• 제목/요약/키워드: Detention Basins

검색결과 22건 처리시간 0.036초

토성별 특정 수심의 저류된 유출수의 지하침투 소요시간 산정에 관한 연구 -Green-Ampt 방정식 적용을 중심으로- (Estimation of Ponding Times for various Soil Textures and Ponding Depths -Using the Green-Ampt Infiltration Model-)

  • 권경호;안동만
    • 한국조경학회지
    • /
    • 제27권5호
    • /
    • pp.170-180
    • /
    • 2000
  • The surface-drainage system, which consists of bio-swale and detention-infiltration Basins and carries out the function of temporary detention-infiltration of runoff, is defined as the "natural drainage system". It is an environmentally sound and economically beneficial practice to reduce run-off by retaining it in swales as much as possible and letting run-off infiltrate into the ground. In order to estimate appropriate capacity of swales, it is necessary to know how long will it take for certain depths of water to infiltrate. The ponding times, or infiltration times, of various depths and of various soil textures, could be estimated with the Green-Ampt Infiltration Model. Included soil textures are loamy sand, sandy loam, loam, silty loam, sandy clay loam and clay loam. Ponding depths are from 10cm to 100cm intervals. Newton-Raphson method is used for the solution of the Green-Ampt equation by a computer program. The computer program was written with the FORTRAN Developer 4.0 v.. Selected ponding depth is acceptable when the sum of the ponding time and the breeding time of mosquitoes is less than the tolerance period of innundation of grasses and trees.and trees.

  • PDF

소유역에서 홍수조절용 펌프 및 유수지 규모의 결정에 관한 연구 (A Study on Determination of Capacity for Pump and Detention Pond in Small Basins for Flood Control)

  • 안태진;박종윤;류희정;김중훈
    • 한국수자원학회논문집
    • /
    • 제36권3호
    • /
    • pp.385-398
    • /
    • 2003
  • 내배수시설계획시 최대저류비에 의한 유수지 규모의 결정 방법은 이전 연구자에 의하여 제시된 바 있다. 본 연구에서는 동두천시 11개 소규모 내배수시설을 선정하여 분석한 결과, 배수면적이 작고 펌프기능이 강화된 내배수 시설에서는 강우지속기간별 우수지의 저류비의 차이는 미미하므로 최대저류비에 의한 조정지 규모의 결정은 무리가 있음을 알 수 있었다. 또한 최대저류비에 의하여 결정된 조정지 용량을 펌프에 의하여 배제되는 시간은 펌프의 허용시동간격보다 짧은 경우도 있어 펌프의 빈번한 작동을 초래한다. 그러므로 조정지는 펌프의 빈번한 작동에 의한 펌프 고장의 가능성을 피할 수 있는 규모로 결정되어야 한다. 다양한 펌프용량을 적용하여 분석한 결과, 소유역에서도 조정지의 기능이 강화된 내수배제시설에서는 최대저류비를 기준으로 한 조정지 용량의 결정은 펌프운영 측면에서 타당함을 알 수 있었다. 따라서 본 연구에서는 소규모 배수구역에서 조정지용량의 결정시 펌프의 계획배수량과 유수지의 용량에 따른 펌프의 시동빈도를 반영하여 기존의 최대저류비에 의한 방법을 개선한 방안을 제시하였다. 또한 유수지 규모와 펌프용량의 관계를 간단한 선형계획모형으로 분석한 결과, 종래의 유수지 홍수추적에 의한 유수지 용량 결정은 도시지역의 내배수시설 계획에만 타당함을 알 수 있었다.

