• 제목/요약/키워드: Development Effort Estimation

검색결과 90건 처리시간 0.022초

Remaining service life estimation of reinforced concrete buildings based on fuzzy approach

  • Cho, Hae-Chang;Lee, Deuck Hang;Ju, Hyunjin;Kim, Kang Su;Kim, Ki-Hyun;Monteiro, Paulo J.M.
    • Computers and Concrete
    • /
    • 제15권6호
    • /
    • pp.879-902
    • /
    • 2015
  • The remaining service life (RSL) of buildings has been an important issue in the field of building and facility management, and its development is also one of the essential factors for achieving sustainable infrastructure. Since the estimation of RSL of buildings is heavily affected by the subjectivity of individual inspector or engineer, much effort has been placed in the development of a rational method that can estimate the RSL of existing buildings more quantitatively using objective measurement indices. Various uncertain factors contribute to the deterioration of the structural performance of buildings, and most of the common building structures are constructed not with a single structural member but with various types of structural components (e.g., beams, slabs, and columns) in multistory floors. Most existing RSL estimation methods, however, consider only an individual factor. In this study, an estimation method for RSL of concrete buildings is presented by utilizing a fuzzy theory to consider the effects of multiple influencing factors on the deterioration of durability (e.g., concrete carbonation, chloride attack, sulfate attack), as well as the current structural condition (or damage level) of buildings.

컴포넌트 개발 툴을 사용한 소프트웨어 개발 노력도에 관한 연구 (A Study on Effort Estimation Model in Software Development Using Component Tools)

  • 서정석;김승렬
    • 한국산업정보학회논문지
    • /
    • 제5권3호
    • /
    • pp.18-29
    • /
    • 2000
  • 결과적으로 컴포넌트 기반의 개발 방법은 새로운 개념의 비용 예측 모델이 요구되고 있으며 외국의 경우 이에 대한 연구가 활발히 진행되고 있다. 그러나 외국의 비용산정 모형을 그대로 적용하기에는 국내 소프트웨어 사용환경에 적절치 못할 것으로 판단되며 또한 축적된 개발 관리 자료의 부족으로 인하여 사용이 매우 제한적인 실정이다. 본 연구는 컴포넌트 환경의 비쥬얼 개발 툴을 기반으로 하는 소프트웨어 개발을 전제로 개발비용의 핵심인 노력도(Person Month)를 산정하는 모델을 제안하고자 한다.

  • PDF

공수 예측 모델 요도를 위한 자료 흐름도의 실험적 평가 (Experimental Estimation of Data Flow Diagram for Man/Month Prediction Model Derivation)

  • 김명옥;백청호;양해술
    • 한국정보처리학회논문지
    • /
    • 제2권1호
    • /
    • pp.34-44
    • /
    • 1995
  • 소프트웨어 개발자와 사용자에게 직면한 가장 중요한 문제는 프로그래밍 시스템 의 크기와 개발 노력의 예측이라고 할 수 있다. 본 논문에서는 자료 흐름도, 자료 사 전, 소단위 명세서로 구성된 구조화 명세서에 관한 각각의 특성을 정의하고, 구조화 명세서의 정량적인 평가 요소를 프로그램 메트릭스에 적용하였다. 또한 구조화 명세 서를 구성하는 자료 흐름도에 관해서는 정량적인 평가 실험을 하였다. 그 결과 상위 공정의 분석 단계에서의 산출물에 의한 하위 공정에 관한 공수 예측 모델을 제안한다.

  • PDF

택지개발사업의 개발이익 추계에 대한 연구 (A Study of Development Gains Estimation in Building Land Development Projects)

  • 김용창
    • 한국지역지리학회지
    • /
    • 제12권5호
    • /
    • pp.595-613
    • /
    • 2006
  • 개발이익은 토지소유자의 노력과 투자를 동반하지 않은 토지가치의 증가를 일반적으로 지칭하며, 개발이익 환수는 이러한 유형의 토지가치 증가는 공유하여야 한다는 사고를 전제하고 있다. 이러한 개발이익의 발생메커니즘, 향유 주체 및 환수의 경제적 효과를 둘러싸고 많은 논쟁이 전개되었다. 정책대상으로서 개발이익은 토지가치세와 같은 조세형평성의 강화, 도시하부구조 건설재원조달, 토지이용 및 공간계획 관리 목적으로 활용하고 있다. 그러나 개발이익에 대한 이러한 이론적 정책적 논의의 발전을 위해서는 개발이익 발생규모와 특성을 구체적으로 규명하는 작업이 필요하다. 본 연구에서는 택지개발촉진법 도입 이후 주도적으로 택지개발사업을 수행하고 있는 한국토지공사와 대한주택공사의 1995년 이후 전체 204개 개발사업지구를 대상으로 화폐의 시간적 가치를 고려한 할인현금흐름분석법으로 개발이익을 추계하고 그 특성을 밝힌다.

