• 제목/요약/키워드: Design management Construction

검색결과 2,188건 처리시간 0.026초

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 - (Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project -)

  • 김수민;조재호;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.212-215
    • /
    • 2008
  • 건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.

  • PDF

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

XPS DOCUMENTS AND THEIR APPLICATIONS IN THE CONSTRUCTION INDUSTRY

  • N. O., Nawari
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.417-423
    • /
    • 2007
  • This paper describes how using the XPS Document technologies of Windows Vista support and enhances interactions with the structural design and construction process. It illustrates the document workflows and the document life cycle in a typical construction base knowledge system. It provides engineers and decision makers and implementers with information about this new technology and how they can apply it to their design and construction models. The paper also highlights opportunities for the new format of data exchange in the recent efforts to develop National Management System Standards for Transportation Applications to benefit from these emerging technologies.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

국내 건설공사 초기단계에서의 참여주체별 중점안전관리항목 조사연구 (Safety Management Priority Classified by Participants in Planning & Design Stages)

  • 송도흠;여상구;고성석
    • 한국안전학회지
    • /
    • 제25권1호
    • /
    • pp.50-56
    • /
    • 2010
  • The safety accidents of domestic construction happened more than other industries is performed only under the construction stage. In the foreign countries, however, owners and designers play an important role on safety in an early stage. Therefore, numerous studies were carried out by getting rid of accident risks and institutionalizing prevention activities in an construction stages. Accordingly, this study have performed to deduce the pivotal point of safety management items classified by the subject suitable for construction by introducing of safety conception of domestic and international design and suggested the improvement methods of safety management plans of the planning design stage so as to perform more efficient safety management.

부산대학교 어린이병원 건립사업 CM 수행사례 (A Case Study of Construction Management for Pusan National University Children's Hospital)

  • 양진국;이민현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.13-18
    • /
    • 2007
  • 보건복지부의 지원으로 건립하는 부산${\cdot}$경남 최초의 어린이전문병원 건립공사는 양산부산대학교병원과의 연계로 최고시설의 의료타운건립을 목표로 수행중이며 건설사업관리(CM)라는 체계적이고 과학적인 관리기법의 도입 및 적용을 통해 건설프로젝트의 비생산적이고 비효율적인 요소를 제거하여 생산성과 효율성을 향상시키고자 하는 것이다. 이에 본 연구에서는 어린이병원건립사업에 사업관리기법을 설계이전단계부터 턴키업체선정, 시공, 설계VE, PMIS구축, 유지관리단계의 사업 전(全)단계에 적용하여 발생한 효과와 분야별 기술자를 활용한 기본 및 실시설계VE를 통한 사업비 절감 및 공기단축 효과를 제시하고자 한다.

  • PDF

SUSTAINABLE DESIGN AUTOMATION AND MANAGEMENT USING XML

  • Byeong Cheol Lho;Jeong Hoon Kim;Ok Youn Yu;Julian Kang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.592-595
    • /
    • 2005
  • Concrete slab bridge is one of most common structures employed for local road constructions because of its simplicity in design and construction. Computer applications were developed to automate the repetitive computation for these simple structures. However, in most cases, managing the electronic documents produced by these applications has not been incorporated with design automation application yet. Resultant documents are often managed by individuals and disappear as time goes by due to lack of systemic management. This paper introduces a Web-based application developed to not only speed up the design process but also enhance the collection and manipulation of resultant electronic documents.

  • PDF

협업 설계관리를 통한 건설 프로젝트 기대효과에 관한 연구 (A Study On Construction Project Expected Effect Collaboration Business Design Management)

  • 남혜원;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.589-592
    • /
    • 2007
  • 최근 들어 건설사업관리에서 설계관리에 대한 중요성이 증대되면서 협업업체간의 협업설계관리에 대한 필요성이 중요시 되고 있다. 이에 따라 본 연구에서는 첫째, 건축 설계업무 능력 향상을 위하여 설계관리 업무에 관련된 설계 프로세스의 흐름에 대한 파악, 관리요소 도출하는 것에 목적을 두었으며, 둘째, 현업에서의 협업설계에 대한 문제점 파악 및 설계 프로세스 관리요소를 바탕으로, 공기의 최소화, 각 회사 간의 협업부족에 따른 도서간의 불일치, 설계 변경 시 설계정보 추적 어려움등의 개선을 통하여 설계 최적화를 목적으로 한 협업 설계 관리의 대안을 제시하였다. 따라서 본 논문은 협업설계에 관한 체계적인 활용을 통해서 협업 설계관리를 통한 건설 프로젝트의 기대효과를 제시하고자 한다.

  • PDF

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF