• Title/Summary/Keyword: Earthwork analysis

Search Result 80, Processing Time 0.028 seconds

Study of the Behavior of Concrete Slab Track on Earthwork According to the Variation of Train Axle Load and Speed (열차하중, 속도변화에 따른 토공상 콘크리트 슬래브궤도의 거동특성연구)

  • Chun, Hee-Kwang;Kang, Yun-Suk;Park, Yong-Gul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.6788-6798
    • /
    • 2015
  • In recent high speed rail way, the operating speed of train is enhanced and the introduction of EMU train vehicles is increased. In addition, as expected the demand of the concrete slab track and the trend of design cross-section reduction, the clear behavior of evaluation of internal slab layer is demanded about the variation of design load and speed. The purpose of this study is to evaluate and identify the mechanical behavior pattern of concrete slab track and track-road bed with the variation of axle load and train speed. To this end, the behavior of TCL and HSB was evaluated in according to the variation of axle load and speed. And the analysis results and the data measured TCL strain sensor, which was embedded in TCL slab under installation on Honam high speed railway, was analyzed. The analysis result shows that the strain are increasing in according to the speed-up of train, and line regression was obtained from measured data. Analysis data of the state of bonding condition of slab layer and measured data was analyzed. It is conducted that the TCL layer stress of HEMU 430X, which of axle load, is lighter was similar to the stress of KTX-Honam, the standard deviation of measured stress is dramatically increased.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Application of the EIASS for Assessing Changes in Terrain Features in Development Initiatives: A Case Study in South Korea (환경영향평가정보지원시스템(EIASS)을 활용한 국내 주요 개발사업의 지형변화 검토)

  • Sujung Heo;Dong Kun Lee;Eunsub Kim
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.6
    • /
    • pp.407-418
    • /
    • 2023
  • This study conducted an analysis of terrain change indicators in major development projects in Korea, examining the correlation between terrain change indicators to derive foundational terrain change metrics based on different land use and slope types. The aim is to contribute to sustainable development by enhancing the efficiency of land utilization and landscaping, while minimizing environmental impacts in future development endeavors. Additionally, to apply the research findings in practical contexts, domestic regulations related to terrain were surveyed, and the compatibility and usability between these regulations and research analysis results were discussed. Based on this, the study seeks to explore strategies for more accurate and useful utilization of terrain change indicators in future research. As a result, in the tourism development, terrain changes predominantly occur in the order of flat land, hillly land, and mountain land, with the analysis indicating higher terrain changes in undulating hilly and mountainous lands compared to flat land. Furthermore, in industrial complex development, very steep (20°-30°) and extreme (30°-40°) slopes; in urban development projects, steep slope (15°-20°); in athletic service facility and tourist development, steep (15°-20°) and very steep (20°-30°) exhibit higher average terrain change indicators compared to other slope categories. The findings of our study can contribute to the formulation of strategies aimed at minimizing terrain disturbance in future domestic development projects and serve as foundational data for environmental impact assessments.

Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project (4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안)

  • Kim, Hyeon-Seoug;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.269-278
    • /
    • 2018
  • In Korea, BIM technology is applied mainly to building construction projects, but is expected to be applied rapidly to civil engineering projects because the government is currently considering the mandatory application of BIM for infrastructure facilities. Because the infrastructure project is processed in a horizontal work area, the application of BIM technology is more useful in the schedule management of the construction phase than the interference management of the design phase. The 4D CAD system is a typical BIM technology applied to the schedule management in the construction phase, but the application to the actual project is limited due to the lack of practical functions. This study examined the functions of four representative 4D CAD systems commercialized so that the selection criterion can be provided according to the characteristics of the project, and suggests that the functions that should be improved to have practicability. As a result of functional analysis, the application characteristics of each system were analyzed and the user convenience was suggested. In addition, a linear 4D simulation methodology was developed to improve the functions applicable to civil engineering projects, and ways to improve the utilization of the infrastructure projects as the construction phase BIM were suggested. In railway and road construction projects, most activities, such as earthwork, bridges, and tunnels proceed along the distance axis in a horizontal space. Therefore, a linear 4D simulation method, in which an activity is expressed along a distance axis, can be more practically useful rather than a simple 4D simulation method with a Gantt chart.

