Field Application of a Latent Heat Storage Tank for Load Shaving of Domestic Hot Water Supply in District Heating (지역난방 급탕공급 부하균등화를 위한 잠열축열조의 현장 적용)

  • Park, Sung Yong;Yoo, Hoseon
    • Plant Journal
    • /
    • v.17 no.2
    • /
    • pp.42-47
    • /
    • 2021
  • In terms of district heating operation, efficient production and supply of heat by alleviating the peak load at a specific time require an application technology that can solve the inconvenience of the user and the difficulties of the supplier. In this study, a 78 ℃ class PCM heat storage tank suitable among the technologies that can solve these problems was manufactured and applied to the hot water supply facility for apartments in district heating users. As a result of the application of this system, it was confirmed that the supply temperature was constant to the user compared to the existing supply method. In addition, it was confirmed that the reduction of the peak load due to load equalization reduced the heat supply margin of 10% in the existing heat supply facility. And the construction cost of the new heat supply facility and the construction cost of heat users is decreased by 5% and 10%, respectively.

Empirical Study of Biogas Purification Equipment (바이오가스 정제 설비의 실증 연구)

  • Hwan Cheol Lee;Jae-Heon Lee
    • Plant Journal
    • /
    • v.18 no.4
    • /
    • pp.58-65
    • /
    • 2023
  • In this study, to increase the methane content of biogas supplied from Nanji Water Regeneration Center and to purify impurities, a three-stage membrane purification process was designed and installed to demonstrate operation. The methane concentration of biomethane produced in the 2 Nm3/h purification process was set to three cases: 95%, 96.5%, and 98%, and the membrane area ratio of the membrane was 1:1, 1:2, 1:1:1, The optimum conditions for the membrane area of the separator were derived by changing to five of 1:2:1 and 1:2:2. 3 stage separation membrane process of 30 Nm3/h was installed to reflect the optimum condition of 2 Nm3/h, and biomethane production of 98% or more of methane concentration was demonstrated. As a result of the operation of the 2 Nm3/h refining device, the methane recovery rate at the 98% methane concentration was 95.6% when the membrane area ratio was 1:1 as the result of the two-stage operation of the separator, and the recovery rate of methane at 1:2 was increased to 96.8%. The methane recovery rate of the membrane three-stage operation was highest at 96.8% when the membrane area ratio was operated at 1:2:1. The carbon dioxide removal rate was 16.4 to 96.4% and the 2:2 to 95.7% film area ratio in the two-step process. In the three-step process, the film area ratio was 1:2:1 to 95.4%, and the two-step process showed higher results than the three-step process. In the 30 Nm3/h scale biogas purification demonstration operation, the methane concentration after purification was 98%, the recovery rate of methane was 97.1%, the removal rate of carbon dioxide was 95.7%, and hydrogen sulfide, the cause of corrosion, was not detected, and the membrane area ratio was 1:2:1 demonstration operation, biomethane production with a methane concentration of 98% or higher was possible.