374-378
    • /
    • 2008
  • 사업용전기설비에 대한 사용전검사 수행 중 전기설비기술기준 및 판단기준에 부합되지 않거나 공사계획신고의 기술시방서 및 설계도서 등의 내용과 일치 않는 부분에 대한 시정 조치한 개선사례를 분석하고 이를 전파하여 전기재해 예방에 도움을 주고자 하며, 향후에도 중요 개선사례들을 지속적으로 발굴하여 현장 전력기술 능력 향상을 위하여 노력해 나아가고자 한다.

  • PDF

이동통신망의 SMS방식을 이용한 변전기기 무선진단 시스템 개발 (Development of Wireless Diagnostic System for Substation Equipments Using SMS Mode of Mobile Communication Network)

  • 김진철;김지호;윤만식;송호준;이향범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.259-261
    • /
    • 2003
  • This paper suggests wireless diagnosis and monitoring system using SMS mode of mobile communication network for distribution transformer which could prevent electrical accident in the near future. Data are acquired by measuring the temperature of insulator oil in the distribution transformer and load current. Data acquisition of sensor using mobile communication network carried out filtering of sensor's output to optimize the size of send data Merit of this inspection method is that management, control and monitoring some transformers can be carried out using only one server. This inspection method will be the way of inspection to be worth spotlight in the near future because it is able to solve easily with the minimum facility inspection about state of transformer which is operating, to wide coverage about machine's wrong operation in other field.

  • PDF

태양광 발전설비 검사기법 및 부적합설비 개선사례 분석 (Solar Power Plant Inspection Techniques and Practices to Improve Inadequate Facilities)

  • 박병하;고석일;안선주;최준호
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2012년도 춘계학술발표대회 논문집
    • /
    • pp.439-444
    • /
    • 2012
  • Photovoltaic energy is regarded as the key solution to the instability of energy supply and environmental pollution, and it is spreading from the developed countries to world wide. This paper looks into guide lines of KESCO (Korea electrical Safety Corporation) on Photovoltaic system and analyzed case of inconsistencies of pre-service inspection. Through these analyses it will be possible to prevent possible accidents in the process of installing Photovoltaic system and thus ensure electrical safety of Photovoltaic system.

  • PDF

일반용 전기설비 수용가의 원격전기안전점검 모델 설계 및 요소기술 분석 (Analysis of Remote Electrical Facilities Safety Checkup for General Use)

  • 유재근;최명일;전정채
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.2214-2215
    • /
    • 2008
  • KESCO performed periodical inspection every 1${\sim}$3 years to check the status of maintenance and performance of electric installations for general use (less than 600V in voltage and 75kW in capacity in residential homes) but recently a resident have been avoiding periodical check due to increase of sex crime and empty house, which more and more difficult to secure electrical safety of installation. In order to solve non-inspection problems and improve efficiency of inspection, this paper introduce the model of remote monitoring system that check electrical facilites for general use and we are developing remote monitoring device for reliability test.

  • PDF

Development of a Live-line Insulator Inspection Tool System for 154 kV Power Transmission Lines

  • Lee, Jae-Kyung;Park, Joon-Young;Cho, Byung-Hak;Oh, Ki-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권1호
    • /
    • pp.23-33
    • /
    • 2012
  • The current paper deals with a new live-line insulator inspection tool system that will be used by the Korea Electric Power Corporation for its 154 kV power transmission lines in 2011. Unlike the existing contact type tools, the developed inspection tool automates parts of the insulator inspection process using a sensor and an actuator. The tool sustains its weight independently, not by a lineman. In addition, the inspection tool measures the insulation resistance of an insulator together with its distribution voltage, thus providing more information for analysis and diagnosis. Such characteristics improve the system's operation efficiency, measurement reliability, and usability. We confirmed its effectiveness through live-line field tests with actual power transmission lines.

클러스터링 알고리즘을 이용한 SMT 검사기의 검사시간 단축 방법 (The Reduction Methods of Inspection Time for SMT Inspection Machines Using Clustering Algorithms)

  • 김화중;박태형
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2453-2455
    • /
    • 2003
  • We propose a path planning method to reduce the inspection time of AOI (automatic optical inspection) machines in SMT (surface mount technology) in-line system. Inspection windows of board should be clustered to consider the FOV (field-of-view) of camera. The number of clusters is desirable to be minimized in order to reduce the overall inspection time. We newly propose a genetic algorithm to minimize the number of clusters for a given board. Comparative simulation results are presented to verify the usefulness of proposed algorithm.

  • PDF

22.9kV 배전선로 비행점검 방법 적용에 관한 연구 (The Study on Application of Flying Inspection Method for the 22.9kV Distribution Line)

  • 장정일;강병석
    • 전기학회논문지
    • /
    • 제61권2호
    • /
    • pp.194-198
    • /
    • 2012
  • This paper describes flying inspection apparatus for 22.9kV distribution line. This apparatus is composed of multi-copter(more than 4 propellers), camcorder and remote controller. The existing inspections, such as hot-line inspection job and optical inspection method and distribution Line Checking Robot, have many restrictions. A electric working vehicle and hot-line job license are essential in hot-line inspection job. Besides its high cost, it can't be applied to the electric pole over 18m and road-blocked area. Optical method can't inspect upper side of electric facilities mounted on the electric pole. Robot method can't be applied to the corroded overhead earth wire and nothing of overhead earth wire. To solve the problems, in Korea Electric Power Co., we have applied flying inspection apparatus to the 22.9kV distribution line. The results of trial application show that this paper is practical and effective for the inspection technical method in 22.9kV distribution line