본 논문은 배전선에 설치하는 내뢰설비인 가공지선과 피뢰기의 특성과 생략 방안에 대하여 언급하였다. 특히, 피뢰기의 중간 상을 생략하는 방안에 대하여 EMTP 시뮬레이션을 실시하여 생략시 나타날 수 있는 문제점과 생략 방안에 대해 기술하였으며, 가공지선은 지정된 경우에는 생략이 가능하고 피뢰기는 중간 상을 생략시 건전상의 피뢰기 용량을 재검토해야 할 것으로 생각된다.
International Journal of Control, Automation, and Systems
/
제6권5호
/
pp.651-659
/
2008
Autoreclosing techniques have been used in power systems to maintain system stability and continuity of supply. Environmental and economical issues have driven significant increases in the development of distributed generation (DG). DG connected to distribution systems, however, may impose negative influences with respect to power quality, protection, and stability, because DG can cause some challenges to protection, especially to reclosing. For this reason, in order to improve the reliability and safety of the distribution system, the rules and guidelines suggest that the DG system needs to be rapidly disconnected from the system before reclosing. We present, in this paper, an adaptive reclosing algorithm considering the DG. The algorithm consists of an angle oscillation's judgment, the emergency extended equal-area criterion (EEEAC), the calculation of an optimal reclosing time, and a reconnection algorithm. Our simulation results for three different DG technologies with Electromagnetic Transient Program (EMTP) indicate that we can maintain transient stability while the DG is protected against disturbances.
This paper describes a fault location algorithm in real combined transmission systems with underground power cable. The algorithm to calculate the fault location was developed using DWT wavelet transform and travelling wave occurred at fault point. And the proposed algorithm is also used the transient signal of one end in stead of the signal information of two ends. On the other hand, in this papers, the method to discriminate fault point between overhead line and cable section is also Proposed. Variety simulations were carried out to verify the accuracy and effectiveness of the proposed algorithm using EMTP/ATFDraw and Matlab. Simulation results show that the proposed method has the excellent ability for discrimination of fault section and fault location in combined transmission systems with power cables.
This paper proposed protective coordination on HTS(High Temperature Superconducting) cable on 22.9kV distributed system. HTS cable transient model is developed and tested using EMTP-RV, system protective coordination is studied with ETAP. Possible contingency and protective scheme are considered real distribution system in Icheon substation. The simulation results was showed, in protective case to apply conventional relay, that appeared problem on HTS cable inner part. The HTS cable couldn't protection on contingency state of power system. It was using high-speed relay system instead of conventional relay system. Then, the HTS cable was protected contingency by circuit breaker.
This paper proposes the algorithm for discriminating faults from the variation due to the operation of non-linear components to prevent the mal-operation of protection relay in the distribution system. An IEEE 13 node test feeder is modeled to analyze the characteristics of the fault and each variation using EMTP-RV. Simulations with various operating conditions of transformers, non-linear loads, and unbalanced loads are performed using the test feeder model. Based on simulation results, the wavelet transform is adopted to analyze the current waveforms from the faults and variations to find out the differences between them and the algorithm for discriminating faults from the variation is proposed. The proposed algorithm is verified by using the current waveforms simulated in the KEPCO's distiribution system and IEEE 13 node test feeder.
This paper analyzes a asymmetry current with SFCL (Superconducting Fault Current Limiter) operation during transient period, when a fault occurs in power systems. The principle of asymmetry current nature is reviewed and asymmetry components reduction with SFCL operation is explained. To verify the performance of SFCL, a EMTP/ATPDraw model of SFCLs using MODELS language developed and simulated. Throughout the simulation, results presents the main factors for reducing the asymmetry component of fault current are not a quenching time, but a limiting resistance of SFCL and fault initiated angle.
본 논문에서는 2회선 초고압 송전선로의 4.5 km 이격한 서로 다른 송전철탑에서 발생한 섬락사고의 원인을 규명하기 위한 연구결과를 소개하고자 한다. 섬락사고는 낙뢰가 원인을 제공한 것으로 추정되었으며 2회선중 각각 1개 상의 섬락고장을 동시에 유발하였다. 뇌고장은 낙뢰의 송전선 침입 위치에 따라 역섬락과 차폐실폐 고장으로 분류하고 각기 다른 대책을 적용한다. 연구에서는 고장유발 낙뢰의 크기를 모의계산을 통하여 추정하고 낙뢰에 의한 섬락 형태를 밝히고자 하였다.
Frequency is an important operating parameter of a power system. Electric power systems sustain transient frequency swings whenever the balance between generation and load does not no longer hold. To cope with this Constraints, il requires an accurate and high speedy frequency deviation estimation technique and suitable adjustment to obtain the power system energy balance. This paper describes the design, computational aspects and implementation of an iterative technique for measuring power system. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.
Frequency is an important operating parameter of a power system. Electric power systems sustain transient frequency swings whenever the balance between generation and load does not no longer hold. To cope with this Constraints, it requires an accurate and high speedy frequency deviation estimation technique and suitable adjustment to obtain the power system energy balance. This paper describes the design, computational aspects and implementation of an iterative technique for measuring power system. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.
Frequency is an important operating parameter of a power system. Electric power systems sustain transient frequency swings whenever the balance between generation and load does not no longer hold. To cope with this Constraints. it requires an accurate and high speedy frequency deviation estimation technique and suitable adjustment to obtain the power system energy balance. This paper describes the design, computational aspects and implementation of an iterative technique for measuring power system. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.