• Title/Summary/Keyword: Development Feasibility Analysis

Search Result 808, Processing Time 0.026 seconds

A Study on the Economic Feasibility of Developing Daisy Book Based Reading Assistive Device for People with Disabilities (장애인을 위한 데이지 도서 기반 독서보조기기 개발의 경제적 타당성 연구)

  • Lim, Soon-Bum;Park, Joo Hyun;Lee, Jong Woo;Yook, Juhye
    • Journal of rehabilitation welfare engineering & assistive technology
    • /
    • v.11 no.4
    • /
    • pp.279-285
    • /
    • 2017
  • In this study, feasibility analysis was performed by estimating the costs and effects of daisy reading auxiliary machine development project. The development cost of a Daisy player device, hardware/prototype and software, with only essential functions and with low price was estimated to be \307,101,664, and the production cost for a player was calculated to be \112,000. The development of Daisy viewer software and input/output assistive devices, application, was estimated to be \284,294,08, and an input/output device was set a price of \6,600. Based on these results, we looked at the economic ripple effects on the people with disabilities by promoting daisy - reading assistive device development project. The results of this study could be used to determine whether the project is to proceed. It is expected that it provides valuable information to actively cope with the changing business environment in the future.

Analysis on Economic Feasibility of Offshore wind power (국내 풍력발전의 경제성 분석에 관한 연구)

  • Shin, Youngeun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.149.2-149.2
    • /
    • 2011
  • This paper conducted an analysis of economic effects of offshore wind power in Korea with benefit/cost analysis. The existing feed-on tariff, which was too low to support wind power development, was recently replaced with a Renewable Portfolio Standard(RPS), effective from 2012. According to the new regulatory policy, The Korean government has announced a strategy to draw investments worth for offshore wind farms with a total capacity of 2.5 GW over the next eight years, which is expected the change of cost and benefit. After overview the offshore wind power development status, The effects on cost can be divided by economic, environmental and social factors. Each factor will be calculated and combined by both evaluating index and using Quantification methods. At the end, the implication for the evaluation of feasibility of offshore wind power of Korea will be done.

  • PDF

Financial Feasibility Analysis for the Development of Urban Telecommunication Facility Purpose Site (도심 통신기반시설용지의 개발을 위한 재무타당성 분석에 관한 연구)

  • Park, Kyungyong;Jeong, Moonoh;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.31-41
    • /
    • 2015
  • The telecommunication industry has been considered as a national fundamental infrastructure. However, due to the rapid evolution of technology and the change of industry market conditions, the telecommunication infrastructure needs no more huge space for facility and it leads its use to the mixed-use development based on private investment. This study intends to examine the financial feasibility of the development project for the optimal alternative use of telecommunication facility purpose site as a case study based on two types: contributed acceptance and multi-level designation. The NPA and IRR has been analyzed by the simulation of stochastic variables including rent price and its variation rate, vacancy rate, construction cost, capitalization rate and discount rate. The research finding indicates that the two types of development are satisfied with the financial feasibility and it is noteworthy that the rent price turns out to be the most critical factor for the project. Accordingly, it is expected that these research finding can be applied for providing the solid cases of financial feasibility analysis for the development project in limited use of telecommunication facility purpose site.

Improvement of Total Floor Area Planning for the Feasibility Study on the Establishment of a General Hospital - Focused on Pre-feasibility Study of KDI Case Analysis (종합병원 건립 타당성 조사의 연면적 계획 개선방안 - 공공의료기관 재정사업 예비타당성조사 사례를 중심으로)

  • Cho, Junyoung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.30 no.1
    • /
    • pp.37-44
    • /
    • 2024
  • Purpose: The planning of medical facilities involves formulating a comprehensive medical basic plan, translating it into spatial dimensions through a space program. Feasibility assessment often relies on empirical methods like floor area per bed. However, with the shift towards specialized medical concepts, proportional scaling to bed numbers is challenging. This study proposes scale planning improvements during the feasibility assessment stage for comprehensive hospitals, analyzing cases using area determination factors and standard areas based on medical resources. Methods: The Korean Development Institute's Public Investment Management Center (KDI) identified issues in the scale determination of medical facilities in the Preliminary Feasibility Study Guidelines and investigated alternative approaches for determining the scale of a case that passed the preliminary feasibility study in 2019. The study assessed the feasibility of applying individual factors to determine not only the number of beds but also the scale at the sector and department levels. Additionally, a statistical analysis was conducted to examine the correlation between the total number of beds and various area determination factors. Results: Results suggest a strong correlation between total beds and major equipment needs, but in hospitals with <500 beds, this correlation weakens. Ward section scale is better calculated per ward type, not just total beds. Outpatient department scale depends on specialists, influencing treatment room numbers. Medical personnel play a crucial role in determining the scale of sections like rehabilitation therapy rooms, operating rooms, dialysis rooms, and overall facility scale.

A Case Study for the Economic Feasibility Model and Analysis of a GDHS Given Geothermal Temperature (기대지열온도하에서 GDHS의 경제성분석 사례연구)

  • Yang, Moon-Hee;Kim, Tai-Yoo;Lee, Sang-Kyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.1
    • /
    • pp.115-127
    • /
    • 1997
  • A GDHS(Geothermal District Heating System) is a heating system supplying a group of districts with heat extracted from geothermal sources. The advantages of GDHS include saving fuel consumption as well as reducing air pollution. This paper presents a case study for the economic feasibility model and analysis of a GDHS with which central/individual heating systems are replaced. Configuring to a simplified GDHS which consisits of subsurface systems, surface systems, and transmission/distribution systems, we find out the properties of the system and the model parameters affecting the initial investment/operating costs in order to develop a classical economic feasibility model given geothermal temperature. Based on our model parameter space, we analyzed the geothermal development project of the Jejoo Island probabilistically given prior information such as the expected geothermal power, the demand size and the length of transmission/distribution pipes.

