• Title/Summary/Keyword: Duration Estimation

Search Result 430, Processing Time 0.028 seconds

The Estimation of Monthly Average Solar Radiation using Sunshine Duration and Precipitation Observation Data in Gangneung Region (강릉지역의 일조시간과 강수량 관측자료를 이용한 월평균 일사량 추정)

  • Ahn, Seo-Hee;Zo, Il-Sung;Jee, Joon-Bum;Kim, Bu-Yo;Lee, Dong-Geon;Lee, Kyu-Tae
    • Journal of the Korean earth science society
    • /
    • v.37 no.1
    • /
    • pp.29-39
    • /
    • 2016
  • In this study, we estimated solar radiation by multiple regression analysis using sunshine duration and precipitation data, which are highly correlated to solar radiation. We found the regression equation using data obtained from GROM (Gangwon Regional Office of Metrology, station 105, 1980-2007) located in Gangneung, South Korea and validated the equation by applying data obtained from new GROM (newly relocated, station 104, 2009-2014) and data obtained from GWNU (Gangneung-Wonju National University, 2013-2014) located between stations 104 and 105. By using sunshine duration data alone, the estimation using data from station 104 resulted in a correlation coefficient of 0.96 and a standard error of $1.16MJm^{-2}$, which was similar to the previous results; the estimation using data from GWNU yielded better results with a correlation coefficient of 0.99 and a standard error of $0.57MJm^{-2}$. By using sunshine duration and precipitation data, the estimation (using data from station 104) yielded a correlation coefficient of 0.96 and a standard error of $0.99MJm^{-2}$, resulting in a lower standard error compared to what was obtained using sunshine duration data alone. The maximum solar radiation bias increased from -26.6% (March 2013) to -31.0% (February 2011) when both sunshine duration and precipitation data were incorporated into the estimation rather than when sunshine duration data alone was incorporated. This was attributed to the concentrated precipitation found during May and July-September, which resulted in negative coefficients of the estimating equation in other months. Therefore, the monthly average solar radiation should be estimated carefully when employing the monthly average precipitation for those places where precipitation is concentrated during summer, such as the Korean peninsula.

Parameter Estimation of Intensity-Duration-Frequency Formula Using Genetic Algorithm(II): Separation of Short and Long Durations (유전자알고리즘을 이용한 강우강도식 매개변수 추정에 관한 연구(II): 장.단기간 구분 방법의 제시)

  • Shin, Ju-Young;Kim, Tae-Son;Kim, Soo-Young;Heo, Jun-Haeng
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.10
    • /
    • pp.823-832
    • /
    • 2007
  • In this study, the separation of short and long durations for estimation the parameters of IDF curve is suggested by using Multi-Objective Genetic Algorithm (MOGA). Objective functions are to minimize root mean squared error (RMSE) and relative RMSE between observed and computed values. The criteria for separation are two; the first one is to estimate more precisely the parameters of IDF curve and the second is to make a single IDF curve without non-continuous duration point. For this purpose 22 rainfall recording gauges operated by Korea Meteorological Administration are selected and three IDF curves that are used generally in South Korea are tested. The result shows that the IDF curve developed by Heo et al. (1999) would be the best of three tested IDF curves, and the suggested parameter estimation method using MOGA can compute more reliable parameters compared with empirical regression analysis.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Correlation Analysis of Watershed Characteristics and the Critical Duration of Design Rainfall (설계강우의 임계지속기간과 유역특성인자의 상관성 분석)

  • Lee, Jung-Sik;Sin, Chang-Dong;Lee, Bong-Seok
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.711-714
    • /
    • 2008
  • The objective of this study is to analyze the relationship between the watershed characteristics and the critical duration of design rainfall. For estimation of critical duration, adjustment Huff's method and ILLUDAS urban runoff model were applied to urban 21 areas. Watershed characteristics such as area, channel length, channel slope, shape factor, and pipe density were used to simulate correlation analysis. The conclusions of this study are as follows; it is revealed that critical duration is influenced by the watershed characteristics such as pipe density, area and channel length. Also, multiple regression analysis using watershed characteristics is carried out and the determination coefficient of multiple regression equation shows 0.972.

