• Title/Summary/Keyword: Electric IT Equipment

검색결과 611건 처리시간 0.029초

포항가속기연구소의 전력사용량에 대한 분석 (Analysis of used electric power for pohang accelerator laboratory)

  • 손창호;손윤규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 전기설비
    • /
    • pp.31-32
    • /
    • 2006
  • Pohang accelerator Laboratory is from 1994 analyzed electric power amount used for about 10 years. It is one of equipment that consume electric power of greate electric power to single test equipment. Accelerator Laboratory institute investigates the consumption rate of energy that is spent to each building could divide by linear accelerator and save ring and analyzed about the equipment utilization rate and average electric power. Countermeasure that this treatise can forecast power loss of electric power by equipment through analysis of electric power amount used and heighten the utilization rate of equipment wishes to do comparative analysis.

  • PDF

배전계통 적정 신뢰도 유지를 위한 설비교체 순위 평가 (Component Replacement Ordering Evaluation for Proper Reliability Maintenance in Power Distribution System)

  • 이희태;김재철;문종필;추철민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.48-50
    • /
    • 2005
  • New environment change of electric power system focused in consumer's energy supply and demand. But electric power reliability preservation and reliability improvement countermeasure also need for long-term. It is need that change equipments that is composing electric power system in well-timed time and by maintaining, prevent breakdown beforehand and prevent consumer's power interruption by equipment fail. However, as only quantitative estimation is available by reliability estimation method that is presented in existing, it is no to use in dictionary fault prevention. Therefore, applied optimum reliability preservation through existent equipment fault data analysis of electric power system in equipment replace side, and this when maintain equipment replace of electric power system for reliability preservation using responsiveness analysis to base ordering evaluate. In existing about main equipment plain that this paper is power system the valued failure rate use this by score and precedence of electric power system equipment for replace of system considered expense.

  • PDF

대전류 통전시 배전반내의 열적 현상에 관한 연구 (Investigations on the Thermal Phenomena in High Current Electric Switchboard)

  • 이방욱;강종성;손종만;최원준;서정민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 추계학술대회 논문집 학회본부 C
    • /
    • pp.1051-1053
    • /
    • 1999
  • In this work, thermal phenomena and temperature rise due to thermal source in electric switchboard were investigated using analytical measures. Electric switchboards are assemblies of panels on which are mounted switches, circuit breakers, high current busbars, meter, fuses and terminals essential to the operation of electric equipment. It is very difficult to predict the temperature rise in switchboard due to the existence of several heat sources. To overcome this situations, we focused on the eddy current distribution on the panel of switchboard caused by high current busbars as a fundamental basis. And thermal sources including busbar and switchgear have been considered. Furthermore, thermal transfer phenomena in switchboard was considered theoretically. Finally, three-dimensional thermal model for eddy current analysis has been adopted and FEM analysis was conducted. As a result, three-dimensional numerical analysis found to be applicable to the analysis of thermal phenomena in switchboard.

  • PDF

도시철도역사의 저압선로 및 기기에서의 지락사고 방지 방안에 관한 검토 (A Study on ground fault at low voltage line and apparatus in urban railway station)

  • 민경윤;김진호;한학수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.699-704
    • /
    • 2005
  • In the station of the railway and the subway various illumination equipment and a general power equipment for a passenger convenience, the signal equipment and the communication equipment which is necessary to the train operation provided. At the all of like this equipment from the electric room which is established in each station by changing from high voltage to low voltage and it supplies from the illumination transformer, the power transformer and the signal transformer. If it supplies to the equipment from the high voltage to the low voltage, it must be established to contact protection device in between the high voltage coil and the low voltage coil. Also it must do the grounding faulting device at the low voltage lines, the earthing devices at apparatus for the protection of an electric shock and an electric fire by the electric relation law. Compared the related regulations between the facilities which require protective functions such as grounding fault or earthing in public utilities like subway stations, and the facilities which do not require line earthing or protective functions such as electricity supplied for signalling the train. Also, will describe a countermeasure for the accident from a grounding fault.

  • PDF

변전설비 용량기준의 합리화 방안 및 대책에 관한 연구 (A Study on the Reasonable Design Standard and Countermeasures of the Demand Factor)

  • 유현재;하복남;남궁도;박상만;조남훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.902-904
    • /
    • 1996
  • In this paper, we proposed the reasonable design standard and countermeasures of Demand Factor for large office buildings, that was made by the statistical way considering actual conditions, such as investicated electric equipment capacity, electric power consumption, etc. So as to save electric equipment investment, the decrease of power loss, the improvement of facilities utilization and the decrease of electric rates, we can be contributed by the application of the design standard. The result of saving effect is showed to confirm the practical use of the proposed Demand Factor, and also, it is believed that this proposed Demand Factor will be useful in electric equipment operation and planning.

