An Experiment of Consolidation Behavior for Partly and Fully Penetrated SCP Ground

  • Jung, Jong-Bum;Moriwaki, Takeo;Lee, Kang-Il;Kang, Kwon-Su;Park, Byong-Kee
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.3
    • /
    • pp.3-16
    • /
    • 1999
  • A series of model tests was conducted to investigate the one-dimensional consolidation behavior of an improved ground where sand compaction piles(SCP) were either fully or partly installed in the model clay ground. In order to check the one-dimensional consolidation settlement and stress concentration ratios, earth pressure, pore pressure transducers and dial gauges were installed in the model clay ground. The test results revealed that the consolidation settlement of the partly penetrated SCP ground was larger than that of the fully penetrated SCP ground, and the stress concentration ratios (m) of the fully penetrated SCP ground were higher than these of the partly penetrated SCP ground. The stress concentration ratio was decreasing with the increase in the penetration depth of SCP.

  • PDF

An Experimental Study on the Estimation of Optimum Length of Soil Flow Protector with Wall Stiffness (벽체 강성에 따른 토사유입차단판의 최적 길이 산정에 관한 실험적 연구)

  • Yoo, Jae-Won;Seo, Min-Su;Son, Su-Won;Im, Jong-Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.789-799
    • /
    • 2019
  • The settlement hardly occurs in structures supported by pile foundation such as abutment, culvert but a cavity is formed in the lower part of a structure. As a result, soil discharged from the lateral ground to the cavity accelerates the settlement of the lateral ground of the structure, resulting in a larger settlement. Therefore, in order to prevent problems caused by cavity under the structure supported by pile foundation, soil Flow Protector (briefly called 'FLP'), which can be easily installed on the side of structure, was developed. In this study, an laboratory model test was carried out to prove the reduction effect of settlement and to estimate the optimal installation length of the FLP. As a result, the installation of the FLP reduced the settlement of the lateral ground and prevented the leakage of lateral ground soil into the cavity. If the stiffness of the FLP is small, the state or active earth pressure is generated in the upper part, which is not favorable for stability. But if the stiffness of the FLP is high enough, the passive earth pressure area is generated in the upper part, which will be advantageous for the stability. Also, the increased installation length of FLP is effective to reduce the settlement. And the ratio of the optimal length of the FLP to the box structure height (H = 250 mm) are flexible FLP 1.38, stiff FLP 0.73.

Axial Behavior of Non-Displacement Tapered Piles in Sand (모래지반에서 비배토 테이퍼말뚝의 연직거동 특성)

  • Paik, Kyu-Ho;Lee, Jun-Hwan;Kim, Dae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.35-45
    • /
    • 2007
  • It is known that the response of piles is affected by the shape of pile as well as soil conditions. In order to investigate the characteristics of the axial responses and bearing capacities of non-displacement tapered and cylindrical piles in sands, 12 model pile load tests using a calibration chamber were conducted on model tapered and cylindrical piles, which were specially manufactured to measure the base and shaft load capacities independently. Results of the model tests showed that the shaft load of tapered piles continuously increased with pile settlement, whereas the shaft load of cylindrical piles reached ultimate values at a settlement equal to 4% of pile diameter. Therefore, taper piles have greater shaft loads than cylindrical one at the same settlement. It is also observed that the total load capacity of tapered piles is lower than cylindrical piles for dense sand but is greater than that of cylindrical piles for medium sand. The ultimate unit base resistance of tapered piles was greater than that of cylindrical piles for lateral earth pressure ratio greater than 0.4, and the shaft resistance was greater than that of cylindrical piles irrespective of lateral earth pressure ratio.

Estimation of surface nitrogen dioxide mixing ratio in Seoul using the OMI satellite data (OMI 위성자료를 활용한 서울 지표 이산화질소 혼합비 추정 연구)

  • Kim, Daewon;Hong, Hyunkee;Choi, Wonei;Park, Junsung;Yang, Jiwon;Ryu, Jaeyong;Lee, Hanlim
    • Korean Journal of Remote Sensing
    • /
    • v.33 no.2
    • /
    • pp.135-147
    • /
    • 2017
  • We, for the first time, estimated daily and monthly surface nitrogen dioxide ($NO_2$) volume mixing ratio (VMR) using three regression models with $NO_2$ tropospheric vertical column density (OMIT-rop $NO_2$ VCD) data obtained from Ozone Monitoring Instrument (OMI) in Seoul in South Korea at OMI overpass time (13:45 local time). First linear regression model (M1) is a linear regression equation between OMI-Trop $NO_2$ VCD and in situ $NO_2$ VMR, whereas second linear regression model (M2) incorporates boundary layer height (BLH), temperature, and pressure obtained from Atmospheric Infrared Sounder (AIRS) and OMI-Trop $NO_2$ VCD. Last models (M3M & M3D) are a multiple linear regression equations which include OMI-Trop $NO_2$ VCD, BLH and various meteorological data. In this study, we determined three types of regression models for the training period between 2009 and 2011, and the performance of those regression models was evaluated via comparison with the surface $NO_2$ VMR data obtained from in situ measurements (in situ $NO_2$ VMR) in 2012. The monthly mean surface $NO_2$ VMRs estimated by M3M showed good agreements with those of in situ measurements(avg. R = 0.77). In terms of the daily (13:45LT) $NO_2$ estimation, the highest correlations were found between the daily surface $NO_2$ VMRs estimated by M3D and in-situ $NO_2$ VMRs (avg. R = 0.55). The estimated surface $NO_2$ VMRs by three modelstend to be underestimated. We also discussed the performance of these empirical modelsfor surface $NO_2$ VMR estimation with respect to otherstatistical data such asroot mean square error (RMSE), mean bias, mean absolute error (MAE), and percent difference. This present study shows a possibility of estimating surface $NO_2$ VMR using the satellite measurement.

