• Title/Summary/Keyword: Earthwork analysis

Search Result 80, Processing Time 0.024 seconds

Performance Effectiveness Case Study of the Machine Guidance System for Dozer Eartwrok Grading Work (도저 정지작업 시 머신 가이던스 시스템 적용에 따른 토공성과 향상 사례분석)

  • Moon, Sungwoo;Kim, Sangtae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.78-86
    • /
    • 2020
  • Dozer is an expensive construction equipment and has a significant performance impact on earthwork performance. A machine guidance system has been applied to dozer equipment as a solution that can improve the performance. The system can provide earthwork-related information to equipment operators so that earthworks can be carried out with minimum support from surveyors. Construction Equipment Machine guidance has the function of supporting earthwork according to an earthwork plan by providing excavation-related information to machine operators. The objective of this study is to evaluate the performance improvement of a machine guidance system for an dozer earthwork operation, and to compare the machine guidance method with the traditional method. The performance has been evaluated in two folds: 1) productivity and 2) accuracy. The productivity shows the quantity of earthwork for a given unit time. The accuracy shows the deviation of grading level from the designed level on the construction drawing for earthwork. The machine guidance system has been applied to a testing bed in a construction site. Data comparison analysis showed that the earth earthwork had 46.59% improvement in productivity as well as 46.96% improvement in accuracy, and is expected to provide a tool for applying smart constrction to the earthwork operation.

Experimental and Analysis Study on Transition Area Between Bridge and Earthwork (교량, 토공 접속구간 궤도동적계측 및 해석에 관한 연구)

  • 강윤석;나성훈;신정렬;양신추
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.250-255
    • /
    • 2002
  • The transition between bridge and earthwork often causes the problems of maintenance. The damages of the track on the transition area influence running safety of train and serviceability, increase the maintenance cost. Therefore it is very important to evaluate the dynamic responses of transition and take a efficient measure. In order to evaluate the dynamic behavior of track, the field estimations are performed at the transition area of a conventional line between bridge and earthwork. And the track system on the transition area numerically analyzed to evaluate the dynamic behavior of damaged track with void sleeper. The measured values and Analysis results such as wheel contact force, rail stress, displacement acceleration and track irregularity in the transition area show the dynamic forces are severe. So it is recommended that the transition area should be improved the rigidity by reinforcing the rail.

  • PDF

Dynamic Behavior on Transition Zone of the Railway Bridge-earthwork by Shape of Transition Zone (구조물 접속부 형상에 따른 철도 교량-토공 접속부의 동적거동)

  • Jung, Kwangsu;Ahn, Kwangkuk;Kang, Hongsig
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.4
    • /
    • pp.5-13
    • /
    • 2021
  • The transition is the zone where support stiffness suddenly increases in the railway industry. If the support stiffness increases, differential settlement will occur at the transition due to difference of stiffness, and the differential settlement causes problems for the train running safety and the roadbed that supports the track. In particular, a study on differential settlement at bridge-earthwork transition was only conducted to considering railway load in most cases. However, these studies have not taken account of earthquake despite earthquake has been occurred frequently in the recent, and it is necessary to consider earthquake. Therefore, in this study numerical analysis has been performed by changing the inclination of approach block, which determines the shape of the transition, and earthwork in order to verify the effect of the shape of the transition on the dynamic behavior at the bridge-earthwork transition. The result shows that the dynamic behavior at the bridge-earthwork transition was affected by the shape of transition.

A Study on the Supportive Stiffness in Transitional Zones through Moving Load-Based Three-Dimensional Modeling (이동하중과 3차원 모델링을 통한 접속부 지지강성연구)

  • Woo, Hyeun-Joon;Lee, Seung-Ju;Kang, Yun-Suk;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1542-1549
    • /
    • 2011
  • The Transitional zone between bridge abutment and earthwork is one of the representative vulnerable zones in railway where differential settlements may take place due to the different supportive stiffness. Although transitional zones are managed with stricter standards than those of the other earthwork zones either in the design and construction stages, it is very difficult to prevent differential settlement perfectly. A three-dimensional numerical analyses were performed by applying train moving load in this study. The analytical model including abutments and earthwork zones was constituted with rail, sleepers, track concrete layer (TCL), hydraulic stabilized base (HSB), reinforced road bed, and road bed using railway and road base structure. The clamp connecting the rail and sleeper were also modeled as the element with spring coefficient. The train wheel is modeled in the actual size and moved on the rail with 300 km/hr speed. The deformation characteristics at each point of the rail and the ground were considered in detail when moving the train wheel. The analysis results were compared with those from the two-dimensional analysis without considering moving load. The research results show that displacement and stress were greater in the three-dimensional analysis than in other analyses, and the three-dimensional analysis with moving load should be performed to evaluate railway performance.

