• 제목/요약/키워드: Design project

검색결과 4,019건 처리시간 0.036초

건설 산업에서 이해관계자들의 인식 부합이 프로젝트 성과에 미치는 영향 (Effect of the Consensus among Stakeholders on Project Performance in Construction Industry)

  • 권장현;이태원;김승철
    • 산업경영시스템학회지
    • /
    • 제42권3호
    • /
    • pp.232-241
    • /
    • 2019
  • Stakeholder management in construction projects is an important factor in project performance creation. The purpose of this study is to verify the effect of the recognition of the importance of the quality influence factors among the stakeholders of the construction project on the perceived quality and the project performance. The impact of the project management methodology on the project performance has been actively researched, but there is little research result on the project stakeholders. The projects to be researched are apartments and buildings that have been completed within the last five years of domestic large construction company. The method of survey is to measure the consensus of the importance of the quality influential factors among the three parties such as the ordering party, the design supervisor and the constructor, and confirm whether the agreement affects the quality of the actual project. Finally, the research model was verified by surveying the satisfaction of the client on the final product. The results are as follow. The degree of agreement on the importance of quality influential factors among stakeholders has a significant effect on perceived quality. In the relationship between perceived quality of influence factors, organizational (support) quality influenced technological quality and managerial quality, and technological quality and managerial quality also have significant influence on resource quality. The results of analysis showed that perceived quality of resources strongly influenced project performance. The remaining three experienced qualities also significantly affect project performance.

STRATEGIC ALLIANCE IMPLEMENTATION STATUS AND IMPACT ON PROJECT PERFORMANCE

  • Bon-Gang Hwang;Young-Ki Huh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.212-217
    • /
    • 2009
  • Strategic alliance is a proactive management process that integrates and optimizes value-added services of each party to best achieve business objectives of all parties within the relationship. Under the current competitive global environment, strategic alliance can produce a "Win-Win" situation and thus change paradigm that has resided in the construction industry. While many studies revealed the significance of alliance relationship in the industry, its impact on project performance has rarely been analyzed. Using the data obtained from 661 construction projects in the Construction Industry Institute database (359 projects from 38 owners and 302 projects from 29 contractors), this study first diagnoses the implementation status of strategic alliance at both project and company levels. Then, its impact on project performance is quantified and discussed. The descriptive analysis performed in this study revealed that an average of 79% of owner companies and 69% of contractor companies have ever implemented strategic alliance into at least one of their projects. However, both owner and contractor companies did not always use the strategy for all or their projects. Only 33% and 30% of projects reported by owners and contractors have been completed under alliance relationship, respectively. Analyzing the alliance impact on project performance, this study also establishes that strategic alliance positively affects project performance of both owners and contractors while owners should consider and control the level of its use for their projects. Recognizing and understanding the benefits from strategic alliance will be a starting point to produce mutual success among project participants, ultimately allowing the construction industry to go forward to a sustainable industry that transfers success from one project to the other.

  • PDF

ISP(정보 전략 계획) 개념을 이용한 디지털 생산 적용 프레임워크 연구 (Research on the Framework for the Adoption of Digital Manufacturing Methodology with Information Strategy Planning Concept)

  • 우종훈;송영주;이태경;신종계
    • 한국CDE학회논문집
    • /
    • 제15권2호
    • /
    • pp.94-105
    • /
    • 2010
  • Todays, there is fast transition about the new manufacturing IT methodologies from the conceptual phase into the practical application phase for the strengthening of enterprise competitiveness in manufacturing industry. One of those new methodologies is PLM (Product Life-cycle Management). PLM methodology consists of 3D CAD for the product design, PDM (Product Data Management) for the data management based on the collaboration platform and lastly DM (Digital Manufacturing). DM has evoluted from the stand-alone computer simulation of early 1980s, and now it covers the overall production development and production. Unfortunately, there exist serious critical problems about the actual application of DM for the real work. This is owing to the transition of the point of view from stand-alone type application (such as flow simulation or robot simulation) to that of business process about product development and production management. In this paper, we propose an application framework for the successful project with the digital manufacturing methodology with the concept of Information Strategy Planning, which enables the systematic diagnosis and the quantitative evaluation. Also, we introduce the actual practice of the proposing framework with the ISP project for 'Analysis & Simulation Technique of manufacturing process project' that is being conducted by Chungnam Techno Park.

연신내 성당 리모델링 구축 프로젝트 (Remodeling Project of the 'Yeonsinae' Catholic Church)

  • 배강희;이혁준
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2006년도 춘계학술발표대회 논문집
    • /
    • pp.53-54
    • /
    • 2006
  • Recently with increasing interest in the operation of life cycle, building remodeling business is spreading like a fashion. Keeping pace with the trend, the present project carried out the remodeling of an existing neighborhood facility into a religious facility based on the concepts of remodeling, reform and renovation. Basic requirements were overcoming spatial limitations, solving structural problems, meeting various functional needs, and securing a spatial size, and the project designed the interior of the building according to these requirements suggested by the owner. To overcome the low floor height of the existing space, the main sanctuary on the 1st floor had the ceiling in the form of a slant and installed indirect lighting into the resulting gaps, maximizing the depth and width of the space visually. The subsidiary sanctuary on the first basement was finished with red bricks, forming an arch using the bricks, to create religious atmosphere. However, considering the low floor height as in the 1st floor and the ceiling even lowered by the arch structure, the arch was formed threefold and the radius of the curvature of the arch was enlarged to secure a spacious feeling. The outer appearance was finished with granite on existing structure to save the cost of construction. In addition to the use of the finishing material, the structure of the arch and the frame of the opening part and the finishing of the walls were expressed with uneven surface in order to avoid the plainness of the appearance.