A Study on the Selection of Borrow Pits by Using VE Techniques (VE 기법을 이용한 토취장 선정에 관한 연구)

  • Kim, Seung-Ki;Lee, Byung-Suk;Yang, Jae-Hyouk;Lee, Jong-Cheon;Kim, Chan-kee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.1
    • /
    • pp.59-70
    • /
    • 2016
  • The purpose of this study is to review that the VE techniques can be used as a selection tool of borrow pit locations. The analysis of the soil investigation report is performed for the selection of proposed borrow pit site on a large-scale residential development area. Possible earthwork volume of mining is estimated and the weighting matrix evaluation is applied to the VE techniques. After determining the evaluation items for VE assessment, important degree was calculated. The Rating and evaluation of performance is carried out on a proposed borrow pit site. And, development priority has to be decided for a proposed borrow pit sites. As a result, the relative construction cost is closely related to the haulage distance. As the haulage distance increases, the relative construction cost will be increased. Therefore, it was confirmed quantitatively that haulage distance has a significant impact on the select of borrow pits. Also, it was found that the condition of borrow pits itself is important, but it cannot be ignored the impact of the life cycle cost for the selection of optimal borrow pit sites.

Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field- (BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로-)

  • Seo, Myoung-Bae;Ju, Ki-Beom;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.441-450
    • /
    • 2013
  • With the recent increase in BIM orders in civil engineering, project owners are supplied with BIM-based products. Due to the lack of related guidelines, however, and the vague regulations on the creation and level of drawings as well as on the products list, many owners receive BIM-based products along with the existing 2D products. This can lead to task overlapping by designers or contractors and can cause the owners to have more data to maintain. If the existing 2D-based electronic supply system is changed to a BIM ordering system to reduce such a burden, it is necessary to examine the 2D products that can be extracted from or substituted for the BIM model so as to minimize the overlapping products. Therefore, in this study, BIM modeling of road construction projects whose enforcement plan by the Ministry of Land and Transportation has been completed was conducted, and based on the study results, the possibility of extracting 2D drawings from a total of 3,767 drawing items was determined. The results showed that 2,549 drawing items (67%) could be extracted as 2D drawings from the BIM model, and in particular, drawing items related to general connection work, earthwork, and amenities work could be most effectively substituted. The results of this study can be used as the base data for reducing the number of 2D drawings or substituting them in developing a BIM-based product supply system in the future.

Comparative Analysis of Construction Productivity for Modernized Korean Housing (Hanok) (보급형 신한옥 개발을 위한 건설 생산성 분석)

  • Kim, Min;Kim, Yesol;Lee, YunSub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.107-114
    • /
    • 2013
  • The interest in traditional Korean housing has greatly increasing in Korean housing market. However, it is difficult to wildly disseminate for a high construction cost reason. In order to effectively facilitate the Hanok construction, Korean government has initiated a project that develops a new style Korean housing, which meets the requirements of low cost and modernized life style. Cost of building is mainly affected by materials and construction methods. Hanok has some special commodities those significantly impact the cost. In order to effectively cut down the costs, well-organized planning for costs is very important. Also, improving the productivity by utilizing new materials and methods can result in cost down. In this context, this paper compared and analyzed two different types of Korean housing; one is a modernized Korean house which used new materials and methods, the other is a traditional Korean house which was build up by purely traditional methods. Productivity has also been compared and analyzed for 5 major commodities between two types of models. Based on these comparative data, effect of cost down by new model has been analyzed. As a result it is confirmed that by using the new materials and methods could highly effect to increasing productivity and cost down. Especially, the cost of Roofing have been more influenced by using new material while the Wood and Finishes have been influenced by new construction method. Construction cost of Foundation (Earthwork, Concrete, Masonry) and Openings were influenced both factors, changing of materials and methods.

