• 제목/요약/키워드: Due-Date Assignment

검색결과 14건 처리시간 0.019초

플라스틱 사출산업의 RFID를 이용한 웹기반 재고관리시스템 프레임웤 (A Framework of Web-based Inventory System using a RFID in Plastic Injection Molding Industry)

  • 임석진;송재호;고영욱;박병태
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2010년도 춘계학술대회
    • /
    • pp.189-197
    • /
    • 2010
  • Recently, industrial business environments have rapidly changed and face severe competitive challenges. The effective inventory system enables to product and deliver the products quickly for meeting due date of customer's order in this environment. This study have developed a web-based inventory system framework using RFID for a plastic injection molding industry. The system analysis inventory problem issues such as inventory planning, warehouse assignment. In this study, web-based inventory system using Java language is proposed and implemented. As the result of implementation of the system, we expected that it manages to inventory planning continually and systematically.

  • PDF

Quasi Assignment Algorithms in Job Shops

  • Byeon Eui-Seok;Lee Jang-Yong
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.704-708
    • /
    • 2002
  • Production scheduling has been one of the most critical issues in a manufacturing environment Job-shop scheduling problems(JSP) are well know from the standpoint of production planning and operations control in this research scheduling against due date is a measure of performance and the objective is minimizing total weighted tardiness This paper presents an idea of decomposition of the problem and shows robustmess of the schedule under various disturbances along with exact and approximation methods. The proposed method can indeed handle shop disturbances more effectively when compared with traditional and dynamic scheduling methods.

  • PDF

RFID를 이용한 사출산업에서의 웹기반 재고관리시스템 개발 (A Development of Web-based Inventory System using a RFID in Injection Molding Industry)

  • 임석진
    • 대한안전경영과학회지
    • /
    • 제12권3호
    • /
    • pp.177-182
    • /
    • 2010
  • Industrial business environments have rapidly changed and face severe competitive challenges. The effective inventory system enables to product and deliver the products quickly for meeting due date of customer's order in this environment. This study have developed a web-based inventory system using RFID for an injection molding industry. The system analysis inventory problem issues such as inventory planning, warehouse assignment and assist to develop production scheduling. In this study, web-based inventory system using Java language and RFID technology is proposed and implemented. As the result of implementation of the system, we expected that it manages to inventory planning continually and systematically.

반도체 프로브 공정에서의 2단계 계층적 생산 계획 방법 연구 (Two-Level Hierarchical Production Planning for a Semiconductor Probing Facility)

  • 방준영
    • 산업경영시스템학회지
    • /
    • 제38권4호
    • /
    • pp.159-167
    • /
    • 2015
  • We consider a wafer lot transfer/release planning problem from semiconductor wafer fabrication facilities to probing facilities with the objective of minimizing the deviation of workload and total tardiness of customers' orders. Due to the complexity of the considered problem, we propose a two-level hierarchical production planning method for the lot transfer problem between two parallel facilities to obtain an executable production plan and schedule. In the higher level, the solution for the reduced mathematical model with Lagrangian relaxation method can be regarded as a coarse good lot transfer/release plan with daily time bucket, and discrete-event simulation is performed to obtain detailed lot processing schedules at the machines with a priority-rule-based scheduling method and the lot transfer/release plan is evaluated in the lower level. To evaluate the performance of the suggested planning method, we provide computational tests on the problems obtained from a set of real data and additional test scenarios in which the several levels of variations are added in the customers' demands. Results of computational tests showed that the proposed lot transfer/planning architecture generates executable plans within acceptable computational time in the real factories and the total tardiness of orders can be reduced more effectively by using more sophisticated lot transfer methods, such as considering the due date and ready times of lots associated the same order with the mathematical formulation. The proposed method may be implemented for the problem of job assignment in back-end process such as the assignment of chips to be tested from assembly facilities to final test facilities. Also, the proposed method can be improved by considering the sequence dependent setup in the probing facilities.