• Title/Summary/Keyword: Earned Schedule

Search Result 51, Processing Time 0.022 seconds

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

SE, CM, EVM 통합을 통한 사업 관리 향상 방안

  • Seok, Yeon-Suk;Gang, Seong-Jin;Park, In-Gyeong;Gwon, Yong-Su
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.1023-1029
    • /
    • 2007
  • 우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.

  • PDF

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

Valuation of Benefits from the Adoption of Project Information Management System

  • Kyong Ju Kim;Kyoungmin Kim;Ki Yong Kang;Geon Hee Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1548-1552
    • /
    • 2009
  • In the construction industry, IT has been an alternative for the enhancement of productivity and technical advances through a paradigm shift. While it has been recognized that the IT system will have a substantial influence on the industry, a quantitative valuation has been very limited. This paper has chosen EVMS (Earned Value Management System), which supports the integrated management of cost and schedule by utilizing IT tools, and which is the largest trend in the construction IT industry in Korea, in order to suggest an analysis model for the valuation of IT. The CVM (Contingent Valuation Method) is used to quantitatively measure intangible value of IT application. Then, a valuation and analysis model were suggested for the quantitative valuation of the effect of IT adoption. In terms of willingness to pay for EVMS, the expected benefits from the adoption of EVMS were US$ 584.52 per man annually. This research should be helpful for construction companies evaluating their investment to Project Management Information System.

  • PDF