• 제목/요약/키워드: Electric power generation industry

검색결과 135건 처리시간 0.03초

Development of an Integrated Power Market Simulator for the Korean Electricity Market

  • Hur Jin;Kang Dong-Joo;Moon Young-Hwan
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권4호
    • /
    • pp.416-424
    • /
    • 2005
  • At present, the Korean electricity industry is undergoing restructuring and the Cost Based-generation Pool (CBP) market is being operated in preparation of a Two Way Bidding Pool (TWBP) market. In deregulated electricity industries, an integrated power market simulator is one of the tools that can be used by market participants and market operators analyzing market behaviors and studying market structures and market codes. In this regard, it is very important to develop an electricity market simulator that reflects market code providing a market operation mechanism. This paper presents the development of an integrated market simulator, called the Power Exchange Simulator (PEXSIM), which is designed to imitate the Korean electricity market considering the various features of the market operating mechanism such as uniform price and constrained on/off payment. The PEXSIM is developed in VB.NET and composed of five modules whose titles are M-SIM, P-SIM, O-SIM, T-SIM and G-SIM interfacing the Access database program. To verify the features and the performance of the PEXSIM, a small Two Way bidding market with a 12-bus system and a One Way bidding market for generator competition will be presented for the electricity market simulations using PEXSIM.

발전력 시장에서의 시장지배력 억제를 위한 장기 계약량 산정에 관한 연구 (Evaluation of Long-term Contracts for Market Power Mitigation in Generation Markets)

  • 송광재;허돈;남영우;박종근;정해성;윤용태
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권1호
    • /
    • pp.38-42
    • /
    • 2005
  • Restructuring of the electric power industry has brought the issue of market competitiveness to surface. Recent years have witnessed the appearance of a particular seller or group of sellers exercising market power in electricity supply. In fact, much scholarly work has been done on how to identify and mitigate such abuse by market management rules. In this paper we assess the possible market power on the basis of pivotal supplier test and propose the method to determine the reasonable quantity of long-term contracts which can play a crucial role in mitigating the market power for a pivotal player. Furthermore the market efficiency is guaranteed by making long term contracts with a pivotal player up to the quantity to ensure that the pivotal player has no incentive to abuse the pivotal quantity in the electricity market.

전력변환기 병렬운전을 위한 펄스폭 정보를 이용한 새로운 통신방식 (New Communication Method using Pulse Width Information for Power Converter Parallel Operation )

  • 김동환;최성철;레동부;박성준;박성미
    • 한국산업융합학회 논문집
    • /
    • 제26권6_2호
    • /
    • pp.1097-1108
    • /
    • 2023
  • Recently, demand for technology for energy economy and stable supply is increasing due to the increase in power demand of loads. The amount of DC power generation using new and renewable energy is noticeably increasing, and the use of DC power supplies is also increasing due to the increase in electric vehicles and digital loads. During parallel operation to increase the capacity of the power converter, the module bus method or the method using Can communication and serial communication has significant difficulties in smooth operation due to communication time delay for information sharing. Synchronization of information sharing of each power converter is essential for smooth parallel operation, and minimization of communication time delay is urgently needed as a way to overcome this problem. In this paper, a new communication method using pulse width information is proposed as a communication method specialized for parallel operation of power converters to compensate for the disadvantage of communication transmission delay in the existing system. The proposed communication method has the advantage of being easily implemented using the PWM and Capture function of the microcomputer. In addition, the DC/DC converter for DC distribution was verified through simulation and experiment, and it has the advantage of easy capacity expansion when applied to parallel operation of various types of power converters as well as DC/DC converters.

IPP와의 전력거래에서 연도별 요금지불 구조의 영향 (The Effect of Yearly Purchase Price Pattern in Electricity Transaction Between Utility and IPPs)

  • 김창수;진병문;권영한
    • 에너지공학
    • /
    • 제8권2호
    • /
    • pp.265-271
    • /
    • 1999
  • 최근 우리나라는 전력산업의 효율성 향상과 경쟁체제 강화를 위하여 발전시장을 민간에 개방하고, 경쟁입찰에 의해 민전 사업자의 진입을 확대하고 있다. 이러한 민전 사업에 있어서 향후 전력요금의 지불패턴은 매우 중요하다. 현재는 용량요금에는 균등화 지불패턴을 그리고 전력량 요금에는 물가상승률을 반영하고 있다. 본 논문은 일반전기사업자와 발전사업자간의 전력거래시 발생하는 연도별 요금수준을 각종 지불패턴에 따라 산정하는 방법을 제시하고, 그 결과를 비교 분석하였다. 분석 결과, 양사간의 위험도를 분산할 수 있는 부분 하향식 지불패턴이 우리나라 전력시장에서 적용가능성이 크고, 할인율의 요금에 대한 영향이 큰 것으로 나타났다.