BASINS/WinHSPF를 이용한 남한강 상류 유역의 비점오염원 저감효율평가 (A Study on BASINS/WinHSPF for Evaluation of Non-point Source Reduction Efficiency in the Upstream of Nam-Han River Watershed)

  • 윤춘경;신아현;정광욱;장재호
    • 한국물환경학회지
    • /
    • 제23권6호
    • /
    • pp.951-960
    • /
    • 2007
  • Window interface to Hydrological Simulation Program-FORTRAN (WinHSPF) developed by the United States Environmental Protection Agency (EPA) was applied to the upstream of Nam-Han river watershed to examine its applicability for loading estimates in watershed scale and to evaluate non-point source control scenarios using BMPRAC in WinHSPF. The WinHSPF model was calibrated and verified for water flow using Ministry of Construction and Transportation (MOCT, 3 stations, 2003~2005) and water qualities using Ministry of Environment (MOE, 5 station, 2000~2006). Water flow and water quality simulation results were also satisfactory over the total simulation period. But outliers were occurred in the time series data of TN and TP at some regions and periods. Therefore, it required more profit calibration process for more various parameters. As a result, all the study was performed within the expectation considering the complexity of the watershed, pollutant sources and land uses intermixed in the watershed. The estimated pollutant load for annual average about $BOD_5$, T-N and T-P respectively. Nonpoint source loading had a great portion of total pollutant loading, about 86.5~95.2%. In WinHSPF, BMPRAC was applied to evaluate non-point source control scenarios (constructed wetland, wet detention ponds and infiltration basins). All the scenarios showed efficiency of non-point source removal. Overall, the HSPF model is adequate for simulating watersheds characteristics, and its application is recommended for watershed management and evaluation of best management practices.

수질오염총량관리제하에서 친환경 개발사업을 위한 자연형 비점저감시설의 규모 산정 (Determination of Detention Basin Size for NPS Control in TMDL Area)

  • 정용준;이은주;이소영;임경호;김이형
    • 한국습지학회지
    • /
    • 제9권2호
    • /
    • pp.1-8
    • /
    • 2007
  • 최근 환경정책의 변화는 수질오염총량관리제 및 비점오염원관리로 요약된다. 이는 과거 30년 동안의 급격한 환경기술의 발전에도 불구하고 상수원수인 수질의 악화에 기인한다. 수질오염총량관리제란 환경시설에서의 농도규제가 아닌, 하천에서의 비점오염원을 포함한 총량규제를 위한 제도로 점오염원관리와 더불어 비점오염원 관리가 필수적으로 요구된다. 비점오염원이란 각종 토지이용을 의미하며, 개발사은 비점오염원의 부하량 증대에 큰 영향을 끼치는 원인이다. 이에 개발사업에 따른 비점오염원을 제어하기 위해서 비점저감시설등의 설치가 의무화 되고 있다. 비점저감시설 중 자연형 비점관리시설등의 규모산정에 관한 내용은 환경부에서 제시하고 있으며, 이에 관한 규정에서 강우량 해석을 기초로 하여 시설의 규모를 산정할 것을 요구하고 있다. 본 연구에서는 리조트 스키장 개발사업에서 발생 가능한 비점오염물질을 처리하기 위한 자연형 비점오염물질관리시설인 저류지의 규모를 산정하기 위하여 최근 5년간 및 10년간의 강우사상을 분석하였다. 강우량 해석을 통하여 적정 처리를 위한 강우량을 해석한 결과, 적정 저류지 용량은 누적강우량 기준으로 7.4mm가 가장 경제적인 것으로 나타났다.

  • PDF

저류지 예비설계에 관한 비교연구 (Comparative Study on Preliminary Design of Detention Basins)

  • 박민규;유철상;박창열
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.383-387
    • /
    • 2007
  • 본 연구에서는 저류지 예비설계를 위해 제안된 다양한 모형의 수문학적 특성을 비교하고, 재해영향평가 실무지침서 등과 같은 국내 설계기준에 의하여 설계된 저류지 용량을 기준으로 저류지 홍수조절용량 결정의 적정성을 검토하였다. SCS 모형 등 총 9가지 모형을 대상으로 비교한 결과 Wycoff and Sing 모형, Baker 모형, Kessler and Diskin 모형과 Currey and Akan 모형 4가지의 적용결과와 국내 방식으로 산정된 저류지 용량의 상관성은 89.7%로 높게 나타났다. 또한 홍수조절용량 $15,000m^3$이하에서 특히 상관성이 높게 나타나 상기 모형들을 소규모 저류지 시설을 계획하기 위한 초기 가정치 또는 기존에 설치된 저류지 시설들의 용량 평가목적으로 활용할 수 있을 것으로 판단되었다. 또한, 국내에서 주로 설치되고 있는 저류지의 특성을 반영하여 추가로 적용성이 높은 방법을 도출할 경우 행정계획단계의 사전재해영향성검토나 소규모 개발사업 등에서 저류지의 홍수조절용량의 예비설계 목적으로 활용할 수 있으리라 판단된다.

