• 제목/요약/키워드: Design phase

검색결과 6,272건 처리시간 0.041초

원전 생애주기 관리대상 기기의 정보 흐름 규명을 통한 설계정보 추적성 구현방안에 대한 기초 연구 (A basic Study on Establishment Plan of Design Information Traceability through Design Information Flow Identification for Controlled Equipment during the NPP Lifecycle)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.183-184
    • /
    • 2017
  • Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.

  • PDF

Design space exploration in aircraft conceptual design phase based on system-of-systems simulation

  • Tian, Yifeng;Liu, Hu;Huang, Jun
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제16권4호
    • /
    • pp.624-635
    • /
    • 2015
  • Design space exploration has been much neglected in aircraft conceptual design phase, which often leads to a waste of time and cost in design, manufacture and operation process. It is necessary to explore design space based on operational system-of-systems (SoS) simulation during the early phase for a competitive design. This paper proposes a methodology to analyze aircraft performance parameters in four steps: combination of parameters, object analysis, operational simulation, and key-parameters analysis. Meanwhile, the design space of an unmanned aerial vehicle applied in earthquake search and rescue SoS is explored based on this methodology. The results show that applying SoS simulation into design phase has important reference value for designers on aircraft conceptual design.

Strategies to Induce Metastable T' Phase of Monolayer MoS2

  • 강성우
    • EDISON SW 활용 경진대회 논문집
    • /
    • 제6회(2017년)
    • /
    • pp.417-423
    • /
    • 2017
  • Monolayer $MoS_2$의 metastable phase인 T' phase가 stable한 H phase보다 안정해지는 조건을 모색하기 위해 substitutional doping을 했을 때와 strain을 걸어주었을 때의 에너지 차이를 DFT 방법으로 계산하였다. Doping을 했을 때와 strain이 있을 때 T' phase와 H phase의 에너지 차이가 감소함을 확인하였으나 H phase보다 T' phase가 안정해지는 조건을 찾지는 못하였다. 하지만 이 방법을 기존의 alkali adsorption 방법과 병행하여 기존 방법의 단점을 보완할 수 있을 것을 기대해 볼 수 있다. 또한 전자구조 분석 중 얻은 dopant의 주기와 족에 따른 경향성은 다른 TMD 물질의 phase engineering을 design할 때 universal한 design rule로서 응용할 수 있음을 기대해 볼 수 있다.

  • PDF

DTV(Digital TV) 수신 모듈용 광대역 가변 위상기의 설계 (Design of the Broad Band Phase Shifter for DTV Receiver)

  • 한기진;김종필;나형기
    • 한국전자파학회논문지
    • /
    • 제14권3호
    • /
    • pp.296-303
    • /
    • 2003
  • 본 논문에서는 DTV(Digital TV) 수신 모듈에 적용되는 반사형 가변 위상기의 설계를 위한 설계식을 제안하고 이를 이용해 DTV 수신대역인 470 MHz에서 860 MHz까지 180$^{\circ}$ 이상의 위상 가변특성을 만족하는 가변 위 상기를 설계하였다. 제시된 설계식을 이용하여 원하는 위상 가변 범위와 삽입손실을 만족하는 반사형 가변 위상의 체계적인 설계가 가능하며, 제작된 가변 위상기가 주어진 사양을 만족함을 확인할 수 있었다.

다중적분기 사용 +1, 0, -1 계수의 선형위상 FIR 필터의 설계 (FIR Linear Phase Filter Design Using Coefficients +1,0.-1 and Multiple Integrator)

  • Kim, Hyung-Myung
    • 대한전자공학회논문지
    • /
    • 제26권12호
    • /
    • pp.2046-2054
    • /
    • 1989
  • Improved algorithms are presented to design linear phase digital FIR filters with coefficients of +1,0,-1 only followed by a multiple integrator. It has been shown that the existing linear phase filter design concept for the single integrator(or, accumulator)case can be extended to the case of the multiple integrator. Linear phase conditions for the multiple integrators are summarized. Filter design methods with double or triple integrator are exploited in datail and its computer simulation results are presented to deduce the advantages of multiple integrator to the single integrator.

  • PDF

Maximum Tolerated Dose Estimation Applied Biased Coin Design in a Phase I Clinical Trial

  • Kim, Yu Rim;Kim, Dongjae
    • Communications for Statistical Applications and Methods
    • /
    • 제19권6호
    • /
    • pp.877-884
    • /
    • 2012
  • Phase I trials determine the maximum tolerated dose(MTD) and the recommended dose(RD) for subsequent Phase II trials. In this paper, a MTD estimation method applied to a biased coin design is proposed for Phase I Clinical Trials. The suggested MTD estimation method is compared to the SM3 method and the NM method (Lee and Kim, 2012) using a Monte Carlo simulation study.

무기체계 개발간 초기 설계단계에서의 정비도 예측방안 연구 (A Study on the Maintainability Prediction in the Initial Design Phase between Weapon System Development)

  • 김영석;허장욱
    • 한국군사과학기술학회지
    • /
    • 제22권6호
    • /
    • pp.824-831
    • /
    • 2019
  • For effective development in consideration of the maintainability of the weapon system, it is necessary to understand whether the maintainability design requirements are satisfied at the early phase of development. This requires the application of an early design phase maintainability prediction process to provide opportunities for improvement. By defining the ambiguity group definition, fault isolation level, fault isolation probability, and countermeasures for faults, it was possible to predict early phase development. The MTTR of the initial design phase applying Procedure V to the artillery system was 3.46H, which is about 16 % higher than 2.98H, the MTTR using Procedure II. This is a result of system design ambiguity that has not been specified in the early phase of development.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

위상 조절 인자를 고려한 IMC-PID 제어기의 설계 (The Design of IMC-PID Controller Considering a Phase Scaling Factor)

  • 김창현;임동균
    • 전기학회논문지
    • /
    • 제57권9호
    • /
    • pp.1618-1623
    • /
    • 2008
  • In this paper, a new design method for IMC-PID that adds a phase scaling factor of system identifications to the standard IMC-PID controller as a control parameter is proposed. Based on analytically derived frequency properties such as gain and phase margins, this tuning rule is an optimal control method determining the optimum values of controlling factors to minimize the cost function, integral error criterion of the step response in time domain, in the constraints of design parameters to guarantee qualified frequency design specifications. The proposed controller improves existing single-parameter design methods of IMC-PID in the inflexibility problem to be able to consider various design specifications. Its effectiveness is examined by a simulation example, where a comparison of the performances obtained with the proposed tuning rule and with other common tuning rules is shown.

DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발 (Development of Cost Management Process during Design Phase based on Design to Cost)

  • 박소현;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF