Park, Young-Moon;Kim, Dong-Gee;Won, Jong-Ryul;Park, Jong-Bae
Proceedings of the KIEE Conference
/
1997.07c
/
pp.1153-1155
/
1997
Electric business all over the world is dramatically changed from vertically integrated monopoly to competition systems. Also, independent power producers(IPPs) will start their commercial operation from the year 2001 in Korea. In this regard, determination of the transaction cost between IPPs and electric utilities will be a hot issue, and electric utilities requires a new framework to support their decision-making. This paper presents the concept of the avoided cost which can be used for economic studies. This paper also describes a novel algorithm to evaluate the avoided cost of a IPP. The case studies are performed on the basis of the official generation expansion plan of Korea by using the Wien Automatic System Planning Package(WASP).
Kim, Moon-Young;Baek, Young-Sik;Kim, Jung-Hoon;Song, Kyung-Bin
Proceedings of the KIEE Conference
/
2000.07a
/
pp.388-390
/
2000
The production of electricity and the pattern of consumption in competitive electricity market are changing. The price of electric power in spot market will be varied by the economic electricity availability of generation utilities and electricity consumers. DSM(demand-side management) is a method which provides simultaneously economics to utilities and consumers as main participants in electricity market. In this paper, it is argued that the effect of DSM in competitive electricity market for consumers, generation utilities, and transmission utilities.
The purpose of this study is an economic analysis of power plant utilities by comparing electricity generating cost including environmental costs. Considering the enormous role of electricity in the national economy, it is very important to study the effect of environmental regulation on the electricity sector. Because power utilities need for large investment during construction, operation and maintenance, and also require much construction lead time. Economic analysis is the important process in the electric system expansion planning. This paper compares the costs of electricity generation including environmental costs between a coal-fired power plant and an LNG combined cycle power plants. With the simulation, this study surveys the sensitivity of fuel prices, interest rate and carbon tax. In each case, this sensitivity can help to decide which utility is economically better in environmental regulation circumstance.
The Institute of Electrical Engineers of Japan (JIEE) was founded far back in 1888, in the very dawn period of the electric power utilities, For the past 93 years since its establishment, the JIEE has been contributing much, in the same manner as you, towared technological progress and industrial growth in many fields of electrical engineering in Japan. Now, I am very happy to say that it will certainly be a matter of great significance for the Institute of Electrical Engineers in both countries to exert their cooperative efforts for establishment of new technologies towared the future. Today I would like to introuduce you the current status fo electrical power engineering in the Japanese electric utilities and to refer to the future R and D tasks coping with the severe energy situation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.23
no.11
/
pp.76-83
/
2009
In today's competitive power market, electric power utilities have strived to provide energy at an acceptable level of quality due to increased expectations from customers. For this reason, electric power utilities have invested in electric equipment and new techniques. That is the Distribution Automation System (DAS). A merit of DAS is the ability to reduce outage time because of fast service restoration. However, DAS is usually installed in outdoor environments. Therefore, their efficiency is affected by the external conditions. Lightning creates varying degrees of physical stress on DAS. This paper focuses on the reliability of DAS for lightning. Four application studies were performed to compare the reliability indices.
In the present research, the exclusive analysis system based on the CFD method were suggested to predict the fire-suppression performance of water mist fire-suppression equipments for design applications. The computing scope is ranged from starting pump to fire-suppression equipments, composed of three parts that calculation of flow rate and pressure distribution at each nozzle, examining of spray performance and predicting of fire-suppression performance in the fire space. Application were done to the fire-suppression system for electric power generation plants. The results were analyzed by comparison between numerical results and initial design conditions in terms of thermal and fluid mechanics.
Proceedings of the Korean Society of Precision Engineering Conference
/
2005.06a
/
pp.1819-1823
/
2005
Incorrect information on public sites can cause serious problem. One of relevant countermeasures against this problem is to detect of buried underground utilities in real time. Although there have been several method to detect of buried underground utilities, such as investigating of gravity and elastic wave and electric field, they have not been so efficient tools. Because it is too expensive and difficult to use. In this paper, magnetic sensors which could provide an easier and more efficient method are used to detect of buried underground utilities. Also fluxgate method of self detection are used. Input signal is used $1\~10kHz$ frequency. Filtering and signal processing of output signal are used labview software. After experiment, detection system of buried underground utilities which used magnetic shows possibility of precise detecting of laying object based on theorectical analysis for electromagnetic field.
The purpose of this study is to make an economic analysis of power plant utilities by examining electricity generating costs with environmental consideration. Economic growth has caused pollutant emission, and subsequent environmental pollution has been identified as a very real limit to sustainable development. Considering the enormous role of electricity in the national economy, it is thus very important to study the effect of environmental regulations on the electricity sector. Because power utilities need large investments during construction, operation and maintenance, and also require much construction lead time. Economic analysis is the very important process in the electric system expansion planning. In this study, the levelized generation cost method is used in comparing economic analysis of power plant utilities. Among the pollutants discharged of the electricity sector, this study principally deals with the control activities related only to $CO_2$, and $NO_2$, since the control cost of $SO_2$, and TSP (Total Suspended Particulates) is already included in the construction cost of utilities. The cost of electricity generation in a coal-fired power plant is compared with one in an LNG combined cycle power plant. Moreover this study surveys the sensitivity of fuel price, interest rate and carbon tax. In each case, this sensitivity can help to decide which utility is economically justified in the circumstance of environmental regulations.
The continuous growth of electric vehicles has caused electric power shortages in conventional utilities owing to the charging of electric-vehicle batteries. In order to increase the capacity of these utilities, photovoltaic systems may be an appropriate solution because of their benefits. However, a large amount of loss is generated in a conventional charging structure using photovoltaic sources owing to the many power conversion processes. This paper describes a simple integrated battery charger that utilizes a PV generation system. Moreover, the system control algorithm is deduced by analyzing the operation modes in order to control the proposed integrated system. The proposed system and algorithm are verified by a 3.3-kW prototype, resulting in an increase in the efficiency of approximately 7% to 15% compared with the conventional system. And, to examine the feasibility of the proposed system, the simulation for multi-charger with various conditions are progressed.
KIEE International Transactions on Power Engineering
/
v.11A
no.4
/
pp.39-44
/
2001
As electric power systems have been moving from vertically integrated utilities to a deregulated environment, the charging of reactive power management is a new challenging them for market operators. This paper proposes a new methodology to compute the costs of providing reactive power management service in a competitive electrical power market. The proposed formulation, which is basically different from those shown in the literature, consists of two parts. One is to recover investment capital costs of reactive power supporting equipment based on a reactive power flow tracing algorithm. The other is to recover operational costs based on variable spot prices using the optimal power flow algorithm. The charging shapes resulted from the proposed approach exhibit a quite good meaning viewed from a practical sense. It turns out that reactive power charged are mostly due to recovery of capital costs and slightly due to recovery of operational costs. The methods can be useful in providing additional insight into power system operation and can be used to determined tariffs of a reactive power management service.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.