• Title/Summary/Keyword: Electric Power Lines

Search Result 485, Processing Time 0.03 seconds

Selection of Optimal Location and Size of Distributed Generation Considering Power Loss (전력손실을 고려한 분산전원의 최적 위치 및 용량 선정)

  • Lee, Soo-Hyoung;Park, Jung-Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.551-559
    • /
    • 2008
  • Increase in power consumption can cause a serious stability problem of an electric power system without construction of new power plants or transmission lines. Also, it can generate large power loss of the system. In costly and environmentally effective manner to avoid constructing the new infrastructures such as power plants and transmission lines, etc, the distributed generation(DG) has paid great attentions so far as a solution for the above problem. Selection of optimal location and size of the DG is the necessary process to maintain the stability and reliability of existing system effectively. However, the systematic and cardinal rule for this issue is still open question. In this paper, the method to determine optimal location of the DG is proposed by considering power loss when the DG is connected to an electric power grid. Also, optimal size of not only the corresponding single DG but also the multi-DGs is determined with the proposed systematic approach. The IEEE benchmark 30-bus test system is analyzed to evaluate the feasibility and effectiveness of the proposed method.

Relation between Induced Voltage of Rail and Feeding Line of Wireless Power Transfer System for Railway Application (철도용 무선전력전송시스템의 급전선로와 레일유기전압의 관계)

  • Kim, JaeHee;Park, Chan-Bae;Jung, Shin-Myung;Lee, Seung-Hwan;Lee, Byung-Song;Lee, Jun-Ho;Lee, Su-Gil
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.228-232
    • /
    • 2014
  • The magnetic field generated by the feeding line of a wireless power transfer system induces voltage on the rail of a railway system. The induced voltage of the rail can have a bad influence on the track circuit and on safety. This paper simulated three feeding lines to study the relation between the feeding lines and the induced voltage of the rail; it also proposed magnetic field distribution of the feeding line to reduce the induced voltage.

Automatic Algorithm for Cleaning Asset Data of Overhead Transmission Line (가공송전 전선 자산데이터의 정제 자동화 알고리즘 개발 연구)

  • Mun, Sung-Duk;Kim, Tae-Joon;Kim, Kang-Sik;Hwang, Jae-Sang
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.73-77
    • /
    • 2021
  • As the big data analysis technologies has been developed worldwide, the importance of asset management for electric power facilities based data analysis is increasing. It is essential to secure quality of data that will determine the performance of the RISK evaluation algorithm for asset management. To improve reliability of asset management, asset data must be preprocessed. In particular, the process of cleaning dirty data is required, and it is also urgent to develop an algorithm to reduce time and improve accuracy for data treatment. In this paper, the result of the development of an automatic cleaning algorithm specialized in overhead transmission asset data is presented. A data cleaning algorithm was developed to enable data clean by analyzing quality and overall pattern of raw data.

Multi-Area Economic Dispatch Considering Environmental Emission and Transmission Losses (연계 계통에서의 환경적 배출량과 손실을 고려한 최적 경제급전)

  • Choi, Seung-Jo;Rhee, Sang-Bong;Kim, Kyu-Ho;You, Seok-Ku
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.341-343
    • /
    • 2000
  • Traditionally electric power system are operated in such a way that the total fuel cost is minimized regardless of accounting for tie-lines transmission constraint and emissions produced. But tie-lines transmission and emissions constraint are very important issues in the operation and planning of electric power system. This paper presents the Two-Phase Neural Network(TPNN) to solve the Economic Load Dispatch (ELD) problem with tie-lines transmission and emissions constraint considering transmission losses. The transmission losses are obtained from the B-coefficient which approximate the system losses as s quadratic function of the real power generation. By applying the proposed algorithm to the test system, the usefulness of this algorithm is verified.

  • PDF

Formulas for Predicting Radio Noise from Overhead HVAC Transmission Lines (초고압 가공 송전선로의 라디오 잡음 예측계산식 개발 (I))

  • Yang, Kwang-Ho;Ju, Mun-No;Myung, Sung-Ho;Shin, Koo-Yong;Lee, Dong-Il
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1088-1090
    • /
    • 1999
  • The radio noise produced by corona discharge in high voltage transmission tines is one of the most important line design considerations. Therefore it is necessary to pre-evaluate radio noise for transmission line designers using Prediction formulas or field test results. In this Paper, more accurate and useful formulas for Predicting radio noise during fair and foul weathers in AC transmission lines were proposed through comparison with the existing formulas. Also it was verified by comparing with the long-term measured data from operating lines that the Proposed formulas are very accurate. The Proposed prediction formulas are developed by the applications of nonlinear least square optimization method to radio noise database collected from lines throughout the world.

