This paper proposes the method to implement the railroad switching point heating system using the hybrid of the photovoltaic and wind power. The goal of the implementation of the railroad switching point heating system is to prevent freezing of the snow in the winter. The heating system of railway used to supply electricity through photovoltaic and wind power to prevent freezing. Hot wires of the railroad switching point heating system are used about 2kW of electric energy at the day. The electric energy of 2kW used the length of the hot wires about 3m. As the ON and/or OFF mode considering the tracks temperature and the ambient temperature, so the way the use of power-saving effect. In addition, the system can be used the railroad switching point heating system in winter and railway signal and street lights around the track in summer. In experiment, we acquired the power data according to time at the day of photovoltaic and wind power. We confirmed the temperature rise using the heating cable for 3m of $85^{\circ}C$, 30W/m. The temperature rise of the heating cable changes the temperature of $5^{\circ}C$ after 10 minutes and $11^{\circ}C$ after 10 minutes. We have confirmed the possibility of the railroad switching point heating system using the hybrid of the photovoltaic and wind power.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.12
/
pp.1818-1823
/
2015
In this paper, we analyzed the optimal configuration of protection wire that have been installed in the electric railway power supply system. Protection wires are to suppress the ground potential rise when the short circuit fault between contact wire-rail(C-F), and protect the electronics equipments(signalling and communication) that are facility the wayside. The role of protection wires must be feed back quickly the fault current to the substation when a short circuit fault occurs. In this paper, we proposed that only one line to install the protection wire. Comparing how to newly proposed and existing system, most of the performance is similar. The reason is that most of the current flowing in the protection wire near the location where the fault occurred. There is no problem even if in one line for human safe and the low impedance of the return circuit in dimension to ensure the safety of the facility during the fault. To ensure safety during an fault occurs, it is sufficient even by one line. But, In the protection wire of facilities planning it is necessary to design taking into account the potential utility.
The PVC insulated flexible cords are used mainly as power supply cords of electric appliance. This electric wire is a stranded wire consisted of dozens of strands. In case stranded wires are disconnected by mechanical stress, it weakens electrically. Finally, the over current flows through stranded wires, and electrical fire occurs. In this study, we analyzed the melting properties of strands by over current, such as melting process, melting current and melting time. And we analyzed that quantity of heat for melting, a cross sectional structure, and surface structure by optical microscope and SEM. As analysis results, melting time decreased as melting current increased. And quantity of heat for melting was low, too. From the cross sectional structure of melted wire, when a melting current low and melting time long, it was found that the dendrite structure grew. However, the dendrite structure is hard to grow because growing time is not enough when a melting current high and melting time short.
Kim, Ji-Tae;Jang, Jae-Young;Park, Dong-Keun;Chang, Ki-Sung;Kim, Young-Jae;Ko, Tae-Kuk
Progress in Superconductivity and Cryogenics
/
v.10
no.2
/
pp.30-33
/
2008
Several kinds of superconducting fault current limiters (SFCLs), which reduces huge fault current, have been developing by many research groups. The SFCL has no impedance during normal operation, so it dose not give any influence to electric power system. The resistive type SFCL reduces the fault current with the impedance generated in the superconducting part of the SFCL when the fault current exceeds the critical current of SFCL. In this paper, a new type resistive SFCL made of bifilar coil wound with two different high-Tc superconducting (HTS) wires in parallel. Although a bifilar coil has theoretically no inductance, the bifilar coil made in this paper could generate inductance at fault. The specifications of the used two wires were considerably different, thus current distribution between the two HTS wire was different at fault. When the fault current exceeded the critical current of one wire in the bifilar coil, the momentary sharp increase of impedance was detected. Base on the results, a new resistive type SFCL can generate not only resistance but also inductance, which can be used to control a fault current in the future.
As the use of capacitors in electrical appliances and electrical control circuits increases, the related electrical fire is increasing. There are various parts such as resistors, coils, and capacitors that make up an electric circuit. Among them, the ignition of a capacitor with a temporary charging function is closely related to the structural characteristics of the capacitor. Capacitors can explode due to various reasons, and the high heat generated when they explode ignites the inflammable dielectric, which in turn burns the inflammable materials such as the surrounding electric wires and spreads into a fire. In this paper, the ignition mechanism is studied by conducting a reenactment experiment on the various probabilities that can be ignited in an electric capacitor, and the prevention measures to be applied to the fire prevention are presented.
