The Variations of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condition (강우상태에 의한 소수력발전소 설계변수의 변화)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.138-141
    • /
    • 2008
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

  • PDF

Hydrologic Performance Change of Small Scale Hydro Power Plant with Rainfall Condition Change (강우형태변화에 의한 소수력발전소 수문학적 성능의 변화)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.6
    • /
    • pp.56-61
    • /
    • 2009
  • The effects of design parameters for small scale hydro power(SSHP) plants due to climate change have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis far rainfall conditions based on KIER model show that the capacity and load factor of SSHP site had large difference between the period. Especially, the hydrologic performance of SSHP site due to rainfall condition of recent period varied in design flowrate sensitively. However climate change gave small effect in load factor of existing SSHP plant. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

The Effects of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condation (강우상태에 의한 소수력발전소 설계인자의 영향)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.1
    • /
    • pp.43-49
    • /
    • 2008
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

Studies on Rainfall Rate Forecasting for Reliable Satellite Broadcasting Service (안정된 위성방송서비스를 위한 강우강도 예측에 관한 연구)

  • Dung, Luong Ngoc Thuy;Sohn, Won
    • Proceedings of the Korean Society of Broadcast Engineers Conference
    • /
    • 2013.11a
    • /
    • pp.46-47
    • /
    • 2013
  • In the satellite system design, the processes from the initial design to launch take about 5 years and the broadcasting satellite lifetime goes over 15 years. Furthermore, global warming phenomenon causes rainfall rate increasing more and more in some regions on the earth. Consequently, at the stage of the satellite link design, we need to consider the future rain attenuation over 20 years. In this paper, we investigated two time-series system models for forecasting to consider the future rainfall rate for the satellite broadcasting service. We found that rainfall rate of the future 30 years is increasing continuously.

  • PDF

Analytical Evaluation on Design Criteria for Cut Slopes (국내 절토 비탈면 설계기준의 해석적 평가)

  • Hwang, Young-Cheol;Lee, Hong-Sung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.3
    • /
    • pp.51-57
    • /
    • 2007
  • In the design of slopes during rainfall, the groundwater level is assumed to be located at the ground surface, based on the change in characteristics of rainfall. In addition, stability investigations are performed for large cut slopes in the design of slopes while standard inclinations specified in the design criteria are applied for the slopes that stability investigations are not performed. In spite of the strengthened criteria of groundwater location, slope failures continuously occur during heavy rainfall, regardless of magnitude of slopes. In order to investigate the cause of the failures, stability investigations have been performed on standard inclination of slopes suggested in the design criteria for both dry and rainfall cases by ground condition in this research. Despite that standard inclination of slopes specified in the design criteria should be stable for both dry and rainfall cases, the results show that standard factor of safety has not been obtained in many cases; more than 50% of total cases for dry cases and more than 65% of total cases for rainfall case. Based on the results, this paper indicates the problems in the current design criteria and proposes the plans for establishment of countermeasure.

  • PDF

The Application of the Poisson Cluster Rainfall Generation Model to the Flood Analysis (포아송 클러스터 강우생성 모형의 홍수 모의 적용성 평가)

  • Kim, Dongkyun;Shin, Ji Yae;Lee, Seung-Oh;Kim, Tae-Woong
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.5
    • /
    • pp.439-447
    • /
    • 2013
  • The applicability of the parameter map of the Modified Bartlett-Lewis Rectangular Pulse (MBLRP) model for the Korean Peninsula was assessed from the perspective of flood prediction. The design rainfalls estimated from the MBLRP model were smaller than those from observed values by 5% to 40%, and the degree of underestimation of design rainfall increases with the increase of the recurrence interval of the design rainfall. The design floods at a virtual watershed estimated using the simulated rainfall time series based on MBLRP model were also smaller than those derived from the observed rainfall time series by 20% to 45%. The degree of underestimation of design flood increases with the increase of the recurrence interval of the design flood.