  • PDF

수요관리 프로그램의 잠재량 평가방안 (Evaluation Mechanism of DSM Potentials)

  • 진병문;이창호;김창수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.421-423
    • /
    • 2001
  • Restructuring of electricity industry is going on for the purpose of introducing competition and after separation of generation and retail business and introduction of competition, substantial change is expected in overall electric power system. In other words, DSM projects are divided with public projects and private projects. Particularly for public project, it is essential to evaluate the DSM volumes by program. This paper tries to derive the ways for achieving the necessary DSM goal in the electricity industry in Korea. First of all, by analyzing the load in Korea, we forecast the standard demand and estimate the technological potentials of each program in considering DSM technological indicators. Moreover, by using economic analysis by program, we estimate economic potentials and finally, we estimate the potentials by program in considering the DSM policy. We estimate the potentials by using random method because application methodology and procedures by program are not established until now, which leads to not obtaining transparency for implementation effect by program. Therefore, this paper estimates the future potentials of DSM projects by using the logical and systematic analytic method and establishing database for DSM basic indicator. The DSM goals estimated by this method will be reflected to mid/long term nation-wide resource planning, which will mitigate anticipated power supply shortage and be applied to derive desirable energy demand/supply structure.

  • PDF

A Case Study of Decreasing Environment Pollution Caused by Energy Consumption of a Dormitory Building Which Only Using Electricity by Efficiently Simulating Applying Residential SOFC (Solid Oxide Fuel Cell)

  • Chang, Han;Lee, In-Hee
    • Architectural research
    • /
    • 제21권1호
    • /
    • pp.21-29
    • /
    • 2019
  • Recent years in Korea, some new developed buildings are only using electricity as power for heating, cooling, bathing and even cooking which means except electricity, there is no natural gas or other kinds of energy used in such kind of building. In vehicle industry area, scientists already invented electric vehicle as an environment friendly vehicle; after that, in architecture design and construction field, buildings only using electricity appeared; the curiosity of the environment impact of energy consumption by such kind of building lead me to do this research. In general, electricity is known as a clean energy resource reasoned by it is noncombustible energy resource; however, although there is no environmental pollution by using electricity, electricity generation procedure in power plant may cause huge amount of environment pollution; especially, electricity generation from combusting coal in power plant could emit enormous air pollutants to the air. In this research, the yearly amount of air pollution by energy using under traditional way in research target building that is using natural gas for heating, bathing and cooking and electricity for lighting, equipment and cooling is compared with yearly amount of air pollution by only using electricity as power in the building; result shows that building that only uses electricity emits much more air pollutants than uses electricity and natural gas together in the building. According to the amount of air pollutants comparison result between two different energy application types in the building, residential SOFC (Solid oxide fuel cell) is simulated to apply in this building for decreasing environment pollution of the building; furthermore, high load factor could lead high efficiency of SOFC, in the scenario of simulating applying SOFC in the building, SOFC is shared by two or three households in spring and autumn to increase efficiency of the SOFC. In sum, this research is trying to demonstrate electricity is a conditioned environment friendly energy resource; in the meanwhile, SOFC is simulated efficiently applying in the building only using electricity as power to decrease the large amount of air pollutants by energy using in the building. Energy consumption of the building is analyzed by calibrated commercial software Design Builder; the calibrated mathematical model of SOFC is referred from other researcher's study.

Tele-metering

  • Hearte, L.O.
    • 전기의세계
    • /
    • 제2권
    • /
    • pp.6-14
    • /
    • 1949
  • Telemetering may be described as the art of metering at a considerable distance those quantities which are ordinarily encountered in industry, and in the generation of electric power. It is in the production of electric power that telemetering is particularly important, for it permits the system operator, or load dispatcher, to have before him at all times a continuous graphic record of the power output of each individual generating station together with an automatically made continuous graphic record of the total system output. There desired individual graphic records may be obtained showing power flow in or out, on important tie lines, etc. Such arrangements have the very great advantage that loads may be assigned to each generating station so that the best over-all system economy may be obtained and the system operator at all times may see with his own eyes that loads scheduled are actually held at the various stations. Moreover, with such equipment, in the event of system or station trouble the load dispatcher can see exactly what station, or stations, are affected and to what extent, without having to get in touch with anyone by telephone. Decisions can, therefore, be quickly reached for rescheduling the load. One of the most accurate and reliable telemetering systems is based on the use of potentiometric circuits, the fundamentals of which are discussed below. A member of such telemetering systems have been installed for the Boston Edicon Co., Boston, Massachusetts, the Consolidated Edison Co. of New York City. The Public Service Gas & Electric Co. of Newark, new Jersey. The Philadelphia Electric Co. for Philadelphia, Pennsylvania, and the Pennsylvania Railroad Co. for their electrified zone between New York and Washington a distance of over 200 miles. The scale of the totalizing recorder for the New York area is 3,000,00 KW. That of the totalizing recorder for the Philadelphia area is 2,000,000 KW. The initial installation using this type of equipment described was placed in service for the Philadelphia Electric Co. in 1923. All of the original recording instruments are still in service, later instruments have been added to take care of additions to the power system and naturally these later recorders have incorporated in those refinements in design made since the earlier ones were manufactured. Many other installations of similar equipment have been made in the United States in various locations such as at St. Louis, on the West Coast, at Baltimore and in Washington, D.C. While the use of these basic potentiometric circuits involves the use of continuous metallic circuits of good insulation resistance and free of grounds, nevertheless, intermediate transmission links, involving and impulse method suitable for use on telephone Morse carrier channels is available. This same method may be employed on power line carrier systems and is also suitable for use on beam type microwave transmission. Many impulse type units are also used as a link in these potantiometric methods. For the sake of brevity a description is given only of these basic potentiometric circuits. If there is sufficient interest in Korea, a further paper can be given covering those impulse circuits also.