  • PDF

라빌레뜨 이후 현대건축에서 나타난 폴리 프로젝트 사례 연구 (A Study on the Cases of Folly Project in the Contemporary Architecture After Parc de la Villette)

  • 강효정
    • 한국실내디자인학회논문집
    • /
    • 제23권3호
    • /
    • pp.144-152
    • /
    • 2014
  • This study evaluated how folly is experimented in the contemporary architecture after 30 years when Bernard Tchumi first introduced it to the public by the modern transformation as a garden ornament. First, folly project has been carried out based on the general concept of energizing dwindling cities. However, it has changed to the direction of adding specific programs. Also, along urban regeneration that does not change deterioration of previous structures, Folly changed in the emphasis on readjust existing structure. Second, by having different designers presenting their own follies during the Osaka Expo, folly now has part on visual exhibition element. This has similarity with public art project, yet it could more actively intervene for urban regeneration compared to conventional environment sculpture. Third, folly is experimented as the event-installation art combined form of architecture and art where people could experience the space and enjoy art. Fourth, folly enabled the landscaping of architecture and expanding city planning. Recently Gwangju Folly invited various arts, social, and cultural professionals to converge city design with architecture, landscaping, and other diverse genres.

도시가로공간의 공공디자인 개선사업에 따른 열환경 개선 효과 평가 (Evaluation of Thermal Environment Improvement Effect from Public Design Improvement Project on the Urban Street Space)

  • 백상훈;시미즈아키;김학윤;정응호
    • 한국환경과학회지
    • /
    • 제20권9호
    • /
    • pp.1105-1114
    • /
    • 2011
  • In this study, thermal environment improvements throughout public design improvement project on the urban street space were compared and evaluated. Thermo-Render 3.0, 3D-CAD based thermal environment simulation program, had been used for thermal environment improvement evaluations. Followings are the results. First, clayey blocks which have low heat transfer rate and cool island effect by trees and roof gardens brought cooling effects for buildings and surface of streets. Seconds, MRT values showed low levels because of low radiant mulching materials. Thirds, roof gardens contributed to reduce heat island effect since HIP levels were affected by decreasing heat storage effect of buildings from roof gardens. As a result, reducing heat storage effect throughout selecting and arranging proper materials which would not increase heat island potentials should be performed to improve heat island effects.

시공중 계측을 통한 어스앵커 축력변화 특성사례 연구 (Case Study of Earth Anchor Axial Force Change Characteristic through Monitoring during Construction Period)

  • 김성욱;한병원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.285-292
    • /
    • 2004
  • Earth Anchor method as a supporting system is widely used in the large scale deep excavation of urban areas or slope excavation project. Considering the application frequency of that method and catastrophe of that method under unproper construction management, we can find out many problems relevant to the domestic design and construction management of earth anchor method. When we encounter the cases of rapid increments and various decrements in earth anchor axial forces, considering the characteristic of earth anchor method, it is an essential point to catch the reasons and to prepare countermeasures. This article introduces two actual monitoring examples based on the close analyses of measured data in a typical large scale deep excavation project and slope excavation project. One is a rapidly increasing case of earth anchor axial forces with the continuous advance of incremental deformation in a geological layer interface. And another is a decreasing case of earth anchor axial forces with the construction conditions. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석 (Case Study in Current State of Amount of Order for Turnkey Project)

  • 이양규;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.197-202
    • /
    • 2004
  • 설계$\cdot$시공일괄입찰제도는 기술인력이 부족한 발주자를 대신해서 건설사업을 효율적으로 수행할 수 있는 제도로서 공사기간의 단축이 가능하고, 건설공사의 품질향상, 설계와 시공의 통합에 의한 기술력제고 효과를 기대할 수 있으나, 상대적으로 계약자 측면에서는 책임 일원화에 따른 어려움이 발생되고 있다. 본 연구는 국내에서 운영되고 있는 설계$\cdot$시공일괄입찰제도 발주현황과 낙찰률 현황, 공종별 시행규모, 발주처별 시행규모, 심의방식 등을 분석하여 동 제도의 문제점을 구체적으로 분석하고자 하며, 기본적인 제도의 개선방안을 제시한다.

  • PDF

해양플랜트용 고압.고차압 제어밸브의 구조 안전성 평가 (Safety Estimation of High Pressure Drop Control Valve for Offshore Structures)

  • 김재웅
    • 한국생산제조학회지
    • /
    • 제20권5호
    • /
    • pp.553-558
    • /
    • 2011
  • This study have goal with conceptual design for offshore structures of high pressure drop control valve for localization valve for development accomplished with flow analysis based on provision of ANSI B16.34, ANSI B16.10, ANSI B16.25. In order to localize the Offshore structures high pressure drop control valve. This study is numerical analysis for zambil offshore project of high pressure drop control valve. The solver which ANSYS workbench used for offshore structures analysis. The working fluids assumed the glycerin(C3H8O3). The structural analysis used ANSYS which is a commercial code. Stress analysis result of internal pressure in valve showed lower than yield strength. This is expect to need more detail design and verification for stem and disk structure. In this study a multi-disk of high pressure drop control valve is designed and manufactured. Then, the flow rate and high pressure dorp of fluids flowing in the high pressure drop control valve is CAE. So, this system can be easily substituted for the existing zambil offshore project system. Finally, safety estimation for trim design of high pressure drop control valve for offshore structures.

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.