  • PDF

산지형 하천의 토양침식 및 토사유출량 산정 (Estimation of Soil Erosion and Sediment Yield in Mountainous Stream)

  • 고재욱;양성기;양원석;정우열;박철수
    • 한국환경과학회지
    • /
    • 제22권5호
    • /
    • pp.599-608
    • /
    • 2013
  • Jeju island, which is located along the moving path of typhoon, suffers from flooding and overflow by torrential rain. So abrupt runoff occurring, damages of downstream farm field and shore culturing farms are increasing. In this study, Oaedo stream, one of the mountainous streams on Jeju island, was selected as the basin of study subject and was classified into 3 sub-basins, and after the characteristics of subject basin, the soil erosion amount and the sediment delivery of the stream by land usage distribution were estimated with the use of SATEEC ArcView GIS, the sediment yield amount of 2000 and 2005 was analyzed comparatively. As a result of estimating the sediment yield amount of 2000, the three sub-basins were respectively 12,572.7, 14,080 and 157,761 tons/year. and sediment yield amounts were estimated as 35,172.9, 5,266 and 258,535 tons/year respectively in 2005. The soil erosion and sediment yield amount of 2005 using single storm rainfall were estimated high compared with 2000, but for sub-basin 2, the values rather decreased due to changes in land use, and the land coverage of 2005, since there are many classifications of land usage compared with 2000, enabling to reflect more accurate land usage condition, could deduce appropriate results. It is anticipated that such study results can be utilized as basic data to propose a direction to predict the amount of sediment yield that causes secondary flooding damage and deteriorates water quality within detention pond and grit chamber, and take action against damages in the downstream farm field and shore culturing farms.

토사유출 방지용 침사지 적정규모 설정방안에 관한 연구 -목포시 부주산을 사례로- (A Study on Establishing Optimum Scale of Sediment Basin for Preventing the Outflow of Sediment - In the case of Buju Mountain in Mokpo city, Korea -)

  • 우창호;황국웅
    • 한국조경학회지
    • /
    • 제26권4호
    • /
    • pp.59-69
    • /
    • 1999
  • This study examines the existing theories related to detention basin and embodies the calculation process of sediment basin. It investigated the scale of sediment basin by actual measurement at Buju Mountain, Mokpo city which causes the environmental problems like erosion and outflow of sediment due to the excessive development, finds the problems of existing sediment basin by applying and analyzing the physical factors which affect the execution of sediment basin using GIS as the method establishing the scale of sediment basin embodied in this study and then suggests the oteimum scale. Comparing the surface area of the existing sediment basin and of the required one, all of the surface areas of the existing sediment basins were smaller than those of the required one. Therefore, it can be expected that the trap efficient of sediment will be declined. The required one. Therefore, it can be expected that the trap efficient of sediment will be declined. The required minimum depth was fully satisfied, but it is analyzed that the volume of sediment basin will affect the neighboring environment because it can not accomodate the inflow discharge volume except sediment basin C. It is consistent with the actual situation which causes a serious environmental problem due to the overflow of sediment basin during the heavy storm event except sediment basin C and also it verifies the validity of calculation process of establishing optimum sediment basin suggested in this study.

  • PDF

소양강댐 유역의 오염부하량 산정을 위한 BASINS/WinHSPF 적용 (Application of BASINS/WinHSPF for Pollutant Loading Estimation in Soyang Dam Watershed)

