• 제목/요약/키워드: EIA (Environmental Impact Assessment)

검색결과 855건 처리시간 0.025초

생태하천 복원 방안 (Suggestions for Ecological Stream Restoration)

  • 김명진
    • 환경영향평가
    • /
    • 제16권1호
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

환경정보 체계화에 관한 연구(II) (Studies on Environmental Information System(II))

  • 김명진;최덕일;장준기;이재운
    • 환경영향평가
    • /
    • 제2권1호
    • /
    • pp.21-29
    • /
    • 1993
  • We live in an age of information and an era of rising environmental awareness. As a result, efficient and judicious use of environmental information has become a prerequisite to planning and management of environmental affairs in contemporary societies. So, we have embarked on a study of Environmental Information System(EIS). In the first article, we discussed the status analysis of EIS in Korea, USA, and Japan. This study as the second project has three major components. First, it classifies items and sources of 22 EIA factors. Second, it explains building of environmental information comprising geographic and attribute data of 17 factors. Finally, the study presents applications of EIS as an alternative assessment of suitability analysis. Based on these analysis, the study makes some recommendations and conclusions.

  • PDF

한국에서의 건강영향평가 도입방안

  • 한상욱;김임순;한영한
    • 환경기술인
    • /
    • 제24권통권256호
    • /
    • pp.23-25
    • /
    • 2007
  • 건강영향의 중요성에 대한 인식이 증가함에 따라, 본 연구는 건강영향평가의 최적 도입방안을 연구하는데 목적을 둔다. 한국의 지난 30년 동안 환경영향평가(EIA)를 수행하고 있다. EIA내의 스크리닝, 스코핑, 분석, 영향평가, 협의, 보고서 검토, 의사결정 및 모니터링 과정들은 HIA의 필수적인 부분이 될 것이다. 스크리닝 및 스코핑 과정은 아직 EIA내에 포함되어 있지는 않지만, 기존 EIA 과정내로 HIA를 통합하는 것은 한국에서 매우 효율적인 방안이 될 수 있다. 나아가, EIA내의 기존 공중-위생 항목을 보건 영향을 고려하기 위해 충분한 결정인지를 지닌 환경-보건항목으로 교체 및 확장하는 것이 바람직할 것이다. 한국의 경우, HIA의 초기 시행을 고려할 때 사회과학 및 심리학에 기초한 전향적 및 정량적 접근법이 보다 적합할 것이다. 본 연구에서는, 체크리스트와 툴키트가 개발되었으며, HLA의 적용 및 보급에 있어 매우 유효한 지침이 될 수 있을 것이다.

  • PDF

경관영향평가제도의 개선에 관한 연구 - 사전환경성검토와 환경영향평가를 중심으로 - (A Study on Improvements of Landscape Impact Assessment - EIA and PER in Priority -)

  • 최형석
    • 한국환경복원기술학회지
    • /
    • 제8권4호
    • /
    • pp.68-80
    • /
    • 2005
  • This study intends to analysis problems and propose of EIA(Environmental Impact Assessment) and PER(Pre-Environmental Review) especially on division of landscape impacts. The problems of EIA and PER are first, on analysis of existing conditions side, insufficiency of the list of landscape elements and their descriptions and presentations, and the number of viewpoints and each validity second, on estimation of landscape impacts, the methods and techniques of estimation and simulation, and the process of impact estimation, third, on suggestion of reduction plans, reduction devices covering impacts, the lack of influence reduction forecasting devices, the deficiency of execution power of reduction plans, finally, the systematic connection of impact estimation with existing conditions analysis and reduction plans. Therefore, on each step from existing condition analysis to reduction plan suggestion, the solutions to each problem are proposed.

토지환경 및 자연생태환경을 고려한 환경영향평가 협의결정 개선방안 (Environmental Impact Assessment Consultation Based on Land Environment and Natural & Ecological Environment)

  • 이종호
    • 환경영향평가
    • /
    • 제29권1호
    • /
    • pp.45-60
    • /
    • 2020
  • 과거에는 대기오염, 수질오염, 폐기물 등이 환경영향평가에서 주요한 평가항목이었는데 최근에는 토지환경(토지이용, 지형), 자연생태환경(동·식물상, 자연환경자산), 사회·경제 환경 등이 주요한 평가항목으로 다뤄지고 있다. 2012년 이후 전략환경영향평가와 소규모환경영향평가의 협의결과를 보면, 90 %이상이 조건부동의였다. 그러나 환경영향평가의 협의결과는 2012년~2016년 기간 거의 대부분(94.1 %) 동의였으나, 환경정책기조가 바뀌는 2017년 이후부터 대부분(87.4 %) 조건부동의로 결정되었다. 그리고 세 종류 환경영향평가의 부동의 비율이 2013년~2016년 기간 0.3~0.6 % 밖에 되지 않았는데, 2017년~2019년 기간 1.3~3.1 %로 급증하였다. 그 사이 협의 결과에 영향을 미칠만한 제도나 분석기법의 변화가 없었다면, 협의결과의 일관성 및 공정성의 결여가 문제로 제기될 수 있다. 따라서 환경영향평가에서 입지타당성을 결정하는 토지이용, 동·식물상 및 자연환경자산, 사회·경제 등의 평가항목에 대한 지표개발과 적용에 대한 연구가 요구되고 있다. 본 연구는 환경영향평가가 전략환경영향평가, 환경영향평가, 소규모환경영향평가로 구분되어 시행되는 2012년 이후 동의, 조건부동의, 부동의 협의결과를 분석한다. 부동의 사례에 대해 6개 환경분야 중 입지타당성분석에서 중요한 토지환경과 자연생태환경의 평가항목을 중심으로 근거요인을 분석하고, 환경관련 토지이용규제와 환경관련 등급을 중심으로 개발계획이나 개발사업에 대한 환경영향평가에서 협의 결정의 개선방안을 모색한다.