  • PDF

The Duration and H/V ratio of the Ground Motion in Southern Korea (남한 지진의 지속시간과 H/V 비율)

  • 최호선;박창업;조남대
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2002.03a
    • /
    • pp.42-50
    • /
    • 2002
  • The duration and H/V ratio(the amplitude ratio of the horizontal to vertical components) of ground motions caused by earthquakes in southern Korea are analyzed. Total 329 seismograms of horizontal component recorded at hypocentral distances of 10 to 350 km from 27 earthquakes with local magnitude 2 to 4 are used for the analysis. Simplified relation between the duration of ground motion( $T_{d}$) and the ratio($\chi$) of Arias intensity( $I_{A}$) and squared maximum acceleration($\alpha$$_{max}$$^{2}$) is determined to be $T_{d}$ = 3.423$\chi$$^2$+ 8.200$\chi$ + 0.029, which is useful for the estimation of the duration in southern Korea. There are three distinct distance ranges with different linear variations of the duration in hypocentral distance. They are distance intervals of 10~80km, 80~140km, and the distance greater than 140km. The duration in southern Korea shows clear proportionality to the local magnitude at magnitudes greater than 3.1. The value 1.37 of the H/V ratio obtained in southern Korea is similar to the value 1.4 of ENA(Eastern North America). The H/V ratio in southern Korea increases in the frequency range from 0.3 to 10Hz. The duration and H/V ratio of ground motions derived in this study could be used in the stochastic simulation of strong ground motion.ion.n.n.

  • PDF

Estimation of Design Flood Runoff in Ungaged Forest Watershed to Reduce Flood Damage within the National Park (국립공원내 홍수피해 저감을 위한 미계측 산림지역의 설계홍수량 추정)

  • Kim, Sang-Min;Im, Sang-Jun;Lee, Sang-Ho;Kim, Hyung-Ho;Ma, Ho-Seop;Jeong, Won-Ok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.5
    • /
    • pp.107-113
    • /
    • 2009
  • The purpose of this study is to estimate the design flood runoff for ungaged forest watershed to reduce the flood damage in national park. Daewonsa watershed in Jirisan National Park was selected as study watershed, of which characteristic factors were obtained from GIS data. Flood runoff was simulated using SCS unit hydrograph module in HEC-HMS model. SCS Curve Number (CN) was calculated from forest type area weighted average method. Huff's time distribution of second-quartile storm of the Sancheong weather station, which is nearest from study watershed, was used for design flood runoff estimation. Critical storm duration for the study watershed was 3 hrs. Based on the critical duration, the peak runoff for each sub-watershed were simulated. It is recommended to monitor the long-term flow data for major stream stations in National Park for a better reliable peak runoff simulation results.

Estimation of Probable Maximum Depth-Area-Duration by Moisture Maximization over the Geumgang River Basin (금강유역에 내린 호우의 수분최대화에 의한 가능 최대 DAD의 산정)

  • Lee, Kwang-Ho
    • Atmosphere
    • /
    • v.16 no.2
    • /
    • pp.55-65
    • /
    • 2006
  • The characteristics of Depth-Area-Duration (DAD) for 50 storms over the Geumgang river basin have been analysed in terms of various storm causes using the precipitation data during the period from 1984 to 2003. Results show that the ratio of the precipitation depth to duration, and the ratio of decrease in the precipitation depth to area are the largest in the case of the tropical cyclone. Storm maximization ratios are in the range 1.03 to 2.66 for the 50 selected heavy precipitation cases over Geumgang river basin, with the largest value for the tropical cyclone case, suggesting that the tropical cyclone could cause heavier precipitation than the other storms. In addition, the 24-hour probable maximum precipitation for the Geumgang river basin is estimated to be about 745 mm in the maximum precipitation area.

A Basic Study on Data Estimation Model of Production-installation Using Mathematical Algorithm in Free-Form Concrete Panel (비정형 콘크리트 패널의 수학적 알고리즘을 이용한 생산-설치 데이터 생성모델 기초연구)

  • Son, Seung-Hyun;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.166-167
    • /
    • 2016
  • Unlike the past, supported by the development of digital technologies, free-form buildings are frequently designed with creative thoughts of architectural designers. However, there are some difficulties preventing successfully completion of projects, like reduced productivity and increased construction duration and cost upon the process of producing and installing concrete panels for free-form structures. In particular, there are active studies on the CNC machine for production of free-form concrete panels. Yet, it is difficult to effectively and easily come up with information on production and installation of free-form, curve-surfaced panels which are difficult to be mathematically defined. This requires a lot of manpower and time to implement the curved surfaces of free-form buildings as intended by architects. Accordingly, it needs a model that can effectively create production-installation data of free-form concrete panels for successful free-form building projects. Thus, the purpose of the study is to suggest data estimation model of production-installation using mathematical algorithm in free-form concrete panels. The study results will realize effective production and installation of free-form concrete members, allowing improved productivity of projects, reduced cost and shortened construction duration.

  • PDF