• Title/Summary/Keyword: E-bidding System

Search Result 23, Processing Time 0.018 seconds

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.

A Study on Perceived Problems of and Improvement Measures for Asbestos Abatement Companies in Support of Related Policies (석면 해체 및 제거 업체가 느끼는 관련 제도의 문제점 및 개선방안에 관한 연구)

  • Chang, Jaepil;Rho, Youngman;Jung, Kihyo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.30 no.1
    • /
    • pp.28-38
    • /
    • 2020
  • Objectives: The purpose of this study is to identify the perceived problems of and suggest improvement measures for asbestos abatement companies in support of asbestos-related systems and policies. Methods: For this study a questionnaire was prepared consisting of current work (two questions), the contribution and necessity of a risk assessment system for asbestos abatement (two questions), and problems with and improvement measures for systems and policies (nine questions). The questionnaires were sent to 2,170 asbestos abatement companies and were returned by 83 companies (return rate = 3.8%). We conducted frequency analysis, ANOVA, and a Chi-squared test at the 5% significance level. Results: Asbestos abatement companies expressed difficulties with complying with wet work (43% of unenrolled managers), negative pressure enclosure (36% of all respondents), and installation and use of decontamination units (26% of all respondents) as stipulated in the relevant regulations. In addition, 43% of the respondents expressed concerns that the expertise of the company was not considered during bidding for asbestos abatement and hoped that an advantage (e.g., bid point) would be given to the upper grades for asbestos risk assessment (38%). Asbestos abatement companies generally rented and used negative pressure devices (including negative pressure recording devices) and suggested that periodic calibration (32%) is needed to ensure the performance of the rented equipment. Finally, the respondents asked for clear definitions for three situations specified in the Occupational Safety and Health Acts: (1) temporarily leaving the asbestos abatement workplace; (2) tasks with less airborne asbestos; and (3) physically breaking or cutting using a machine. Conclusions: The problems and improvement measures identified in this study of asbestos abatement companies can be utilized as fundamental information for the improvement of the systems and policies for safe asbestos abatement.