선형사업에 대한 환경영향평가 시 대기질 예측치와 실측치의 정합성 분석 - PM10과 NO2를 중심으로 - (Consistency Analysis between Predicted and Measured PM10 and NO2 Air Quality During Environmental Impact Assessment of Linear Construction Projects)

  • 임노을;성현찬;김순정;김지영;전성우
    • 환경영향평가
    • /
    • 제31권6호
    • /
    • pp.378-387
    • /
    • 2022
  • 대기오염이 국제적으로 해결해야 하는 공통과제가 되었으며 국내에서는 지나친 대기오염을 예방하기 위해 개발 사업 이전에 환경영향평가를 통해 대기질 영향을 예측하고 사업 진행 이후에는 사후환경영향 조사를 통해 대기질을 관리하고 있다. 해당 데이터를 확인하고 정합성을 분석하여 조사과정과 영향 예측기준 등에 대한 개선 방향을 제시하고자 하였다. 운영 시 측정까지 완료된 2017년에서 2019년 사이의 환경영향평가 대상 사업 중 선형사업의 공사 시 농도를 대상으로 연구를 진행하였다. 분석 결과는 크게 데이터를 비교하여 환경영향평가 예측치의 대기오염 기준 하향, 5년 이상 장기사업은 오염물질 배출 기준 등을 강화, 현황조사 시 농도가 높게 실측되는 1분기와 2분기를 포함하는 개선방안과 정합성 분석을 통해 대기질의 과대 추정을 방지하기 위해 투입되는 건설장비의 종류나 사업 조건들을 설정하여 상황에 맞는 적합한 최대 배출농도를 예측하는 방향을 제시하였다. 본 연구는 데이터를 활용하여 환경영향평가 과정의 현황을 파악하고 그로부터 대기질 유지를 위한 규정이나 조사 방법 등 개선이 필요한 요소들을 파악하여 개선방안을 제안했다는 데 의의가 있다.

건설 예정인 댐에서 유역유출과 취수형태에 따른 탁수의 거동 예측 (Simulation of Turbid Water According to Watershed Runoff and Withdrawal Type in a Constructing Reservoir)

  • 박재충;최재훈;송영일;유경미;강보승;송상진
    • 환경영향평가
    • /
    • 제19권3호
    • /
    • pp.247-257
    • /
    • 2010
  • Watershed runoff and turbid water dynamics were simulated in the Youngju Dam, being constructed. The runoff flow and suspended solids were simulated and then thermal stratification and turbid water current in the reservoir were predicted by HSPF and CE-QUAL-W2 model, respectively. Considering selective withdrawal, we hypothesized 3 withdrawal types from the dam, i.e. surface layer, middle layer and the lowest layer. The maximum concentration of SS was 400mg/L in reservoir and it was decreased by the withdrawal. The inflowed turbid water fell to 30 NTU after 12 days regardless of the withdrawal types, but the surface layer withdrawal was a better type at turbid water discharge than the others. In current environmental impact assessment(EIA), we concluded that runoff and reservoir water quality predicted by HSPF and CE-QUAL-W2 was desirable, and appropriate parameters were selected by continous monitoring after EIA.

한국 환경영향평가 제도에 대한 이해관계자의 인식 조사 (Survey on the Perception of Stakeholders on the EIA System in Korea)

  • 김민경;이상돈
    • 환경영향평가
    • /
    • 제30권1호
    • /
    • pp.49-60
    • /
    • 2021
  • 환경영향평가 실무자들은 환경영향평가 정책을 수립하는데 매우 중추적인 역할을 하며, 환경영향평가 시행 시에는 이해관계자와의 정보공유, 의견조율 등을 통하여 환경 갈등을 예방하고 해소할 수 있다. 따라서 환경영향평가 정책 및 시행 등 시스템 전반에 대하여 실무자를 포함한 이해관계자의 인식을 파악하는 것은 환경영향평가의 개선 방향 및 정책 방향 설정에 도움이 될 수 있다. 그러나 현재 한국에서 시행되고 있는 환경영향평가 제도 및 운영에 대한 이해관계자의 인식 및 이해에 대한 정보는 부족한 상황이다. 그러므로 본 연구는 의사결정 수단이며, 환경 정보 분석기법을 통해 악영향을 최소화할 수 있는 사전예방적 기법인 환경영향평가 제도에 대해서 운영 및 절차상의 문제점들을 진단하고, 향후 환경영향평가 제도의 개선점과 시스템의 보완점을 모색하고자 하였다. 37개의 질문의 온라인 설문조사를 통해 환경영향평가 이해관계자 95명의 응답을 정리하였다. 이해관계자들은 현행 제도의 운영과 평가서 작성의 문제점 등에 대해 인식하고 있었으며, 이를 반영하여 나타났다. 부정 응답률(불만족 및 매우 불만족)이 높게 나타난 평가서 작성 기간 및 비용(49%), 새로운 방법의 도입(46%), 주민의견수렴 및 갈등관리의 항목(41%)은 추후 우리가 더 보완해야 할 부분이라 판단된다. 사회가 빠르게 발전하면서 제도도 그에 맞추어 보완이 필요하며, 조사결과 부정 응답이 높은 항목들에 대해 정책적인 개선 노력이 필요하다.