A Study on Management of Seafood Wastewater Treatment Facility using Submerged MBR (침지식 MBR을 이용한 수산물 폐수처리장 운영에 관한 연구)

  • Choi, Yong-Bum;Lee, Hae-Seung;Han, Dong-Joon;Kwon, Jae-Hyouk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7227-7236
    • /
    • 2015
  • The survey revealed that, due to the discharge characteristics of seafood wastewater, irregular inflow loads were caused, making it difficult to treat the wastewater safely. It is crucial for the operation of pressure and floating tanks for the treatment of high-concentration organic wastewater such as seafood wastewater. The survey of operation factors for the pressure and floating tanks revealed this: A/S ratio 0.05 (design criteria 0.01), the pressurized air pressure 8bar(design criteria 6bar), the pressure tank pressure 6bar (design criteria 4.5bar), and HRT 60sec(design criteria: 10sec). Also, the recirculation rate was changed to over 40%(design criteria: 30%), and the surface load rate was changed to under $13.7m^3/m^2{\cdot}hr$(design criteria: under $17.7m^3/m^2{\cdot}hr$); thus, compared to the initial design criteria, the operation factors were changed according to inflow characteristics, thus enhancing the pressure and floating tank performance. The survey of inflow load revealed BOD 140.7%, $COD_{Mn}$ 120.32%, and SS 106.3%, compared to the inflow design criteria, as well as T-N 135.5% and T-P173.3%, higher than the design criteria. The survey of the treatment facility annual operation cost revealed high portions in sludge treatment cost(27.7%) and chemicals costs(26.0%), and the sludge treatment cost will likely further increase due to the ban on ocean dumping. The unit cost for the treatment of seafood wastewater was found to be KRW 3,858 per ton, more than 27 times higher than the sewage treatment cost(KRW 142.6/ton), presumably because the seafood wastewater contains high-concentration organic substances and nutritive salts.

Effective Porosity Variation of Cement Samples According to Vacuum Pressure and Time (진공의 압력과 시간을 달리할 때 시멘트시험편의 유효공극률 변화)

  • Lee, Sang Kyu;Lee, Tae Jong;Kim, Hyoung Chan
    • Geophysics and Geophysical Exploration
    • /
    • v.15 no.4
    • /
    • pp.163-176
    • /
    • 2012
  • Effective porosity has been measured for cement specimen as a function of vacuum time and pressure in the vacuum saturation process. Six cement specimen are used; three of them are made of the same ratio of cement and sand, the other three are 100% cement mortar, of which average porosity is about 25% and 40%, respectively. Using the 6 samples, measured effective porosities are compared and examined with 5 different vacuum pressures (2, 4, 6, 8, 10 torr) and times (20, 40, 60, 80, 100 minute), respectively. Comparing measured effective porosity from experiments when vacuum time varies from 100 minute to 20 minute with 20 minute step and vacuum pressure is fixed to 10, 6, and 2 torr, average deviation decreases as 0.6, 0.5, and 0.2% respectively. Comparing measured effective porosity from experiments when vacuum pressure varies from 2 torr to 10 torr with 2 torr step and vacuum time is fixed to 100, 60, and 20 minute, average deviation increases as vacuum time decreases. These results can be a background of suggested method of ISRM that describes the vacuum time longer than 60 minute and vacuum pressure higher than 6 torr. In this study, only qualitative discussion can be possible for the effects on the effective porosity by decreasing 20 minute vacuuming time at the same pressure or by decreasing 2 torr of vacuum pressure at the same vacuum time. This is because the sample could not reached to perfectly dried condition even though the sample were dried at $105^{\circ}C$ and following the ISRM suggested method, so that initial water content could not be the same at each experiment.

