• Title/Summary/Keyword: Drum-Buffer-Rope 스케줄링

Search Result 6, Processing Time 0.021 seconds

An Application Method and Effect Analysis of the DBR(Drum-Buffer-Rope) Method Under the Re-entrant Process (재투입공정 하에서 DBR 기법 적용 방안 및 효과분석)

  • Yang, Hyunjun;Jeong, Sukjae;Yoon, SungWook
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.1
    • /
    • pp.57-69
    • /
    • 2020
  • Many researchers have recommended that DBR scheduling would be an efficient method to maintain the balance of their workload among many processes in the general flow shop. However, as product variety has increased in recent years, the process has become more complex and requires the re-entrance of raw materials and work in process. The re-entrant line has known for the complex manufacturing process that raw materials are repeatedly processed on the same machine. This study reviews the applicability of DBR against the re-entrant manufacturing line due to the distinguishing characteristics and the higher complexity caused by multiple visits of a job into the identical process. In order to apply the DBR method to the re-entrant process, the main idea is to reconstruct re-entrant process into a virtual flow process(loop) that has a single bottleneck. This study discusses the following two questions. First, DBR is also superior to traditional scheduling methods against re-entrant manufacturing line. And how we structure and detect the system bottleneck (or sub-bottleneck) through drum-buffer-rope concepts. To answer the above questions, we experimented and analyzed the effects of the applicability of DBR under the general re-entrant process model(TRC, Technology Research Center). As a result, we have identified a balance between loops for cycle time and work in process.

A Study on Electronic Commerce in Supply Chain sing Drum-Buffer-Rope Scheduling (DBR 스케줄링을 이용한 공급체인에서의 전자 상거래 방안 연구)

  • 김효용;한영근
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.754-757
    • /
    • 2000
  • 인터넷을 이용한 사이버 거래가 빠른 속도로 증가함으로써 기업에게 있어 인터넷 쇼핑몰 구축은 더 이상 선택사항이 아닌 필수 사항이 되었다. 하지만 현재 사이버 거래 수준은 전통적 상거래 수준에 못 미칠뿐더러 거래 항목에 있어서도 매우 제한적인 것이 사실이다. 앞으로 사이버 거래는 계속적으로 증가하리라 전망되지만 제품의 특성 혹은 고객의 기호에 따라 전통적 상거래도 그 영역을 차지하며 함께 양립하여 발전할 것이다. 이에 본 연구에서는 기존의 상거래 시스템에 사이버 거래기능을 추가하는 모델을 제시한다. 먼저 지리적으로 멀리 떨어져 있는 유통망의 정보화를 위하여 인터넷 기술을 이용하고 공급체인(Supply Chain) 전체에 걸친 동기화를 위해 TOC(Theory of Constraint)의 DBR(Drum-Buffer-Rope) 스케줄링을 응용한다. 모든 생산 및 유통의 흐름 속도가 최종 분배 센타에 접수되는 고객의 요구에 따라 이루어지게 함으로써 공급체인 전체에 걸친 동기화를 이룰 수 있고 지속적인 버퍼 관리를 통하여서 재고의 절감은 물론 미출고의 발생도 최소화할 수 있다. 만약 분배 센타에 재고부족 현상이 일어날 경우에는 공급체인 상의 능력제약자원(Capacity Constraint Resource . CCR)을 찾아 개선 활동을 수행하며 공급체인의 흐름 속도를 능력제약자원에 맞추어 조절한다. 분배 센타에서 대리점 혹은 사이버 고객으로의 배송은 부분적 분할납품 Partial Transshipment : PT) 전략을 적용한다. 즉 각 분배 센타가 관리하는 수요지 중 인접한 지역을 부분적 분할납품 전략 적용 수요지로 선택하고 사이버 거래를 통해 생성된 물류가 부분적 분할납품 전략 적용 수요지에 분배되게 함으로써 각 분배 센타의 재고 완충역할을 수행하게 한다. 이에 따라 안전 재고 및 역 배송을 최소화 할 수 있을 뿐 아니라 미 출고로 인한 손실을 최소화하며 고객의 서비스를 일정하게 유지시킬 수 있을 것으로 기대된다.

