• Title/Summary/Keyword: Design impact load

Search Result 405, Processing Time 0.024 seconds

Life Cycle Assessments and Effect Factors in the Planning Stage of Steel Bridge (강교량의 기획단계에서의 환경부하 평가 및 영향요인에 관한 연구)

  • Jeon, Min Yeong;Kyung, Kab Soo;Lee, Sung Jin;Ryu, Seong Jin
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.1
    • /
    • pp.13-22
    • /
    • 2016
  • Recently, interest for environmental pollution in various fields is on the increase, and the researches on the life cycle assessment of environmental performance assessment method for calculating the environmental loads are currently most performed. It is expected to have a significant influence on the environment, since SOC infrastructures are go through a variety of materials, manufacturing process, however it is judged that researches and measures for environmental pollution is insufficient. In this study, we build the data for 204 of steel bridge designed after 2000 year, and the 100 of bridge which were selected to from obtained results were calculated the environmental loads at the planning stage based on the life cycle assessment. In addition, standard classification systems in work type for steel bridges were established. Based on this, the basic design data and input materials for the bridges are applied to the LCI DB, and the environmental load for required material is evaluated and is shown as Eco-point. Environmental loads obtained from this study, it is judged that can be utilized as a basic data for the process of the life cycle assessment in future steel bridge design.

Analysis of Effects of Reshoring Works on Short and Long Term Deflections of Flat Plates (플랫 플레이트 구조의 장단기 처짐 제어에 대한 동바리 재설치 작업의 효과 분석)

  • Kim, Jae-Yo;Park, Soo-Beom
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.1
    • /
    • pp.40-48
    • /
    • 2017
  • RC flat plates may be governed by a serviceability as well as a strength condition, and a construction sequence and its impact on the distributions of gravity loads among slabs tied by shores are decisive factors influencing short and long term behaviors of flat plate. Over-loading and tensile cracking in early-aged slabs significantly increase the deflection of a flat plate system under construction, and a reshoring work may be helpful in reducing slab deflections by controlling the vertical distributions of loads in a multi-shored flat plate system. In this study, a effect of reshoring works on short and long term deflections of flat plate systems are analyzed. The slab construction loads with various reshoring schemes and slab design and construction conditions are defined by a simplified method, and the practical calculation of slab deflections with considering construction sequences and concrete cracking and long term effects is applied. From parametric studies, the reshoring works are verified to reduce slab deflections, and the optimized conditions for the reshoring works and slab design and constructions are discussed.

Development and Verification of Large Triaxial Testing System for Dynamic Properties of Granular Materials (조립재료 동적물성 산정을 위한 대형삼축압축시험장비 구축 및 검증)

  • Lee, Sung-Jin;Kim, Yun-Ki;Choo, Yun-Wook;Lee, Sei-Hyun;Kang, Tae-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.12
    • /
    • pp.5-17
    • /
    • 2010
  • Coarse granular material is used as important fill material in most of large embankments such as railway, road, dam and so on. Therefore, the accurate design parameters of the coarse granular material are necessarily required in design and construction. The behavior of the coarse granular material was not well understood because of the lack of large testing equipment capable of coarse granular material. A large triaxial testing system was developed in this research, capable of large specimens of 500 mm, 300 mm and 150 mm in diameter. In the new large triaxial testing system, the load cell is installed inside the triaxial cell and axial displacement is measured locally on a specimen in order to improve control and measurement in small strain level. Urethane specimens of 300 mm and 50 mm in diameter were prepared. The large triaxial tests were performed on the 300 mm diameter urethane specimens while RC/TS and impact echo tests on the 50 mm diameter urethane specimens to verify this testing system. In this verification test results, we could ascertain the reasonable test results of the KRRI large triaxial testing system.

A case study on the bolt failure of the moving parts of a marine diesel engine (선박용 디젤기관의 운동부 볼트 손상사례에 대한 연구)

  • Kim, Jong-Ho;Lee, Jae-Hyun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.118-124
    • /
    • 2017
  • To investigate and analyze the cause of the failure of the connecting rod bolt and the crank pin bearing bolt of the diesel engine of this study, the following results were obtained through site surveying, the investigation of literature referring to similar failures, testing and inspection of the fracture surface, and the experience of the researchers. The fractured crank pin bearing bolt of the diesel engine is estimated to be damaged later than the connecting rod bolt. From the shape of fracture surface, it is evident that the failed connecting rod bolt is fractured by fatigue failure due to abnormally repeated loads (e.g. loosening of the connecting bolt, etc.), and is not failed by brittle fractures due to the impact load. The surface of the U-nut on the fractured connecting rod bolt has been worsening due to the improper use of lubricant (agent for prevention of thread fixing) and no usage of separating the each connecting rod on each cylinder. Moreover, there is the possibility that those poor surface conditions of the fractured connecting rod bolt have affected the failure of the connecting rod bolt of the main engine. And it could be assumed that the mechanical characteristic and manufacturing process of the failed connecting rod bolt and crank pin bearing bolt, which were made by a domestic company, conform to the design requirements for those bolts.