  • PDF

주성분분석을 이용한 소프트웨어 개발노력 추정능력 향상 (Improving Estimation Ability of Software Development Effort Using Principle Component Analysis)

  • 이상운
    • 정보처리학회논문지D
    • /
    • 제9D권1호
    • /
    • pp.75-80
    • /
    • 2002
  • Putnam은 소프트웨어 프로젝트에 참여하는 인력이 Rayleigh 분포를 따르는 SLIM 모델을 제시하였다. 이 모델에서 인력분포를 얻기 위해서는 총 개발노력과 개발 난이도를 추정해야 한다. 프로젝트 개발에 참여할 것인지 여부를 결정하기 위해서는 소프트웨어 생명주기의 초기단계에서 이 모수들을 보다 적확히 추정하는 것이 필요하다. Putnam은 시스템 속성들 중 강한 상관관계가 있는 변량을 제거하고 나머지 변량들만으로 총 개발노력과 개발 난이도를 추정하였다. 그러나 통계적 방법에 따라 변량들이 다르게 선택되며 모델의 성능에 차이가 발생한다. 본 논문은 Putnam 방법 대신 주성분분석을 이용하여 최적의 시스템 속성을 선택하였다. 모델의 성능분석 결과 주성분분석 방법이 Putnam의 방법보다 9.85% 성능향상을 보였다. 또한, 제안된 모델은 단순하고 쉽게 구현할 수 있다.

Computer-aided approach of parameters influencing concrete service life and field validation

  • Papadakis, V.G.;Efstathiou, M.P.;Apostolopoulos, C.A.
    • Computers and Concrete
    • /
    • 제4권1호
    • /
    • pp.1-18
    • /
    • 2007
  • Over the past decades, an enormous amount of effort has been expended in laboratory and field studies on concrete durability estimation. The results of this research are still either widely scattered in the journal literature or mentioned briefly in the standard textbooks. Moreover, the theoretical approaches of deterioration mechanisms with a predictive character are limited to some complicated mathematical models not widespread in practice. A significant step forward could be the development of appropriate software for computer-based estimation of concrete service life, including reliable mathematical models and adequate experimental data. In the present work, the basis for the development of a computer estimation of the concrete service life is presented. After the definition of concrete mix design and structure characteristics, as well as the consideration regarding the environmental conditions where the structure will be found, the concrete service life can be reliably predicted using fundamental mathematical models that simulate the deterioration mechanisms. The prediction is focused on the basic deterioration phenomena of reinforced concrete, such as carbonation and chloride penetration, that initiate the reinforcing bars corrosion. Aspects on concrete strength and the production cost are also considered. Field observations and data collection from existing structures are compared with predictions of service life using the above model. A first attempt to develop a database of service lives of different types of reinforced concrete structure exposed to varying environments is finally included.

소프트웨어 비용추정 모형에 관한 소고

  • 김인수;이대기
    • ETRI Journal
    • /
    • 제9권3호
    • /
    • pp.139-156
    • /
    • 1987
  • The problems in software cost management are well known. Cost estimates are too low. Software development projects frequently have cost overruns, which are due to poor estimates. A fair amount of work have been done toward developing cost estimation models. These models vary in their outputs (e. g., total cost, manning schedule) and in the factors used to calculate their estimates. They also vary with regard to the type of formula, parameters, use of previous data, and staffing considerations. This paper will distinguish them by the type of formula they use to calculate total effort and staffing level, and will discuss enough models to demonstrate the characteristics of each model category.

  • PDF

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

산업별 특성에 따른 소요공수 규모 산정 모델 연구 (A Study on the Scale Effort Estimation Model based on Industry Characteristics)

  • 곽송해;박구락;김동현
    • 디지털융복합연구
    • /
    • 제14권11호
    • /
    • pp.233-240
    • /
    • 2016
  • 정보시스템 개발 프로젝트는 다양한 리스크 요소로 인하여 많은 비용이 발생하는 구조를 가지고 있다. 일반적으로 정보시스템 소프트웨어 프로젝트가 납기 내에 성공적으로 이루어질 확률은 매우 낮아 프로젝트 실패를 막는 주요한 요인인 정형화된 비용에 대한 예측이 필요하다. 그러나 대부분의 프로젝트 규모 산정 시 산정 기준의 객관성이 부족하며, 프로젝트 수행 중 베이스라인의 관리가 제대로 이루어지지 않고 있는 실정이다. 이에 본 논문에서는 정보시스템 개발 프로젝트 초기에 현장에서 실용적이지 못한 기법의 한계를 극복하고자 방법론 기반으로 개발에 소요되는 공수를 산정하는 모델을 제안한다. 이러한 융복합적인 제안 모델을 통하여 정보시스템 개발 사업에서 소요되는 공수와 비용을 추정하는데 간단하게 활용할 수 있는 도구가 될 것으로 기대된다.

RBF망을 이용한 소프트웨어 유지보수 비용 추정 (Software Maintenance Cost Estimation using RBF Network)

  • 박주석;정기원
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제31권5호
    • /
    • pp.555-562
    • /
    • 2004
  • 소프트웨어 회사들은 새로운 개발보다는 기존 프로젝트의 유지보수와 성능향상 프로젝트를 보다 많이 수행한다. 기존의 비용 추정 모델들은 유지보수 프로젝트들에 적용할 수 있지만, 유지보수 분야에 적용시키기 위해서는 변경이 필요하다. 본 논문은 개발 프로젝트와 유지보수 프로젝트의 기능점수 계산방법을 분류하고 ISBSG의 밴치마킹 자료를 회귀 분석한 결과를 토대로 유지보수 프로젝트의 비용을 측정할 수 있는 방법을 제안하였다. 먼저, ISBSG 자료를 소프트웨어 비용에 영향을 미치는 요소인 프로그램 추가, 변경과 삭제 3가지 요소의 8가지 중에서 실제 유지보수가 나타나는 4가지 그룹으로 분류하였다. 그리고, 그룹별로 통계적 모델과 RBF 망(Radial Basis Function Network)을 이용한 모델을 개발하여 각각의 성능을 분석 평가한 결과 RBF 망이 통계적 모델보다 좋은 성능을 보였다.