Evaluation of Compaction Quality Control applied the Dynamic Cone Penetrometer Test based on IoT (다짐품질관리를 위한 IoT 기반 DCPT 적용 평가)

  • Jisun, Kim;Jinyoung, Kim;Namgyu, Kim;Sungha, Baek;Jinwoo, Cho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.4
    • /
    • pp.1-12
    • /
    • 2022
  • Generally, the plate load test and the field density test are conducted for compaction quality control in earthwork, and then additional analysis. Recently developed that the DCPT (Dynamic Cone Penetration Test) equipment for smart compaction quality control its the system are able to get location and real-time information about worker history management. The IoT-based the DCPT system improved the time-cost in the field compared traditional test, and the functions recording and storage of the DPI (Dynamic Cone Penetration Index) were automated. This paper describes using these DCPT equipment on in-situ and compared to the standards of the DCPT, and the compaction trend had be confirmed with DPI as the field test data. As a result, the DPI of the final compaction decreased by 1.4 times compared to the initial compaction, confirming the increase in the compaction strength of the subgrade compaction layer 10 to 14 cm deep from the surface. A trend of increasing compaction strength was observed. This showed a tendency to increase the compaction strength of the target DPI proposed by MnDOT and the results of the existing plate load test, but there was a difference in the increase rate. Therefore, additional studies are needed on domestic compaction materials and laboratory conditions for target DPI and correlation studies with the plate load tests. If this is reflected, it is suggested that DCPT will be widely used as smart construction equipment in earthworks.

A Study on Risk Factor Identification by Specialty Construction Industry Sector through Construction Accident Cases : Focused on the Insurance Data of Specialty Construction Worker (건설재해사례 분석에 의한 전문건설업종별 위험요인 탐색 : 전문건설업 근로자 공제자료를 중심으로)

  • Lee, Young Jai;Kang, Seong Kyung;Yu, Hwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.24 no.1
    • /
    • pp.45-63
    • /
    • 2019
  • The number of domestic construction company is expanding every year while the construction workers' exposure to disaster risk is increasing due to technological advancements and popularity of high-rise buildings. In particular, the industry faces greater fatalities and severe large scale accidents because of construction industry characteristics including influx of foreign workers with different language and culture, large number of aged workers, outsourcing, high place work, heavy machine construction. The construction industry is labor-intensive, which is to be completed under given timeline and consists of unique working environment with a lot of night shifts. In addition, when a fixed construction budget is not secured, there is less investment in safety management resulting in poor risk management at the construction site. Taking account that the construction industry has higher accident risk rate and fatality rate, risky and unique working environment, and various labor pool from foreign to aged workers, preemptive safety management through risk factor identification is a mandatory requirement for the construction industry and site. The study analyzes about 8,500 cases of construction accidents that occurred over the past 10 years and identified risk factor by construction industry sector to secure a systematic insight for risk management. Based on interrelation analysis between accident types, work types, original cause materials and assailing materials, there is correlation between each analysis factor and work industry. Especially for work types, there is great correlation between work tasks and industry type. For reinforced concrete and earthwork are among the most frequent types of accidents, and they are not only high in frequency of accidents, but also have a high risk in categories of occurrence.

Development of Forest Road Network Model Using Digital Terrain Model (수치지형(數値地形)모델을 이용(利用)한 임도망(林道網) 배치(配置)모델의 개발(開發))

  • Lee, Jun Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.81 no.4
    • /
    • pp.363-371
    • /
    • 1992
  • This study was aimed at developing a computer model to determine rational road networks in mountainous forests. The computer model is composed of two major subroutines for digital terrain analyses and route selection. The digital terrain model(DTM) provides various information on topographic and vegetative characteristics of forest stands. The DTM also evaluates the effectiveness of road construction based on slope gradients. Using the results of digital terrain analyses, the route selection subroutine, heuristically, determines the optimal road layout satisfying the predefined road densities. The route selection subroutine uses the area-partitioning method in order to fully of roads. This method leads to unbiased road layouts in forest areas. The size of the unit partitiones area can be calculated as a function of the predefined road density. In addition, the user-defined road density of the area-partitioning method provides flexibility in applying the model to real situations. The rational road network can be easily achived for varying road densities, which would be an essential element for network design of forest roads. The optimality conditions are evaluated in conjuction with longitudinal gradients, investment efficiency earthwork quantity or the mixed criteria of these three. The performance of the model was measured and, then, compared with those of conventional ones in terns of average skidding distance, accessibility of stands, development index and circulated road network index. The results of the performance analysis indicate that selection of roading routes for network design using the digital terrain analysis and the area-partitioning method improves performance of the network design medel.

  • PDF