• Title/Summary/Keyword: Electric safety

Search Result 1,827, Processing Time 0.038 seconds

Towards the Application of Safety Integrity Level for Improving Process Safety (공정안전향상을 위한 Safety Integrity Level의 적용 방향)

  • Kwon, Hyuck-Myun;Park, Hee-Chul;Chun, Young-Woo;Park, Jin-Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.64-69
    • /
    • 2012
  • The concept of SIL is applied in the most of all standards relating to functional system safety. However there are problems for the people to apply SIL to their plants. as these standards don't include sufficient informations. In this regards, this paper will suggest the direction of SIL application and concept based on IEC 61508 and IEC 61511. A Safety Integrity Level(SIL) is the discrete level(one out of possible fours), corresponding to a range of the probability of an E/E/PE (Electric/Electrical/Programmable Electrical) safety-related system satisfactorily performing the specific safety functions under all the stated conditions within a stated period of time. SIL can be divided into the target SIL(or required SIL) and the result SIL. The target SIL is determined by the risk analysis at the analysis phase of safety lifecycle and the result SIL is calculated during SIL verification at the realization phase of safety lifecycle. The target SIL is determined by the risk analysis like LOPA(Layer Of Protection Analysis), Risk Graph, Risk Matrix and the result SIL is calculated by HFT(Hardware Fault Tolerance), SFF(Safe Failure Fraction) and PFDavg(average Probability of dangerous Failure on Demand). SIL is applied to various areas such as process safety, machinery(road vehicles, railway application, rotating equipment, etc), nuclear sector which functional safety is applied. The functional safety is the part of the overall safety relating to the EUC and the EUC control system that depends on the correct functioning of the E/E/PE safety-related systems and other risk reduction measures. SIL is applied only to the functional safety of SIS(Safety Instrumented System) in safety. EUC is the abbreviation of Equipment Under Control and is the equipment, machinery, apparatus or plant used for manufacturing, process, transportation, medical or other activities.

A Study on Installation of Monitoring System of Wireless Power Transmission System (무선전력전송 시스템의 모니터링 시스템 구축에 관한 연구)

  • Song, Young-Sang;Han, Woon-Ki;Jung, Jin-Soo;Lim, Hyun-Sung;Cho, Sung-Koo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.4
    • /
    • pp.47-53
    • /
    • 2015
  • The electrical safety and efficiency is the most important thing of the electric vehicle charging system. The prior system is contact charging system that is contacted directly by human. So, it has riskiness such as electric shock in the case of poor insulation or contact problems. To solve these safety issues and the convenience problems, a wireless power transmission system has been developed and is currently in trial operation. However, because high frequency is used in wireless power transmission system instead of commercial frequency, we need to apply protection measures concerning electric shock and equipment protection. Also, it should be accompanied by measuring efficiency for the effective operation of the wireless power transmission system. Therefore, we structured monitoring system in trial operation area of wireless power transmission system and applied decision algorithm for protection of human and equipment and economic operation of it.

The Prevention Countermeasure against Breakdown of GIS using the Preventive Diagnostic Technology (예방진단기술을 활용한 GIS 고장예방대책)

  • Choi, Jong-Soo;Kim, Jong-Gu;Park, Jun-Sung
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.423-427
    • /
    • 2009
  • In the circumstances which a highly reliable operation in electric power facilities of extra high voltage and large capacity is needed, the importance of a preventive diagnostic technology is growing large day and day. The settlement of a preventive diagnostic technology for optimization and efficient management on the electric power facilities like GIS enable the reduce of repair fee, the improvement of safety and the systematic management of electric power facilities. The remaining life prediction of facilities will play a decisive role as a core technology of a preventive diagnostics in the future. And so it is necessary a continuous research and concern for the development of a preventive diagnostic technology hereafter.

  • PDF

MIGSHIELD: A new model-based interactive point kernel gamma ray shielding package for virtual environment

  • Li, Mengkun;Xu, Zhihui;Li, Wei;Yang, Jun;Yang, Ming;Lu, Hongxin;Dai, Xinyu
    • Nuclear Engineering and Technology
    • /
    • v.52 no.7
    • /
    • pp.1557-1564
    • /
    • 2020
  • In this paper, 3D model-based interactive gamma ray shielding package (MIGSHIELD) is developed in virtual reality platform for windows operating system. In MIGSHIELD, the computational methodology is based on point kernel algorithm (PK), several key parameters of PK are obtained using new technique and new methods. MIGSHIELD has interactive capability with virtual world. The main features made in the MIGSHIELD are (i) handling of physical information from virtual world, (ii) handling of arbitrary shapes radioactive source, (iii) calculating the mean free path of gamma ray, (iv) providing interactive function between PK and virtual world, (v) making better use of PK for virtual simulation, (vi) plug and play. The developed package will be of immense use for calculations involving radiation dose assessment in nuclear safety and contributing to fast radiation simulation for virtual nuclear facilities.

Reactor Power Cutback System Test Experience at YGN 4

  • Chi, Sung-Goo;Kim, Se-Chang;Seo, Jong-Tae;Eom, Young-Meen;Wook, Jeong-Dae;Park, Young-Boo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.10a
    • /
    • pp.235-241
    • /
    • 1995
  • YGN 3 and 4 are the nuclear power plants having System 80 characteristics with a rated thermal output of 2815 MWth and a nominal net electrical output of 1040 MWe. YGN 3 achieved commercial operation on March 31, 1995 and YGN 4 completed Power Ascension Test (PAT) at 20%, 50%, 80% and 100% power by September 23, 1995. YGN 3 and 4 design incorporates the Reactor Power Cutback System (RPCS) which reduces plant trips caused by Loss of Load (LOL)/Turbine Trip and Loss of One Main Feedwater Pump (LOMFWP). The key design objective of the RPCS is to improve overall plant availability and performance, while minimizing challenges to the plant safety systems. The RPCS is designed to rapidly reduce reactor power by dropping preselected Control Element Assemblies (CEAs) while other NSSS control systems maintain process parameters within acceptable ranges. Extensive RPCS related tests performed during the initial startup of YGN 4 demonstrated that the RPCS can maintain the reactor on-line without opening primary or secondary safety valves and without actuating the Engineered Safety Features Actuation System (ESFAS). It is expected that use of the RPCS at YGN will increase the overall availability of the units and reduce the number of challenges to plant safety systems.

