• Title/Summary/Keyword: Design water level

Search Result 854, Processing Time 0.028 seconds

Centrifuge tests for simulating the behavior of CFRD with increasing water level (수위 상승에 따른 CFRD(콘크리트 표면차수벽형 석괴댐)의 거동 모사 원심모형시험)

  • Seo, Min-Woo;Im, Eun-Sang;Kim, Yong-Seong;Ha, Ik-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.784-793
    • /
    • 2006
  • As the number of CFRD constructions increases, the necessity of an accurate assessment on its behavior also has been increasing accordingly. The performance of concrete faced rockfill dam (CFRD) under different water levels is greatly concerned by dam engineers and designers in the world. However, domestic research on CFRD design and construction has yet been insignificant. This study deals with three centrifuge model tests, mainly investigates the deformation of the concrete faced slabs with different face slab stiffness under different water levels. The prototype of a centrifugal model dam is half size of domestic CFRD dam. Detailed material preparation, model design, model set-up, model instrumentation and testing procedures are presented. In order to simulate the prototype concrete faced slab, three kinds of thin fiberglass plates with different thickness was adopted in the three model tests. The water level control facility was specially designed for this experiment to control the water level rise and drawdown during centrifuge flight. Although most of the results from the three model tests are satisfactory, it is also required that the centrifuge test results should be compared with those of numerical analysis and field measurements to analyze the centrifuge test results more in detail.

  • PDF

Prediction of Water Level at Downstream Site by Using Water Level Data at Upstream Gaging Station (상류 수위관측소 자료를 활용한 하류 지점 수위 예측)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.28-33
    • /
    • 2020
  • Recently, the overseas construction market has been actively promoted for about 10 years, and overseas dam construction has been continuously performed. For the economic and safe construction of the dam, it is important to prepare the main dam construction plan considering the design frequency of the diversion tunnel and the cofferdam. In this respect, the prediction of river level during the rainy season is significant. Since most of the overseas dam construction sites are located in areas with poor infrastructure, the most efficient and economic method to predict the water level in dam construction is to use the upstream water level. In this study, a linear regression model, which is one of the simplest statistical methods, was proposed and examined to predict the downstream level from the upstream level. The Pyeongchang River basin, which has the characteristics of the upper stream (mountain stream), was selected as the target site and the observed water level in Pyeongchang and Panwoon gaging station were used. A regression equation was developed using the water level data set from August 22th to 27th, 2017, and its applicability was tested using the water level data set from August 28th to September 1st, 2018. The dependent variable was selected as the "level difference between two stations," and the independent variable was selected as "the level of water level in Pyeongchang station two hours ago" and the "water level change rate in Pyeongchang station (m/hr)". In addition, the accuracy of the developed equation was checked by using the regression statistics of Root Mean Square Error (RMSE), Adjusted Coefficient of Determination (ACD), and Nach Sutcliffe efficiency Coefficient (NSEC). As a result, the statistical value of the linear regression model was very high, so the downstream water level prediction using the upstream water level was examined in a highly reliable way. In addition, the results of the application of the water level change rate (m/hr) to the regression equation show that although the increase of the statistical value is not large, it is effective to reduce the water level error in the rapid level rise section. Accordingly, this is a significant advantage in estimating the evacuation water level during main dam construction to secure safety in construction site.

The Study on Hydraulic Model Experiment of Discharge Channel and Spillway (여수토 방수로의 수리모형검시에 관한 연구)