  • PDF

DBR 스케줄링에의 고객관계관리 개념적용 방안

  • 곽윤호;한영근
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.11a
    • /
    • pp.287-291
    • /
    • 2000
  • 고객의 요구는 더욱더 개성화, 다양화되고 있고, 글로벌 시장은 다양한 가치관, 문화, 전통을 바탕으로 지역적인 개성을 추구한다. 전 세계에 그물처럼 엮어진 인터넷망은 시간과 거리의 제약을 완전히 없앴다. 기업은 국가와 대륙을 초월한 세계 무대에서 치열한 경쟁을 전개하고 있다. 이러한 상황에서 고객의 요구를 파악하여 이에 부합되는 제품의 생산 및 판매가 기업 경영에 있어서 주요 이슈로 등장하고 있으며, 이러한 추세는 제품 개발 기술의 보편화로 고객에 대한 서비스의 차별화로 집중되고 있다. 이런 수요를 충족시키기 해서는 CRM(Customer Relationship Management) 개념이 도입되어야 하고, 제조공정을 개선하며 경쟁력을 강화하기 위해서는 모든 기업이 고객의 가치를 최대화 할 수 있는 동기화 생산이 필수적이라고 하겠다. 본 연구에서는 CRM의 고객정보분류 방법 중 하나인 FART(F;Frequency, R;Recency, A;Amount, T;Type of merchandise/service)를 이용하여 주요고객을 분류하고, 이 정보를 Drum-Buffer-Rope 스케줄링 방법에 반영하여 기업의 생산능력과 우수고객 주문을 고려한 일정계획 방법을 제시한다. 이 결과로 우수고객에 대한 서비스 수준을 향상시키고 궁극적으로는 기업의 이윤을 최대화하는데 기여하고자 한다.

  • PDF

Real-Time DBR Scheduling in Internet Based Make-to-Order Manufacturing (인터넷을 통한 주문생산환경에서의 실시간 생산 DBR 스케줄링)

  • Han, Young-Geun;Kim, Yeon-Kyun
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.341-347
    • /
    • 2001
  • This paper describes a real-time manufacturing scheduling system on Internet using DBR(Drum-Buffer-Rope) scheduling method. We intend to change company-oriented manufacturing scheduling, which has been used at most manufacturing companies, to customer-oriented manufacturing scheduling. Customers can not only choose product kinds, quantities and order due dates, but also evaluate optimum order due date by themselves in real-time through internet and then the results will be converted into practical manufacturing scheduling. If the company cannot meet the customer order due date, it will offer reliable and accurate information to the customers by suggesting the earliest order due date. To evaluate the customer order due date in real time, companies should be able to estimate their accurate production capacity. This research uses Goldratt's DBR scheduling method to realize that function. The DBR scheduling does not recognize the production capacity of the whole company, but only of the constraint resources which have a great effect on the company throughput. Thus, it can improve the customer service level as well as the profit by performing more dynamic and reliable scheduling through Internet.

  • PDF

Real-time Delivery Estimation in Build-to-order Manufacturing (주문형 생산에서의 실시간 납기 산정)

  • 홍태영;강무진;박세형;이상봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.101-104
    • /
    • 2002
  • Leading companies have embraced the new economy with new and innovative BTO models. Instead of conventional company-oriented manufacturing scheduling, customer-oriented scheduling method attracts more and more attention. To evaluate the delivery of customer order in advance, the real production capacity as well as procurement lead time should be taken into account. This paper describes a quasi-real-time order delivery estimation system using TOC(Theory of Constraints) based scheduling method.

  • PDF

Development of an Effective Manufacturing Scheduling System for PCB Manufacturing Line Using Dual DBR Method (복수 DBR 기법을 이용한 PCB 생산라인의 효율적인 생산계획 시스템 개발)

  • Yoshida, Atsunori;Park, Jeong-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2935-2944
    • /
    • 2009
  • This paper proposes Dual DBR(Drum-Buffer-Rope) system for a small-to-medium-sized PCB(Printed Circuit Board) manufacturing line. DBR method of TOC(Theory of Constraints) is an effective system for a small-to-medium-sized company to build production scheduling system. But to apply it to PCB line, it needs more technical consideration because of multiple constraints, looping process line and complex buffer management. This paper proposes an answer of these problems using Dual DBR to build production scheduling system more successfully. And it was confirmed that lead time was reduced more than 20% applying Dual DBR system to a domestic PCB manufacturing line actually.