  • PDF

Design Considerations for Low Voltage Claw Pole Type Integrated Starter Generator (ISG) Systems

  • Lee, Geun-Ho;Choi, Geo-Seung;Choi, Woong-Chul
    • Journal of Power Electronics
    • /
    • 제11권4호
    • /
    • pp.527-532
    • /
    • 2011
  • Due to the need for improved fuel consumption and the trend towards increasing the electrical content in automobiles, integrated starter generator (ISG) systems are being considered by the automotive industry. In this paper, in order to change the conventional generator of a vehicle, a belt driven integrated starter generator is considered. The overall ISG system, the design considerations for the claw pole type AC electric machine and a low voltage very high current power stage implementation are discussed. Test data on the low voltage claw pole type machine is presented, and a large current voltage source DC/AC inverter suitable for low voltage integrated starter generator operation is also presented. A metal based PCB (Printed Circuit Board) power unit to attach the 4-parallel MOS-FETs is used to achieve extremely high current capability. Furthermore, issues related to the torque assistance during vehicle acceleration and the generation/regeneration characteristics are discussed. A prototype with the capability of up to 1000 A and 27 V is designed and built to validate the kilo-amp inverter.

동축 가속형 파력 발전장치의 전력량 예측을 위한 실험 연구 (An Experimental Study for Predicting the Electric Power of the Coaxial Accelerator Type Wave Power Generator)

  • 정재호;신동민;김윤철;문병영
    • 한국산학기술학회논문지
    • /
    • 제21권2호
    • /
    • pp.19-24
    • /
    • 2020
  • 화석 연료의 고갈로 인해 신재생 에너지에 관한 관심이 증가하고 있다. 특히, 예측가능성이 높고 이용 가능한 양이 풍부한 파력에너지 (Wave Power Energy)에 관한 연구가 활발히 진행되고 있다. 본 연구에 사용된 동축 가속형 파력 발전장치 (Coaxial Accelerator Type Wave Power Generator)는 양방향 선형 운동을 회전력으로 변환함으로써 발전 효율을 향상시킬 수 있도록 설계되었다. 본 연구에서는 해양공학수조에서 파를 생성 한 후, 파주기 및 파고에 따른 케이스 실험을 수행하였다. 실험 연구의 결과는 주파수 응답과 관련된 이론적인 방법을 통해 검증하였으며, 전반적인 경향이 일치하는 것을 확인하였다. 본 연구의 결과는 제작 전 설계 단계에서 파력 발전기의 전력을 예측하고 파력에너지의 효율을 개선하기 위한 매개 변수를 연구하는데 유용할 것으로 예상된다. 또한 제조업체는 본 연구의 결과를 통해 파력 발전기의 파력 에너지 효율을 예측하여 시행착오방지를 통해 개발 시간과 비용을 절감할 수 있을 것으로 기대할 수 있다.

부하변동이 심한 화력발전소의 예상 발전 제어 (Anticipatory Generation Control of Fossil Power Plant for Large and Rapid Recurring Load Fluctuations)

  • 박영문;박종근;김재철;김봉희
    • 대한전기학회논문지
    • /
    • 제35권6호
    • /
    • pp.237-245
    • /
    • 1986
  • 대부분 화력 발전소는 기저부하(base load)운전용으로 설계되어 있어 극심한 부하 변동이 계속되는 부하에 대하여는 일반적으로 적합하지 못하다. 특히 전기로와 압연기가 설치된 제철소에 전력을 공급하는 발전소의 경우 연속적인 심한 부하변동으로 일반적으로 발전소 제어 시스템으로는 적당치 않다. 이 논문에서는 이와 같이 연속적으로 급변하는 부하에 대응할 수 있는 화력 발전소 예상 제어 앨고리즘을 제시 하였다. 상헤한 제어 앨고리즘과 모델 계통에 대한 사례 연구를 첨부하였다.

  • PDF