Composite Ground Effects on Small Area Replacement Ratio of Sand Piles (면적치환비가 작은 샌드파일 설치지반에서의 복합지반효과)

  • Chun, Byung Sik;Yeoh, Yoo Hyeon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.2 no.3
    • /
    • pp.57-69
    • /
    • 2001
  • Sand pile is widely used as a ground improvement method. Although the primary purpose of constructing sand pile is accelerating consolidation, composite ground effect also can be gained by constructing sand pile. This study was accomplished to understand composite ground effect on the ground improved by sand piles which were applied as vertical drainage material when area replacement ratio was small relatively. For determining bearing capacities of origin ground and sand piles and analysing interaction between embankment and origin ground, bearing tests and earth pressure monitoring are performed. From the results, it turned out that the contribution of sand pile as a load bearing mechanism is not substantial. However, the bearing capacity of sand pile was increased to sixty percentages when compared with origin ground. The increasement of bearing capacity could be caused the change of consolidation characteristics during the process of consolidation by overburden load. Therefore, the composite ground effects depending on stiffness increasement of sand pile would be estimated as a factor decreasing consolidation settlement.

  • PDF

Load-transfer mechanism in the ground with discontinuity planes during tunnel excavation (불연속면이 존재하는 지반에서 터널굴착에 의한 하중전이)

  • Lee, Sang-Duk;Byun, Gwang-Wook;Yoo, Kun-Sun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.71-78
    • /
    • 2002
  • In this study, the influence of the presence of discontinuity planes on the load transfer mechanism and the pattern of loosening zone was studied based on the laboratory test. The trap-door and the reaction plates are installed as the bottom plane of the model box. The vertical discontinuity plane is installed in the dry sand. Various overburden heights and locations of discontinuity planes are applied as major factors in this study. The results show that at higher overburden heights over about 1.5 times the excavation width, the ratio of the transferred stress to the insitu stress converges to a certain value even if the overburden height increases further. The results also show that the discontinuity plane gives relatively larger influence on the load transfer mechanism, that produces the unsymmetrical load concentration, when the discontinuity plane locates within the tunnel width. When the discontinuity plane locates outside the tunnel width, the unsymmetrical load concentration is reduced considerably.

  • PDF

Comparative Study on the Performance of Small Satellites Launch Vehicle Employing ElecPump Cycle Upper Stage Engine (전기펌프 사이클 상단 엔진을 적용한 소형발사체 성능 비교연구)

  • Yu, Byungil;Kwak, Hyun-Duck;Kim, Hongjip
    • Journal of Aerospace System Engineering
    • /
    • v.14 no.5
    • /
    • pp.107-121
    • /
    • 2020
  • The performance analysis of the small satellites launch vehicle using the electric pump cycle as the upper stage engines was performed. The first stage is the launch vehicle that uses the test launch vehicle of the Korea Space Launch Vehicle II and the second stage employs elecpump cycle engine that uses liquid methane and kerosene (RP-1) as fuel. A model for the mass estimation was presented and the analysis was conducted for the range of thrust of 20 to 40 kN and combustion pressure of 3 to 6 MPa with a nozzle expansion ratio of 60 to 100. The mixture ratio with the maximum velocity increment was calculated and the performance of the LEO and SSO payload were calculated from the stage mass estimation. In both the cases, liquid methane, and RP-1 showed maximum payload for 20 kN thrust, 3 MPa combustion pressure, and the nozzle expansion ratio of 100, with a mixture ratio of 3.49 for liquid methane and 2.75 for RP-1. In addition, the ditching points of the first stage and the fairing in the LEO mission were analyzed using ASTOS.

A Theoretical Study on Arching Effect of Embankment Pile Grid (격자배치 성토지지말뚝의 아칭효과에 대한 이론적 연구)

  • Lee, Seung-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.302-309
    • /
    • 2017
  • The influence of the pile diameter, center to center pile spacing, internal friction angle of embankment soil, and height of embankment on the arching efficacy of the embankment pile was investigated. The arching efficacy, which was derived by the arch model developed in the embankment soil was calculated using two methods, one that considers crown failure of the arch and the other that considers load on the pile cap and critical relative spacing ratio for which the arching efficacy calculated by the two methods are the same. According to the computed results in this study, the arching efficacy calculated from a consideration of the load on pile cap governs when the relative spacing ratio becomes smaller and that calculated from the theory of crown failure governs when the relative spacing ratio becomes larger. The critical relative spacing ratio below which the arching efficacy calculated from a consideration of the load on pile cap governs the design decreases with increasing value, which is defined by the ratio of the pile diameter to the pile center to center spacing. Critical relative spacing ratios, which correspond to the values of 0.5 and 0.2 were 0.35 and 0.85, respectively. Considering the computed results, the critical relative spacing ratio decreases with increasing Rankine passive earth pressure coefficient and critical relative spacing ratios, which correspond to values of 5 and 2, were 0.23 and 0.85, respectively. The arching efficacy, which corresponds to the area ratio of 9%, was 54% and the one that corresponds to the value of 3 was 61%; the critical relative spacing ratios, which correspond to those arching efficacies, were greater than 0.5.