  • 윤춘경;한정윤;정광욱;장재호
    • 생태와환경
    • /
    • 제40권2호
    • /
    • pp.201-213
    • /
    • 2007
  • 본 연구에서는 북한강 상류 지역인 소양강댐 유역에 BASINS/WinHSPF모델을 적용하였다. WinHSPF는 도시와 농촌지역 등이 혼재된 토지이용형태를 보이는 유역에 적용하기 적합한 모델로서, 산림이 대부분인 소양강댐 유역의 유출량 및 수질을 모의하고, 유역의 오염부하량을 분석하였다. 또한, 유역관리를 위해 인공습지와 저류지를 설치하였을 경우 WinHSPF의 Best Management Practice Evaluation(BMPRAC)을 통한 오염부하 삭감량을 산정하였다. WinHSPF 모델을 이용하여 유출량은 2000년부터 2004년까지, 수질 항목은 1990년부터 2004년가지 모의하였다. 모델 보정 결과 유량의 변화는 인북천, 북천, 내린천 세 곳 모두 강수량의 변화와 일치하여 변화하는 경향을 나타내고 있었고 모의치가 실측치를 대체적으로 잘 반영하였지만 유출량이 피크인 경우에 실측지에 비해 과소평가 되는 경향을 나타내었다. 이는 각 소유역에서 발생하는 강우량을 이용하여 모델을 구동한 것이 아니고, 일부 국한된 기상관측소의 자료만을 이용하였기 때문에 지역적인 차이가 나타났거나, 수위-유량 곡선을 통해 유출량을 산정하는 과정에서 수위가 높은 시기에 유량이 과도하게 계산된 경우가 있기 때문이라 판단된다. 수질항목은 온도, DO, BOD의 경우 예측값이 연중 수질변화패턴을 잘 반영하였다. TN과 TP는 모의치가 다소 과대, 과소평가되는 경향이 있었는데, 향후 보다 효율적인 유역관리를 위한 모델의 활용을 위해서는 정확하고 자세한 기상자료와 수문자료가 뒷받침되어야 하며, 실측지점의 특성을 대표할 수 있는 수질 및 유출량 측정이 이루어져야 할 것이다. 2000년부터 2004년가지 소양강댐 유역의 오염부하량은 강우량이 가장 논은 2003년에 BOD, TN, TP가 각각 4,109,674 kg $yr^{-1}$, 6,457,315 kg $yr^{-1}$, 104,186 kg $yr^{-1}$로 가장 높게 나타났다. 월별 부하량은 7월부터 9월에 배출되는 양이 BOD는 약 63.5%, TN 약 64.1%, TP는 약 64.4%를 차지하여, 강우 시 유출량이 증가하면 부하량도 비례하여 증가는 것으로, 강우 유출량에 많은 영향을 받고 있는 것으로 나타났다. 인북천, 북천, 내린천, 소양강 유역에서 BOD, TN, TP의 오염부하량은 약 98% 이상이 비점오염원으로부터 발생하는 것으로 분석되었는데, 이는 유역의 대부분이 산지와 농경지로서 산업시설과 같은 점오염원이 적고,강우 시 산림지역 및 농경지에서 많은 양의 비점오염원이 발생하기 때문으로 판단된다. WinHSPF모델의 BMPRAC를 이용하여 Scenario를 적용한 결과 부하량 삭감율은 저류지를 설치한 scenario 2가 가장 많이 감소하는 것으로 나타났다. 강우기(7${\sim}$9월)의 부하량 삭감율은 BOD의 경우 Scenario 1-1(처리용량 1,500 $m^3$ $day^{-1}$인 인공습지), scenario 1-2 (처리용량 1,000 $m^3$ $day^{-1}$인 인공습지), scenario 2(면적 4.2ha인 저류지)가 각각 연평균 6.9%, 4.8%, 7.1%의 감소를 보였다. TN은 4.7%, 3.4%, 13.4%의 삭감율을 나타내었으며, TP는 5.6%, 3.9%, 7.3%의 삭감율을 나타내었다. 본 연구에서는 적용하지 못하였으나, 인공습지와 저류지의 적절한 연계시스템을 적용한다면 저감시설 설치 부지면적과 비용의 감소뿐만 아니라 보다 효과적인 수질개선효과를 가져올 수 있으리라 판단된다.