  • PDF

Electric Fire Prediction by Detection of Discharge Signal (방전신호 검출에 의한 전기화재 예측)

  • 길경석;송재용;권장우
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.2
    • /
    • pp.413-419
    • /
    • 2004
  • This paper describes a technique that can predict electric fires by detection of discharge voltage signals caused by the use of electric facilities. In the experiment, various discharge modes, a flashover or a surface discharge through insulation paper and a line to line short, were simulated to acquire electrical information for predicting electrical fire as discharge modes. From the experimental results, it is hewn that electorial discharges which are ranked as majority causes of electric fires generate characterized signals distinguished from power frequency. Finally. We designed a prototype discharge detector based on the experimental results, and the detector is applied to a power lines. This study showed that the prediction of electric fires is possible by monitoring discharge voltage signals in electric power lines.

Feasibility Study on the Development of $High-T_c$ Superconducting Power Cable System (고온초전도 케이블 시스템 개발에 관한 타당성 조사)

  • Hwang, Si-Dole;Hyun, Ok-Bae;Choi, Hyo-Sang;Kim, Hye-Rim;Kim, Sang-Joon
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.172-174
    • /
    • 2000
  • This paper summarizes the feasibility study of HTS power cables in Korea, including the conceptual design of a 154 kV 1000 MVA class HTS cable system, and the relative economic evaluations between conventional and HTS cable systems in Seoul area. According to the results of the economic evaluations, the HTS cable system can reduce the construction work for 168km of underground transmission lines, saving 700 million USD of construction cost in 2010.

  • PDF

Wireless Power Transfer Technology in On-Line Electric Vehicle

  • Ahn, Seung-Young;Chun, Yang-Bae;Cho, Dong-Ho;Kim, Joung-Ho
    • Journal of electromagnetic engineering and science
    • /
    • v.11 no.3
    • /
    • pp.174-182
    • /
    • 2011
  • The On-line Electric Vehicle (OLEV) is an electric transport system in which the vehicle's power is transferred wirelessly from power lines underneath the surface of the road. Advantages of the OLEV include reducing battery size and cost to about 20 percent of that of conventional battery-powered electric vehicles, thereby minimizing the vehicle's weight and price, as well as the cost of charging the system. In this paper, we introduce a wireless power transfer mechanism to maximize the electrical performance of the power transfer system. Power transfer capacity, power transfer efficiency, and magnitude of leakage in the electromagnetic field (EMF) are analyzed, and the optimization methodology of the design parameters is discussed.

Development of a Technique for Detection of Contact Wire Wear using High-Speed Camera (고속카메라를 이용한 전차선 마모 검측 영상처리 알고리즘 개발)

  • Park, Young;Cho, Yong-Hyeon;Cho, Chul-Jin;Kim, Won-Ha
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.23 no.8
    • /
    • pp.632-637
    • /
    • 2010
  • The measurement of contact wire wear in electric railways is one of the key test parameters to increase speed and maintain safety in electric railways. Wear caused by continuous interaction between pantographs and contact wires has a negative effect on current collection quality and severely damaged contact wires might cause hazardous accidents. This paper introduces a non-contact optical-based contact wire wear measuring system that will replace conventional wear detecting methods conducted by maintenance vehicles or workers. The system is implemented by high-speed cameras that can collect images of contact wires during vehicle operation, a laser used to create images profile of the contact wire surface, and a computer used to process the collected images. The proposed system is designed to assist maintenance of overhead contact lines by creating geometrically plotted images of contact wires to detect contact wire wear during operation on conventional lines or high-speed lines.

Harmonics Measurement of the Running Test EMU Train in Conventional Railway Lines (일반철도선로에서의 전동차 시험운행에 대한 고조파 측정연구)

  • Han, Seong-Ho;Shon, Jin-Geun;Kim, Young-Hoon
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.2
    • /
    • pp.77-83
    • /
    • 2016
  • The electric quality of train is represented by voltage and current harmonics at PT(Ratio 25,000/15/[V]) which is located between pantograph and primary winding of train transformer. In this paper, voltage and current harmonics were measured on the test EMU(electric multiple unit)train with maximum speed of 180km/h in existing railway lines(chungbuk, Taeback, Honam). As a results of test, it is found that the electric quality of train depends on the mostly operation conditions which is accelerating mode and braking mode on each sections. Voltage THD is above all 3[%] and current harmonics is monitored from lowest Harmonic to highest Harmonic in case of accelerating mode. But, highest current harmonics is not monitored in case of breaking mode. The results in this paper can help to stabilize the power device and power converter of the test EMU train.