  • PDF

The Feasibility Study of Offshore Outsourcing in Korea SI Industry: Comparison between India and China case (한국 SI 산업의 Offshore 아웃소싱 가능성 검토: 인도/중국 사례 비교)

  • Yoo, Jin-Ho;Kwon, Yong-Min;Yi, Yoon-Sung
    • Journal of Information Technology Services
    • /
    • v.4 no.2
    • /
    • pp.135-144
    • /
    • 2005
  • The plenty of successful cases of Multi-national companies has been realized benefits of offshore outsourcing in particular "cost savings" from offshore IT outsourcing services, such as call center, software development, IT support and maintenance etc. A few Korean companies recently started to make the feasibility study of offshore IT outsourcing to catch up with the global trend. The objective of this study is to present the feasibility of offshore IT outsourcing of Korean companies through the analysis of pilot projects results between Indian and Chinese companies. The analysis include key elementsof cost, productivity, quality, practical issues as well as Gartner's framework, "AD Sourcing Cost Model", composed of 7 model factors. The findings of this study are not limited to understand offshore IT outsourcing but also provide useful guidelines covering wide range from the theoretical framework of selecting suitable offshore partner.

Analysis of the Economic Feasibility of a Monorail on Mt. Bomun on Daejeon (신교통수단 모노레일의 관광지 도입에 대한 경제적 타당성 분석 -보문산 일대를 중심으로-)

  • Kim, Myungsoo
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.3
    • /
    • pp.226-232
    • /
    • 2013
  • Recently, CO2 reduction policies are being promoted as parts of ESSD(Environmentally Sound and Sustainable Development), and many local governments are interested in monorails as a new means of transport. Here we report on a feasibility study for introducing a monorail system by considering the travel demands in the Mt. Bomun area in Daejeon, based on the area's population. The feasibility of a monorail system on Mt.Bomun varies with respect to the demographic scale, mode shares, and operational distances. The strategies introduced here will help identify any tourist spots where local governments are trying to introduce monorail systems as a new system of transit.

GIS Analysis on Siting Strategy of Offshore Wind Farm (해상풍력단지 입지전략 GIS 분석)

  • Song, Kyu-Bong;Kim, Hyun-Goo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.460-462
    • /
    • 2009
  • This study has analyzed the scale, location, resource potential and feasibility of offshore wind farm scientifically and systematically based on the national wind map and GIS (Geographic Information System). For long-term wind power development, this study pursues siting strategy building, selection of target area and deciding development priority as well as the presenting a basis for assessment that are necessary for policy decision making by making theme layers under GIS environment. According to the analysis after organizing technological development by stages, even if only the most suitable sites are developed among the area of offshore wind farm candidates that can be developed under the current technological standard, it has been evaluated as being able to develop about 3 times of the wind power dissemination target until 2012. It is expected that about 5% of territorial water area can be developed in a short-term future while the southern offshore area possessing relatively favorable wind resource than the western offshore has been identified as the most feasible site. While about 23% of territorial water area has been classified as potential area for offshore wind farm development in a long-term future, even Jeju Island and offshore of Ulsan possessing excellent wind resource have been analyzed as feasible sites. The feasibility assessment of offshore wind farm development established by this study is expected to assist national strategy building for accomplishing the wind power dissemination target.

  • PDF

A Note on the Economic Rationale for the Development of the Korean Operational Oceanographic System (운용해양시스템 구축의 경제적 의의)

  • Lee, Joon-Haeng;Noh, Yong-Hwan
    • Ocean and Polar Research
    • /
    • v.32 no.3
    • /
    • pp.255-265
    • /
    • 2010
  • This study evaluated economic feasibility and provided rationale for the development of the Korean Operational Oceanographic System (KOOS). KOOS is supposed to be established for the preservation and management of marine environments, and for the safety of ocean activities. Economic issues associated with operational oceanographic systems are discussed. During the operational period of KOOS associated with conservative small-input scenarios, and according to the macroeconomic inputoutput analysis, the system was estimated to generate 8.3 times its actual proposed economic investment (about KRW 327.7 billion). Other rationales that cannot be easily quantified were also discussed.

A Study Factor of the Feasibility Analysis in Urban Redevelopment Project (도심재개발사업의 타당성 분석 요인에 관한 연구)

  • Joo Jae-Young;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.347-352
    • /
    • 2001
  • Midtown redevelopment project is intended for restoration of city's declining function and promoting the utilization of land, but several factors such as participants of different nature in the project, different expectation level from them, high land value accompanied by geographical location as a city and the demand for high density development, nature of business that requires long duration to complete and vast amount of fund contribute to complication of feasibility study. Due to these characteristics of midtown redevelopment project, consideration of various factors involved with it and reliable analysis are required but suggested complication of feasibility study is causing halt in project, preventing from launching it and delaying it. So, this study was undertaken to be a help to feasibility study of midtown redevelopment project by suggesting main elements that need to be dealt with analysing questionnaire survey result attained from related expert in this area and arranging total 45 factors essential to feasibility study for midtown redevelopment project that can be classified into 5 main category such as economic/financial factors, legal/institutional factors, market related factors, technical factors and conflict related factors through documental investigation, case study and interview with specialist concerned.

  • PDF