  • PDF

Impact Variables of Dump Truck Cycle Time for Heavy Excavation Construction Projects

  • Song, Siyuan;Marks, Eric;Pradhananga, Nipesh
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.11-18
    • /
    • 2017
  • The cycle time of construction equipment for earthwork operations has a significant impact on project productivity. Elements that directly impact a haul vehicle's cycle time must be identified in order to accurately quantify the haul cycle time and implement strategies to decrease it. The objective of this research is to scientifically identify and quantify variables that have a significant impact on the cycle time of a dump truck used for earthwork. Real-time location data collected by GPS devices deployed in an active earthwork moving construction site was analyzed using statistical regression. External data including environmental components and haul road conditions were also collected periodically throughout the study duration. Several statistical analyses including a variance analysis and regression analysis were completed on the dump truck location data. Collected data was categorized by stage of the dump truck cycle. Results indicate that a dump truck's enter idle time, exit idle time, moving speed and driver visibility can significantly impact the dump truck cycle time. The contribution of this research is the identification and analysis of statistically significant correlations of variables within the cycle time.

System Improvement for Application and Diffusion of Earthwork Surveying Automation Technology (토공측량 자동화 기술의 적용 활성화를 위한 제도개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.6
    • /
    • pp.303-313
    • /
    • 2018
  • The purpose of this study is digitalization of earthwork such as development of 3D terrain analysis platform using latest technologies including unmanned aerial vehicle and terrestrial laser scanner to ultimately achieve earthwork automation. It is necessary to develop related element technologies and to establish regulations so that it can be applied to the domestic construction projects. As a result of pilot project about the earthwork surveying automation technology, it was confirmed that information such as terrain coordinates, soil, boring, and excavation volume is acquired smoothly. In this paper, we investigate related regulations and manuals in Japan and propose the improvement plan of domestic regulation. We plan to study regulations from early to final construction stage, combine with the 'regulation for public surveying', and improve the regulations in detail.

A Study on the Earthwork Calculation Using Photogrammetry (사진측량을 이용한 토공량 결정에 관한 연구)

  • 유복모;유용택;이변직
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.8 no.1
    • /
    • pp.41-50
    • /
    • 1990
  • The purpose of this thesis lies in proving the practicality of photogrammetry and in promoting photogrammetry in earthwork which plays a major role in civil engineering projects. Analysis of accuracy in the determination of ammount of earthework was done by applying interpolation methods in digital terrain model. As a result of analysis of the data acquisition method, in cross-section method produced acceptable accuracy from Simpson's three-eighths rule and prismoidal rule. In results DTM, we have obtained the fact that earthwork calculation accuracy was increased by applying two or more interpolation methods. Therefore, the method by digital terrain model using aerial photograph has proved to be more efficient.

  • PDF

MMS Accuracy Analysis for Earthwork Site Application (토공현장 적용성 검증을 위한 MMS 정밀도 분석)

  • Park, Jae-woo;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.2
    • /
    • pp.183-189
    • /
    • 2019
  • Researches utilizing the fourth industrial revolution technology are being conducted as a breakthrough for improving the earthworker productivity. In order to make the earthwork site smarter, it is necessary to digitize the construction site topography at first. For this purpose, photogrammetry using drones and LiDAR on MMS have been recently used. The purpose of this study is to analyze the accuracy of LiDAR by installation angles for verifying the application of MMS in the construction site. As a result of comparing the coordinates measured by the total station and the LiDAR, a small error of about 1-2 centimeters was shown. It is confirmed that MMS could be well applied to the earthwork site. In addition, there was no significant difference in the accuracy of the acquired coordinates according to the installation angle of the LiDAR, but the shape of the point clouds was different. The larger the installation angle, the better the shape of the site terrain is measured.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

Evaluation of Deformation Characteristics for Bridge/Earthwork Transition Reinforcement Methods Considering Moving Load (이동하중을 고려한 교량/토공 접속부 보강방안별 변형특성 평가)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Kang, Tae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.3
    • /
    • pp.298-303
    • /
    • 2010
  • The transition zone of the railway is the section which roadbed stiffness is suddenly varied like as tunnel-earthwork, bridge-earthwork and concrete track-ballasted track. There are about 450 tunnel-bridge transition sections on Kyungbu high-speed railway line. It is very important to pay careful attention to construction of these transition zones, in order to secure the train running safety. So, we developed a finite element model of the moving wheel loading to simulate the behavior of bridge-earthwork transitions in this paper. The most distinctive characteristics of the model proposed is to simulate the real wheel behavior on rail. And the main analysis object is to evaluate and compare the deformation characteristics of the transition zone according to the reinforcement methods and length of transition zone which is adopted to high-speed railway. Based on the analysis results, we assessed the effect of the reinforcements on the transition zone of high-speed railway.