제주도 홍수유량 계측 및 저류지 홍수위 저감효과 분석 (Analysis of the Flood Discharge Measurement and Flood Stage Reduction Effect by the Stream Detention Basins)

  • 김동수;양성기;류권규;강명수;정우열;이준호
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2012년도 학술발표회
    • /
    • pp.170-170
    • /
    • 2012
  • 제주도는 최근 기후변화에 의한 태풍의 증가로 집중호우의 빈도가 지속적으로 증가하고 있는 추세이고 지난 태풍 나리로 인해 발생한 제주시에서의 극심한 재해로 태풍 시 홍수 유량 관측 및 저류지의 건설로 인한 저류효과의 분석에 많은 관심이 집중되고 있다. 제주대학교 주관의 제주도 물순환 해석 및 수자원 관리체계 구축 사업단은 제주도 환경에 적합한 유량조사기법을 적용 및 개발 중에 있으며 특히 집중 호우 시 유량 계측을 비롯한 제주 유량 자료 확보 방안에 대해 연구를 수행하고 있다. 제주도 연구단은 지난 여름 태풍 무이파 때 제주시 하천의 제 2동산교에서 다양한 계측 방식을 활용하여 유량관측을 성공적으로 수행하였다. 태풍 무이파는 강한 중형 태풍으로 제주도 산간 지역에 700mm 이상의 집중호우를 보여 제주 하천에 많은 양의 유출을 발생시키고 일부 재산 및 인명 피해를 발생시켰다. 홍수 유량의 계측은 지금까지도 최적화된 계측 방식이 확립되지 못했고 그 측정의 어려움과 계측기기의 한계로 봉부자 같은 전통적인 방식의 홍수유량 측정방식이 여전히 통용되고 있는 현실이다. 하지만 본 연구단은 최신 관측기법인 비접촉식의 표면영상유속계와 전자파표면유속계를 사용하여 전 강우 지속시간 동안 유량을 매 시간마다 관측하여 수문곡선을 완성하여 홍수 유량 계측의 효율성과 정확성을 높일 수 있었다. 계측 결과 홍수유출 시 한천 상류의 제 1,2 저류지가 가동되어 저류효과가 수문곡선에 반영되었음을 알 수 있었고 홍수 유출 시 나타나는 대표적인 특이 경향이 수위-유량곡선의 이격현상도 확인할 수 있었다. 따라서 홍수 유출은 단순히 수위 자료만으로는 부족하고 유속자료를 동시에 관측해야 정확한 계측치를 확보할 수 있음을 알 수 있다. 또한 최신 계측기기인 표면영상유속계와 전자파표면유속계의 유속 관측값의 상호비교도 실시하여 관측기기의 효율성을 검증하였다.

  • PDF

유지유량증가 방안에 따른 원주천 수질 및 어류서식환경 개선효과 (Effect on water quality and fish habitat improvement of Wonju Cheon by instream flow increasing)

  • 최흥식
    • 한국습지학회지
    • /
    • 제10권3호
    • /
    • pp.57-68
    • /
    • 2008
  • 현장관측에 기초한 원주천의 기준갈수량에 추가하여 수질향상과 어류서식환경의 개선을 위한 목표 유지유량을 산정하였다. 목표유지유량의 산정은 자연 생태적 기능, 친수환경, 경관을 고려한 수심과 유속을 기초로 하여 구간 또는 지점별 저수로폭을 감안하였다. 각 지점별 저수로 수면 폭에 따른 유속은 0.2m/s으로 하고 수심을 상류 0.1m에서 하류 0.3m까지로 하여 산정한 추가적 유지유량 확보량은 상류지점의 $0.03m^3/s$에서 하류지점의 $0.90m^3/s$이다. 목표한 유지유량의 확보를 위한 방안으로 하수도시스템의 개선에 의한 계곡수와 우수의 방류, 유역관리에 의한 기저유출 증가, 상류수원의 개발과 천변저류지 등을 검토하였다. 검토결과는 목표유량과 부합되는 $0.19m^3/s$에서 $3.42m^3/s$로 기준갈수량의 1.4배에서 2.5배 까지 늘릴 수 있는 가능성을 분석하였다. QUAL2E 모형의 적용을 통하여 유지유량 증가에 따른 BOD 수질개선효과를 확인하였다. 원주천 중류의 복원목표종을 갈겨니로 선정하고, 유지유량 증가에 따른 PHABSIM 모형에 의한 서식적합도는 현저히 향상되어 유량증대가 수질과 어류서식환경을 개선하는 것으로 나타났다.

  • PDF