The Estimation of Pollution Loads in First-flush Overflows with Various Rainfall and Regional Characteristics (강우 및 지역특성별 초기우수월류에 의한 오염부하 기여도 평가)

  • Kim, Hongtae;Shin, Dongseok;Kim, Yongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.6
    • /
    • pp.622-631
    • /
    • 2014
  • The purpose of this research was to find a proper disposal rainfall extent to improve water quality. SWMM was applied to select catchment area and tested first flush load and rainfall extent. BOD 40mg/L was selected to dispose the first flush and sewer overflow with the same as the criteria of Sewerage Act. Design rainfall, BOD load ratio of first flush sewer overflow, and the ratio of disposal flow were analyzed under various rainfall distribution. BOD load and design rainfall to treat overflow in situation of first flush extent with 4.3~17.4% were 56~87% and 3.8~6.8 mm/day, respectively. In urban area, first flush loads were not correspond to land activities, but tend to increase with increasing rainfall amount and drainage area. The more the distribution of rainfall is similar to Huff-frontal or central distribution of rainfall, the more increase the first flush loads.

Estimation of runoff coefficient through impervious covers analysis using long-term outflow simulation (장기유출 모의를 통한 도시유역 불투수율에 따른 유출계수 변화)

  • Kim, Young-Ran;Hwang, Sung-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.6
    • /
    • pp.635-645
    • /
    • 2014
  • The changes of rainfall pattern and impervious covers have increased disaster risks in urbanized areas. Impervious covers such as roads and building roofs have been dramatically increased. So, it is falling the ability safety of flood defense equipments to exist. Runoff coefficient means ratio of runoff by whole rainfall which is able to directly contribute at surface runoff during rainfall event. The application of accurate runoff coefficients is very important in sewer pipelines design. This study has been performed to estimate runoff characteristics change which are applicable to the process of sewer pipelines design or various public facilities design. It has used the SHER model, a long-term runoff model, to analyze the impact of a rising impervious covers on runoff coefficient change. It thus analyzed the long-term runoff to analyze rainfall basins extraction. Consequently, it was found that impervious surfaces could be a important factor for urban flood control. We could suggest the application of accurate runoff coefficients in accordance to the land Impervious covers. The average increase rates of runoff coefficients increased 0.011 for 1% increase of impervious covers. By having the application of the results, we could improve plans for facilities design.

Evaluation of Parameter Estimation Method for Design Rainfall Estimation (설계강우량 산정을 위한 매개변수 추정방법 평가)

  • Kim, Kwihoon;Jun, Sang-Min;Jang, Jeongyeol;Song, Inhong;Kang, Moon-Seong;Choi, Jin-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.4
    • /
    • pp.87-96
    • /
    • 2021
  • Determining design rainfall is the first step to plan an agricultural drainage facility. The objective of this study is to evaluate whether the current method for parameter estimation is reasonable for computing the design rainfall. The current Gumbel-Kendall (G-K) method was compared with two other methods which are Gumbel-Chow (G-C) method and Probability weighted moment (PWM). Hourly rainfall data were acquired from the 60 ASOS (Automated Synoptic Observing System) stations across the nation. For the goodness-of-fit test, this study used chi-squared (𝛘2) and Kolmogorov-Smirnov (K-S) test. When using G-K method, 𝛘2 statistics of 18 stations exceeded the critical value (𝑥2a=0.05,df=4=9.4877) and 10, 3 stations for G-C method, PWM method respectively. For K-S test, none of the stations exceeded the critical value (Da=0.05n=0.19838). However, G-K method showed the worst performances in both tests compared to other methods. Subsequently, this study computed design rainfall of 48-hour duration in 60 ASOS stations. G-K method showed 5.6 and 6.4% higher average design rainfall and 15.2 and 24.6% higher variance compared to G-C and PWM methods. In short, G-K showed the worst performance in goodness-of-fit tests and showed higher design rainfall with the least robustness. Likewise, considering the basic assumptions of the design rainfall estimation, G-K is not an appropriate method for the practical use. This study can be referenced and helpful when revising the agricultural drainage standards.

Peak Discharge Change by Dirrerent Design Rainfall on Small Watershed

  • Jun, Byong-Ho;Jang, Suk-Hwan
    • Korean Journal of Hydrosciences
    • /
    • v.3
    • /
    • pp.97-104
    • /
    • 1992
  • To design the minor structures in the small watersheds, it is required to calculate the peak discharge. For these calculations the simple peak flow prediction equations, the unit hydrograph method. the syntheic unit hydrograph methods or the runoff simulation models are adopted. To use these methods it is generally requried to know the amount and the distributions of the design rainfall; which are the uniform distribution, the trangular distribution, the trapezoidal distribution, or the Huff type distribution. In this study, the peak discharges are calculated by the different rainfall distributions and the results are compared.

  • PDF