  • 김시원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.8 no.2
    • /
    • pp.1124-1140
    • /
    • 1966
  • 'This hydraulic experiment have been practised Juk an Reservoir spillway and discharge 'channel which the province Kyong Buk was constructed and designed U. hook, for seizing all state of hydraulic. As result of the experimellt planning and making the model test, it has gained the necessary data at the amendment, projection of the most rational and economical result. 1. Project (1) Experiment project....1/30 of the discharge (2) project flood....0.01945 $m^3$/sec (rapidly) 2. Design Experiment It were sighted the water level for the nine point (L. & R. sides of No. O, L. & R. of No.1, L. side of NO.2, NO.3, No. 4 and NO.5), but it appeared each other that the lowest water level was 0.63 m at spillway (No.5) and the highest water level 0.735m less than planning water level O.75 m at No. 0. It was regarded as the phenomena appearing the difference from the calculation of the rational formular and coefficient of discharge. 3. Experiment examine E. ${\circled1}$ As a table (2) it had not a difference in comparision with design and was some lower value than design experiment's. E ..${\circled2}$) !twas same table (3) in a consequence of Experiment contracted Rocky cutting. E.${\circled3}$. ${\circled4}$ It was done amend.ment Experiment by elevating G.H. in only control point, but was not sure result as a table (2)(3)(4), and so it was changed largely in ${\circled5}$ Experiment. E. ${\circled5}$ Increasing water level was understanded to be proportion to $V^2$ in consideration of centrifugal force in the curve part and showed velocity contracting in curve the effect order's being regular in consequence of 1/6 sloped extending G.H. attached from 5 No. 0 to 1. 50 m, to S No. 0+5m. (S; discharge channel number).

  • PDF

Investigation into the Range of Effect of the Tide Level of Oncheon River Using Delft-3D (Delft-3D를 이용한 온천천의 조위 영향범위 검토)

  • Lee, Sang-Hwa;Lee, Han-Seung;Kim, Jae-Jung;Park, Dong-Hun
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.5
    • /
    • pp.465-472
    • /
    • 2012
  • Recently, as the development of water front and natural type river is gradually increasing, it is mostly the case in that the flow analysis is implemented by only the flood level of the starting point without the tidal effect when the flood water level of the starting point is highly estimated than the high tidal water level in the design of river adjacent to an estuary. This research has analyzed the variation of tidal current for Oncheon river in Busan using Delft-3D program, considering that the tidal effect can cause the change of the flood water level of the starting point although the flood water level is higher than the flood tide level. As a result, considering the tidal effect at downstream boundary condition, water level indicates a periodicity of tide in particular region and the fluctuation range of water level is extended to upstream.

Design and Implementation of IoT-Based Intelligent Platform for Water Level Monitoring (IoT 기반 지능형 수위 모니터링 플랫폼 설계 및 구현)

  • Park, Jihoon;Kang, Moon Seong;Song, Jung-Hun;Jun, Sang Min
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.4
    • /
    • pp.177-186
    • /
    • 2015
  • The main objective of this study was to assess the applicability of IoT (Internet of Things)-based flood management under climate change by developing intelligent water level monitoring platform based on IoT. In this study, Arduino Uno was selected as the development board, which is an open-source electronic platform. Arduino Uno was designed to connect the ultrasonic sensor, temperature sensor, and data logger shield for implementing IoT. Arduino IDE (Integrated Development Environment) was selected as the Arduino software and used to develop the intelligent algorithm to measure and calibrate the real-time water level automatically. The intelligent water level monitoring platform consists of water level measurement, temperature calibration, data calibration, stage-discharge relationship, and data logger algorithms. Water level measurement and temperature calibration algorithm corrected the bias inherent in the ultrasonic sensor. Data calibration algorithm analyzed and corrected the outliers during the measurement process. The verification of the intelligent water level measurement algorithm was performed by comparing water levels using the tape and ultrasonic sensor, which was generated by measuring water levels at regular intervals up to the maximum level. The statistics of the slope of the regression line and $R^2$ were 1.00 and 0.99, respectively which were considered acceptable. The error was 0.0575 cm. The verification of data calibration algorithm was performed by analyzing water levels containing all error codes in a time series graph. The intelligent platform developed in this study may contribute to the public IoT service, which is applicable to intelligent flood management under climate change.

