• Title/Summary/Keyword: EIA(Environmental Impact Assessment)

Search Result 850, Processing Time 0.048 seconds

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

Studies on Environmental Information System(II) (환경정보 체계화에 관한 연구(II))

  • Kim, M.J.;Choi, D.I.;Chang, C.K.;Lee, J.W.
    • Journal of Environmental Impact Assessment
    • /
    • v.2 no.1
    • /
    • pp.21-29
    • /
    • 1993
  • We live in an age of information and an era of rising environmental awareness. As a result, efficient and judicious use of environmental information has become a prerequisite to planning and management of environmental affairs in contemporary societies. So, we have embarked on a study of Environmental Information System(EIS). In the first article, we discussed the status analysis of EIS in Korea, USA, and Japan. This study as the second project has three major components. First, it classifies items and sources of 22 EIA factors. Second, it explains building of environmental information comprising geographic and attribute data of 17 factors. Finally, the study presents applications of EIS as an alternative assessment of suitability analysis. Based on these analysis, the study makes some recommendations and conclusions.

  • PDF

한국에서의 건강영향평가 도입방안

  • Han, Sang-Uk;Kim, Im-Sun;Han, Yeong-Han
    • Environmental engineer
    • /
    • v.24 s.256
    • /
    • pp.23-25
    • /
    • 2007
  • 건강영향의 중요성에 대한 인식이 증가함에 따라, 본 연구는 건강영향평가의 최적 도입방안을 연구하는데 목적을 둔다. 한국의 지난 30년 동안 환경영향평가(EIA)를 수행하고 있다. EIA내의 스크리닝, 스코핑, 분석, 영향평가, 협의, 보고서 검토, 의사결정 및 모니터링 과정들은 HIA의 필수적인 부분이 될 것이다. 스크리닝 및 스코핑 과정은 아직 EIA내에 포함되어 있지는 않지만, 기존 EIA 과정내로 HIA를 통합하는 것은 한국에서 매우 효율적인 방안이 될 수 있다. 나아가, EIA내의 기존 공중-위생 항목을 보건 영향을 고려하기 위해 충분한 결정인지를 지닌 환경-보건항목으로 교체 및 확장하는 것이 바람직할 것이다. 한국의 경우, HIA의 초기 시행을 고려할 때 사회과학 및 심리학에 기초한 전향적 및 정량적 접근법이 보다 적합할 것이다. 본 연구에서는, 체크리스트와 툴키트가 개발되었으며, HLA의 적용 및 보급에 있어 매우 유효한 지침이 될 수 있을 것이다.

  • PDF

A Study on Improvements of Landscape Impact Assessment - EIA and PER in Priority - (경관영향평가제도의 개선에 관한 연구 - 사전환경성검토와 환경영향평가를 중심으로 -)

  • Choi, Hyung-Seok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.4
    • /
    • pp.68-80
    • /
    • 2005
  • This study intends to analysis problems and propose of EIA(Environmental Impact Assessment) and PER(Pre-Environmental Review) especially on division of landscape impacts. The problems of EIA and PER are first, on analysis of existing conditions side, insufficiency of the list of landscape elements and their descriptions and presentations, and the number of viewpoints and each validity second, on estimation of landscape impacts, the methods and techniques of estimation and simulation, and the process of impact estimation, third, on suggestion of reduction plans, reduction devices covering impacts, the lack of influence reduction forecasting devices, the deficiency of execution power of reduction plans, finally, the systematic connection of impact estimation with existing conditions analysis and reduction plans. Therefore, on each step from existing condition analysis to reduction plan suggestion, the solutions to each problem are proposed.

Environmental Impact Assessment Consultation Based on Land Environment and Natural & Ecological Environment (토지환경 및 자연생태환경을 고려한 환경영향평가 협의결정 개선방안)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.29 no.1
    • /
    • pp.45-60
    • /
    • 2020
  • In the past, air pollution, water pollution and solid waste were very important items, but at present environmentally sound land use, ecosystem conservation and sustainable socio-economy have become very important in EIA. According to the consultation result of SEA and Small scale EIA during 2012~2019, most results are 'Conditional Agreement'. Especially EIA consultation results before 2016 were mostly (94.1 %) 'Agreement', but since 2017 most (87.4 %) are 'Conditional Agreement'. And the percentage of 'Non Agreement' have sharply increased from 0.3~0.6 % (during 2013~2016) to 1.3~3.1 % (during 2017~2019). In case there have been no change in EIA system and consultation techniques, the problems of inconsistency and unfairness could be raised. Therefore are urgently required researches on environmentally sound land use, ecosystem conservation and sustainable socio-economy which decide location feasibility assessment. The purpose of this study is to analyse the consultation cases of SEA, EIA, and Small scale EIA since 2012, and to identify key factors which result in the decision of nonagreement of development plans and development projects, and to suggest the improvements on EIA consultation based on land use regulation and environmental grade.