Kim Jae-Kwan;Jung Chae-Kyun;Lee Jong-Beom;Cho Han-Goo;Seo Je-Ho
The Transactions of the Korean Institute of Electrical Engineers C
/
v.54
no.6
/
pp.279-285
/
2005
The lightning causes the damage of power system equipments as well as large power failure. Therefore, the insulation design should be established not only to decrease the damage of the facilities itself but also to increase the reliability of electric power system. This paper describes the useful way applying underbuilt ground wire and guy wire in transmission tower that safely protect the substation equipments. One or more shield wires under the phase conductor will not intercept lightning stroke, but they may improve reduce lightning voltages almost as effectively as if they were above the phase conductors. And the guy wires will mitigate the tower surge response. These would not only reduce backflashover possibility but also minimize crest and duration of surges entering the substation. EMTP is used to analyze the efficiency of the proposed methods.
This paper describes the detection method of wire-like obstacles using millimeter-wave radar system. Passive sensor like CCD camera can be used for the detection of high power electric cables on the hills or mountains and it can give very good quality of obstacle target information. But this system is very limited to use by bad weather condition. The detection capability for different diameters of wire targets using millimeter radar system have been accomplished. To simulate the target on the moving helicopter, rotating targets are used with fixed radar system. In the experiment 11mm, 16mm and 22mm diameter of wires have been detected in single, two and three wires in one position. The detected signal from single wire was very clear on gray level image. Three wires placed very closely together could be recognized in range, cross range image plane. For two and three wires, blur effect due to mutual scattering effect is observed.
한전의 가공 송전선로는 2010년 기준으로 약 12,990km(765 kV 송전선로 354 km, 345 kV 송전선로 약 3,868 km, 154 kV 송전선로 8,173 km, 66 kV 송전선로 : 약 595 km)가 설치되어 운전되고 있다. 이러한 송전선로는 평지, 구릉, 산악지 등에 설치됨으로써 자연환경에 크게 영향을 받는다. 특히 전 세계적으로 낙뢰에 의한 송전선로의 트립 고장이 전체 고장의 약 60%를 점유하는 것으로 보고되고 있으며, 낙뢰에 의한 고장을 최소화하기 위한 내뢰 설계를 시행하고 있다. 한전에서도 전압별 계통의 신뢰도와 경제성을 고려하여 765 kV 송전선로의 목표 사고율은 0.35[건/100 km 년], 345 kV 송전선로의 경우는 1.0[건/100 km.년], 154 kV 송전선로의 경우는 2.0[건/100 km 년] 이하의 목표 사고율을 설정하여 설계 운영하고 있다. 그러나 2000년 이후 낙뢰발생 빈도가 증가하고 있으며, 낙뢰에 의한 고장 점유율도 약 75%로서 고품질 전력공급을 위한 내뢰 대책 수립의 검토가 요구되고 있다.
한전의 가공 송전선로는 2010년 기준으로 약 12,990km(765 kV 송전선로 354 km, 345 kV 송전선로 약 3,868 km, 154 kV 송전선로 8,173 km, 66 kV 송전선로 : 약 595 km)가 설치되어 운전되고 있다. 이러한 송전선로는 평지, 구릉, 산악지 등에 설치됨으로써 자연환경에 크게 영향을 받는다. 특히 전 세계적으로 낙뢰에 의한 송전선로의 트립 고장이 전체 고장의 약 60%를 점유하는 것으로 보고되고 있으며, 낙뢰에 의한 고장을 최소화하기 위한 내뢰 설계를 시행하고 있다. 한전에서도 전압별 계통의 신뢰도와 경제성을 고려하여 765 kV 송전선로의 목표 사고율은 0.35[건/100 km 년], 345 kV 송전선로의 경우는 1.0[건/100 km 년], 154 kV 송전선로의 경우는 2.0[건/100 km 년] 이하의 목표 사고율을 설정하여 설계 운영하고 있다. 그러나 2000년 이후 낙뢰 발생 빈도가 증가하고 있으며, 낙뢰에 의한 고장 점유율도 약 75%로서 고품질 전력공급을 위한 내뢰 대책 수립의 검토가 요구되고 있다.
Kim, J.W.;Pack, H.S.;Choi, Y.H.;Choi, M.K.;Kim, S.K.;Kim, J.C.
Proceedings of the KIEE Conference
/
1995.07c
/
pp.1296-1298
/
1995
This paper presents the power cable with the concentric neutral wires of S-Z stranding. This type Cables, 22.9KV CN/CV Cables used in the distribution systems have been developed in order to improve bend, bend after torsion and tension charateristics. We have designed and made S-Z stranding machine, testing equipment etc., and have established the manufacturing technology of the equipment and the testing technology.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.