Effect of Change of Reactor Coolant Injection Method on Risk at Loss of Coolant Accident due to Beam Tube Rupture (빔튜브파단 냉각재상실사고시 원자로냉각수 보충방법 변경이 리스크에 미치는 영향)

  • Lee, Yoon-Hwan;Lee, Byeonghee;Jang, Seung-Cheol
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.4
    • /
    • pp.129-138
    • /
    • 2022
  • A new method for injecting cooling water into the Korean research reactor (KRR) in the event of beam tube rupture is proposed in this paper. Moreover, the research evaluates the risk to the reactor core in terms of core damage frequency (CDF). The proposed method maintains the cooling water in the chimney at a certain level in the tank to prevent nuclear fuel damage solely by gravitational coolant feeding from the emergency water supply system (EWSS). This technique does not require sump recirculation operations described in the current procedure for resolving beam tube accidents. The reduction in the risk to the core in the event of beam tube rupture that can be achieved by the proposed change in the cooling water injection design is quantified as follows. 1) The total CDF of the KRR for the proposed design change is approximately 4.17E-06/yr, which is 8.4% lower than the CDF of the current design (4.55E-06/yr). 2) The CDF for beam tube rupture is 7.10E-08/yr, which represents an 84.1% decrease compared with that of the current design (4.49E-07/yr). In addition to this quantitative reduction in risk, the modified cooling water injection design maintains a supply of pure coolant to the EWSS tank. This means that the reactor does not require decontamination after an accident. Thermal hydraulic analysis proves that the water level in the reactor pool does not cause damage to the nuclear fuel cladding after beam tube rupture. This is because the amount of water in the chimney can be regulated by the EWSS function. The EWSS supplies emergency water to the reactor core to compensate for the evaporation of coolant in the core, thus allowing water to cover the fuel assemblies in the reactor core over a sufficient amount of time.

Reliability Based Design of Caisson type Quay Wall Using Partial Safety Factors (부분안전계수를 이용한 케이슨식안벽의 신뢰성설계법)

  • Kim, Dong-Hyawn;Yoon, Gil-Lim
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.3
    • /
    • pp.224-229
    • /
    • 2009
  • Partial safety factors(PSFs) for Level I reliability based design of caisson type quay walls were calculated. First order reliability method(FORM) based PSFs are the functions of sensitivities of limit state function with respect to design random variables, target reliability index, characteristic values and first moment of random variables. Modified PSFs for water level and resilient water level are newly defined to keep consistency with the current design code. In the numerical example, PSFs were calculated by using a target reliability index. Seismic coefficient is defined to show extreme distribution. It was found that PSFs for seismic coefficient becomes smaller as the return period for design seismic coefficient grows longer.

Flood control analysis of the sea dike at estuary. (하구방조제의 홍수조절 해석)

  • 서승덕
    • Water for future
    • /
    • v.10 no.2
    • /
    • pp.113-124
    • /
    • 1977
  • Alone the southwesten coast of Korean peninsula, the extensive available arable acreages suited for forming are found in the development of tidal flats in the geographically curved bays with a motable tidal emplitude. It was found that the developments of these tidal flats cover an estimated area more than 276,000ha. In this paper, a flood control system by Pul's Storage Indication Method and Pul's Graphical Method at Return Periods-50 yrs, design rainfall-267mm per 48hrs and design flood-926c.m.s. and at 0.2meter control height above the High Water Ordinary Spring Tide Level (+11.0m) was studied. At the result, the flood demage in the reservoir at Return Periods-50 yrs and the tidal level at H.W.O.S.T.L. were satisfied to the below E.L. 11.20m (Flood Level in the reservoir). Well skilled flood control technique and management and control of draining sluice gate should be required for the disaster prevention from the flood and tide damage.

  • PDF

Study on flow characteristics of the grit chamber using VOF multi-phase flow simulations (VOF 다상유동 해석을 이용한 침사지 유동특성 연구)

  • Yoon, Jong-Hwan
    • Journal of the Korean Society of Visualization
    • /
    • v.19 no.2
    • /
    • pp.63-73
    • /
    • 2021
  • It is essential to accurately predict the change in water level, velocity, and flow rate for each passage of the grit chamber according to the operating conditions of the pump. In this study, VOF multiphase flow analysis was performed, and the flow characteristics of the grit chamber were predicted. As a result of simulations, the sedimentation phenomenon after the entrance of the grit chamber channel is expected to occur on the side walls. When 6 channels are used, the average speed of the channels is about 52% of the design standard, and when 4 channels are used, the value increases to 74% of the design standard. The average water level in the channels tends to decrease as the flow velocity increases, and the water level in the absorption well with a larger flow rate is maintained lower than that in the absorption well with a smaller flow rate.