Consistency Analysis between Predicted and Measured PM10 and NO2 Air Quality During Environmental Impact Assessment of Linear Construction Projects (선형사업에 대한 환경영향평가 시 대기질 예측치와 실측치의 정합성 분석 - PM10과 NO2를 중심으로 -)

  • No Ol, Lim;Hyun Chan, Sung;Sun Jeong, Kim;Ji Young, Kim;Seong Woo, Jeon
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.378-387
    • /
    • 2022
  • Since air pollution has become a global issue to be managed, the Republic of Korea (ROC) is protecting air quality by predicting the air condition before a construction project starts through EnvironmentalImpact Assessment (EIA) and measuring the air condition afterwards the construction project ends through Post-environmental Impact Assessment (PEIA). The aim of this study consists on verifying the predicted and measured concentration data and analyzing their consistency in order to deduce improvement directions. Linear EIA projects which the investigation during operation period have been concluded between years 2017 and 2019 were used. As a result, the following improvement directions were suggested: reduction of EIA air quality standards, strengthen the management of projects with construction duration longer than 5 years, incorporation of first or second quarter (winter or spring) into the investigation period, consideration of construction equipment or conditions for better prediction. The strength of this study is that we arranged and utilized EIA predicted and PEIA measured data to understand the present EIA procedure and made meaningful suggestions through the consistency analysis contributing to air quality maintenance and investigation methodology enhancement.

Simulation of Turbid Water According to Watershed Runoff and Withdrawal Type in a Constructing Reservoir (건설 예정인 댐에서 유역유출과 취수형태에 따른 탁수의 거동 예측)

  • Park, Jae-Chung;Choi, Jae-Hun;Song, Young-Il;Yu, Kyung-Mi;Kang, Bo-Seung;Song, Sang-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.3
    • /
    • pp.247-257
    • /
    • 2010
  • Watershed runoff and turbid water dynamics were simulated in the Youngju Dam, being constructed. The runoff flow and suspended solids were simulated and then thermal stratification and turbid water current in the reservoir were predicted by HSPF and CE-QUAL-W2 model, respectively. Considering selective withdrawal, we hypothesized 3 withdrawal types from the dam, i.e. surface layer, middle layer and the lowest layer. The maximum concentration of SS was 400mg/L in reservoir and it was decreased by the withdrawal. The inflowed turbid water fell to 30 NTU after 12 days regardless of the withdrawal types, but the surface layer withdrawal was a better type at turbid water discharge than the others. In current environmental impact assessment(EIA), we concluded that runoff and reservoir water quality predicted by HSPF and CE-QUAL-W2 was desirable, and appropriate parameters were selected by continous monitoring after EIA.

Survey on the Perception of Stakeholders on the EIA System in Korea (한국 환경영향평가 제도에 대한 이해관계자의 인식 조사)

  • Kim, Minkyung;Lee, Sangdon
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.1
    • /
    • pp.49-60
    • /
    • 2021
  • Environmental impact assessment (EIA) practitioners play a very pivotal role in establishing EIA policies, and when implementing EIA environmental conflicts can be prevented and resolved by sharing information with stakeholders and coordinating opinions. For this reason, grasping the perceptions of stakeholders including practitioners about the overall system, such as EIA policies and implementation, can be helpful in setting improvement directions and policy directions for EIA. However, there is an insufficient information on the perception and understanding of stakeholders about the EIA system and operation currently in effect in Korea. Therefore, this study diagnoses operational and procedural problems for the EIA system, which is a decision-making tool and a precautionary technique that can minimize adverse effects through the environmental information analysis method, and improvement points and systems of the EIA system in the future. We tried to find a complement of an online survey of 37 questions,responses from 95 responses from stakeholders of EIA were summarized. Stakeholders were aware of the problems of the operation of the current system and the preparation of the evaluation form, and this was reflected. Period and cost of preparation of EIS (49%), the introduction of a new method (26%) and the items of collecting opinions and conflict management (41%), which showed high negative response rates (dissatisfied and very dissatisfied), are considered to be areas that we need to supplement further in the future. As society develops rapidly, the system needs to be supplemented accordingly, and policy improvement efforts are needed for items with high negative responses as a result of the survey.