  • PDF

Development of Thermal Precursor DB for Partial Disconnection and Poor Contact on Electrical Wire (배선에서의 반단선 및 접촉불량에 대한 열적 전조 DB구축)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Lee, Jong-Ho;Kang, Dong-Kyu
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.2
    • /
    • pp.30-36
    • /
    • 2009
  • This paper aims at the precursor analysis and DB development of electrical fires based on thermal and current signals for partial disconnection and poor contact on electric wires through experiments and simulations. Also, DB system required for developing the precursor DB with these data was studied and designed. Firstly, in case of partial disconnection, characteristics were derived and analyzed by experiment and electrical-thermal finite element method(Flux 3D) on the model wires which consist of VCTF and IV electric wires. Based on the characteristics, About 351 partial disconnection precursor patterns were generated by the thermal analysis for electric wire according to deterioration time under normal state and 200% overload state of rated current. Secondly, in order to develop poor contact precursor patterns, temperature value and the current signal were considered. In simulating the poor contact situation on connector area of MCCB, connection torque was changed. Through the experimental analysis, about 251 poor contact precursor patterns were generated. Finally, Using thermal precursor patterns obtained by partial disconnection and poor contact, electrical fire thermal precursor DB was developed.

Personnel Safety Related to Disconnection of PEN Conductor in TN-C-S System (TN-C-S계통에서 PEN도체 단선이 인체안전에 미치는 영향)

  • Kim, Jung-Cheol;Lee, Kyu-Sun;Lee, Bok-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.5
    • /
    • pp.58-64
    • /
    • 2012
  • In electric power supply systems, an earthing system determines the electric potential of the conductors related to that of the Earth's surface. The choice of earthing system has implications for the safety of the power supply systems. There are considerably different regulations for earthing (grounding) systems in each country. A protective earth(PE) conductor ensures that all exposed conductive surfaces are at the same electric potential as the earth surface. This paper deals with that when PEN conductor of TN-C-S system is disconnected, dangerous touch voltage causes personnel body to be harmed and human being's property to be damaged seriously. For this reason, this paper explains how serious problems can occur when the fault current flows. As a consequence, we can understand how we can design earthing system properly to ensure the personnel safety against earth faults. The result shows the way that TN-C-S system can be applied safely in Korea.

The measurement of the half period modulated pulse on earth for detection of a underground electric leakage point (지중선로 누전점 탐지를 위한 반주기 변조된 대지 펄스 측정)

  • Kim, Jae-Hyun;Jeon, Jeong-Chay;Yoo, Jae-Geun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.11
    • /
    • pp.5123-5127
    • /
    • 2011
  • Research and development for the technology, that is about maintenance and accidents prevention of underground power distribution line, are demanding. The precise detection of leakage point of underground power line is very important, because it is difficult to detect the exact location of a fault in underground power line and to repair faults. When earth electric potential is measured to detect underground electric leakage point after transmitting AC electric pulse wave to underground power line, it must be measured in a specific half period of AC pulse wave because the distribution of the electric earth potential varies with the polarity of the transmitted wave. In this paper we proposed the measurement of half period modulated earth potential as a method to detect a underground leakage point. And We compared the proposed method with other methods. Through experiments we verified that the proposed method can be implemented and operated properly.

A Study on the Quantitative Risk Assessment of Mobile Hydrogen Refueling Station (이동식수소스테이션 정량적 위험성평가에 관한 연구)

  • KIM, DONG-HWAN;LEE, SU-MIN;JOE, CHOONG-HEE;KANG, SEUNG KYU;HUH, YUN-SIL
    • Journal of Hydrogen and New Energy
    • /
    • v.31 no.6
    • /
    • pp.605-613
    • /
    • 2020
  • In July and October of this year, the government announced the 'Green new deal plan within the Korean new deal policy' and 'Strategies for proliferation of future vehicles and market preoccupation'. And, in response to changes in the global climate agreement, it has decided to expand green mobility such as electric vehicles and hydrogen electric vehicles with the aim of a "net-zero" society. Accordingly, the goal is to build 310 hydrogen refueling stations along with the supply of 60,000 hydrogen vehicles in 2022, and the hydrogen infrastructure is being expanded. however, it is difficult to secure hydrogen infrastructure due to expensive construction costs and difficulty the selection of a site. In Korea, it is possible to build a mobile hydrogen station according to the safety standards covering special case of the Ministry of Industry. Since the mobile hydrogen station can be charged while moving between authorized place, it has the advantage of being able to meet a large number of demands with only one hydrogen refueling station, so it is proposed as a model suitable for the early market of hydrogen infrastructure. This study demonstrates the establishment of a hydrogen refueling station by deriving a virtual accident scenario for leakage and catastrupture for each facility for the risk factors in a mobile hydrogen station, and performing a quantitative risk assessment through the derived scenario. Through the virtual accident scenario, direction of demonstration and implications for the construction of a mobile hydrogen refueling station were derived.