  • PDF

안전성 확보를 위한 전기안전관리기준의 재설정에 관한 연구 (A Study on the Reconfiguration in the Regulation of Electric Safety Management for the Guarantee of Safety)

  • 정재희
    • 한국안전학회지
    • /
    • 제24권6호
    • /
    • pp.45-49
    • /
    • 2009
  • This study is to prepare a reasonable basis for the improvement of the electrical safety management regulation. The standards in domestic and foreign countries for the application of new and renewable energy facilities and other devices are analyzed. Other regulations excluding the electrical safety fields and wide surveys are also carried out. Consequently, it is asked that the classification between normal and self electrical facilities should be clear and deregulation for small businesses has to be followed. This study is showed that standards investigates of receiving equipment below 600V above 75kW, eletrical safety manager employment of manufacturing industry and Mid-night electric power. And, it is showed that consignment permission and Consignment inspection periodic relaxation about wind development equipment below 1,000kW, consignment of Technical Development equipment for new and renewable energy below 250kW.

전기자동차 충전스탠드의 제어파일럿 신호를 이용한 대역 내 통신 방식 (Inband Signaling on the Control Pilot of Electric Vehicle Supply Equipment)

  • 김철우;김상범;임유석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.2019-2020
    • /
    • 2011
  • Electric Vehicle Supply Equipment(EVSE) is a system or an equipment to supply electric power for charging the traction batteries on the electric vehicle. Control Pilot is an electric signal generated by EVSE and is transmitted to the electric vehicle by a vehicle coupler and a contact. The duty cycle of control pilot determines the maximum current to be drawn by electric vehicle. When the duty cycle is 5%, it is indicated that digital communication is needed. This paper deals with the data format and definition about communication scheduling through the inband signal on the control pilot of EVSE.

  • PDF

고주파 가열 장비를 활용한 터빈로터 휨 교정수식모델 개발 (Development of Turbine Rotor Bending Straightening Numerical Model using the High Frequency Heating Equipment)

  • 박준수;현중섭;박현구;박광하
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권2호
    • /
    • pp.269-275
    • /
    • 2021
  • The turbine rotor, one of the main facilities in a power plant, it generates electricity while rotating at 3600 RPM. Because it rotates at high speed, it requires careful management because high vibration occurs even if it is deformed by only 0.1mm. However, bending occurs due to various causes during turbine operating. If turbine rotor bending occurs, the power plant must be stopped and repaired. In the past, straightening was carried out using a heating torch and furnace in the field. In case of straightening in this way, it is impossible to proceed systematically, so damage to the turbine rotor may occur and take long period for maintenance. Long maintenance period causes excessive cost, so it is necessary to straighten the rotor by minimizing damage to the rotor in a short period of time. To solve this problem, we developed a turbine rotor straightening equipment using high-frequency induction heating equipment. A straightening was validated for 500MW HIP rotor, and the optimal parameters for straightening were selected. In addition, based on the experimental results, finite element analysis was performed to build a database. Using the database, a straightening amount prediction model available for rotor straightening was developed. Using the developed straightening equipment and straightening prediction model, it is possible to straightening the rotor with minimized damage to the rotor in a short period of time.

냉방기기 사용량과 특성을 고려한 가스냉방기기의 전력대체 효과 분석 (Analysis of Electric Substitution Effects by the Gas Consumption and Characteristics of Gas Cooling System)

  • 박래준;송경빈
    • 전기학회논문지
    • /
    • 제61권5호
    • /
    • pp.669-675
    • /
    • 2012
  • Recently, the amount of electrical heat pump(EHP), a electrical conditioning equipment, is sharply increasing due to the luxury and multi-story trend of building. Accordingly, the cooling load that occupying substantial part of summer electric consumption has increased dramatically, making difficulties in domestic supply of electricity in summer. There are some efforts to replace it with an alternative cooling equipment such as gas heat pump(GHP), a gas cooling equipment, in order to solve the problem of summer electricity supply through reducing the summer electricity peak. It is rare, however, to find studies on the actual effects of GHP on the reduction of summer electricity peak. This study, therefore, estimated the effects of the GHP on the summer electricity peak by the gas consumption and characteristics of gas cooling systems. In addition, electric substitution effects by gas cooling systems were analyzed through case studies in the summer of 2010.

분수대에서의 전기설비 고장에 대한 누전 감지 장치 개발 (Development of Leakage Detector for Electric Equipment Failure in Fountain)

  • 김두현;김성철;박종영
    • 한국안전학회지
    • /
    • 제33권1호
    • /
    • pp.35-40
    • /
    • 2018
  • This research aimed to develop an leakage detector of analyzing the electric potential generated from the electric leakage of electric equipment of the fountain. To accomplish this goal, the potential gradient was analyzed against path 1 ~ path 4; this was done by taking the lighting of a fountain as the electric leakage point based on code analyses in Korea and other countries. Lighting 1 was taken as the electric leakage point, and the earthing point was set against lightings(2~3). It appeared that the allowable touch voltage against the 1 type(under 2.5 V) exceeded 60.0%. Therefore, the lighting of fountain turned out to be the most dangerous point, and electric shock could be formed by the electric leakage of electric equipment in underwater as well as by the lighting. An leakage detector was developed based on this risk; this detector is capable of analyzing the electric potential of a electric equipments of the fountain in underwater. Then, a verification test was carried out. This leakage detector can be used to measure electric potential in various submerged areas such as swimming pools, flooded spaces, and fountains.