Experimental Evaluation of Bi-directionally Unbonded Prestressed Concrete Panel Blast Resistance Behavior under Blast Loading Scenario (폭발하중 시나리오에 따른 2방향 비부착 프리스트레스트 콘크리트 패널부재의 폭발저항성능에 대한 실험적 거동 평가)

  • Choi, Ji-Hun;Choi, Seung-Jai;Cho, Chul-Min;Kim, Tae-Kyun;Kim, Jang-Ho Jay
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.6
    • /
    • pp.673-683
    • /
    • 2016
  • In recent years, frequent terror or military attack by explosion, impact, fire accidents have occurred. Particularly, World Trade Center collapse and US Department of Defense Pentagon attack on Sept. 11 of 2001. Also, nuclear power plant incident on Mar. 11 of 2011. These attacks and incidents were raised public concerns and anxiety of potential terrorist attacks on major infrastructures and structures. Therefore, the extreme loading researches were performed of prestressed concrete (PSC) member, which widely used for nuclear containment vessel and gas tank. In this paper, to evaluate the blast resistance capacity and its protective performance of bi-directional unbonded prestressed concrete member, blast tests were carried out on $1,400{\times}1,000{\times}300mm$ for reinforced concrete (RC), prestressed concrete without rebar (PSC), prestressed concrete with rebar (PSRC) specimens. The applied blast load was generated by the detonation of 55 lbs ANFO explosive charge at 1.0 m standoff distance. The data acquisitions not only included blast waves of incident pressure, reflected pressure, and impulse, but also included displacement, acceleration, and strains at steel, concrete, PS tendon. The results can be used as basic research references for related research areas, which include protective design and blast simulation under blast loading.

Structural Integrity Assessment of Helicopter Composite Rotor Blade by Analyzing Bird-strike Resistance (조류충돌 해석을 통한 헬리콥터 복합재 로터 블레이드 구조 건전성 평가)

  • Park, Jehong;Jang, Jun Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.8
    • /
    • pp.8-14
    • /
    • 2019
  • Bird-strike is one of the most important design factors for safety in the aviation industry. Bird-strikes have been the cause of significant damage to aircraft and rotorcraft structures and the loss of life. This study used DYTRAN software to simulate the transient response of an Euler-Lagrangian composite helicopter blade that has been impacted by a bird. The Arbitrary Lagrangian Eulerian (ALE) method and a suitable equation of state were applied to model the bird. ALE was applied to the bird-strike analysis due to the large difference between the properties of the blade and bird. The debris of the bird was assumed to be a fluid and applied as Euler elements after the collision. Through the analysis of bird impacts, the leading-edge of the rotor blade (50.8 mm) was used to identify a positive margin of 1.18 based on the TSAI-FILL criteria. The results are assessed to be sufficiently reliable and may be evaluated to replace tests with various analysis conditions. The structural stability of the rotor blade could be assessed by applying various load conditions and different modeling methods in the future.

Seismic Performance Evaluation of Unreinforced and ECC-jacketed Masonry Fences using Shaking Table Test (진동대실험을 사용한 비보강 및 ECC 자켓 보강 조적담장의 내진성능평가)

  • Yonghun Lee;Jinwoo Kim;Jae-Hwan Kim;Tae-Sung Eom;Sang-Hyun Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.182-192
    • /
    • 2023
  • In this study, the efficacy of Engineered Cementitious Composite(ECC) jacket for masonry fences subjected to lateral dynamic load was experimentally verified through a shaking table test, comparing it with the performance of an unreinforced masonry(URM) fence. Firstly, dominant frequencies, modal damping ratios and deformed shapes were identified through an impact hammer test. URM and ECC-strengthened fences with heights of 940mm and 970mm had natural frequencies of 6.4 and 35.3Hz, and first modal damping ratios of 7.0 and 5.3%, respectively. Secondly, a shaking table test was conducted in the out-of-plane direction, applying a historical earthquake, El Centro(1940) scaled from 25 to 300%. For the URM fence, flexural cracking occurred at the interface of brick and mortar joint(i.e., bed joint) at the ground motion scaled to 50%, and out-of-plane overturning failure followed during the subsequent test conducted at the ground motion scaled to 30%. On the other hand, the ECC-jacketed fence showed a robust performance without any crack or damage until the ground motion scaled to 300%. Finally, the base shear forces exerted upon the URM and ECC-jacketed fences by the ground motions scaled to 25~300% were evaluated and compared with the ones calculated according to the design code. In contrast to the collapse risk of the URM fence at the ground motion of 1,000-year return period, the ECC-jacketed fence was estimated to remain safe up to the 4,800-year return period ground motion.

Numerical Analysis of Collapse Behavior in Industrial Stack Explosive Demolition (산업용 연돌 발파해체에서 붕괴거동에 관한 수치해석적 연구)

  • Pu-Reun Jeon;Gyeong-Jo Min;Daisuke Fukuda;Hoon Park;Chul-Gi Suk;Tae-Hyeob Song;Kyong-Pil Jang;Sang-Ho Cho
    • Explosives and Blasting
    • /
    • v.41 no.3
    • /
    • pp.62-72
    • /
    • 2023
  • The aging of plant structures due to industrialization in the 1970s has increased the demand for blast demolition. While blasting can reduce exposure to environmental pollution by shortening the demolition period, improper blasting design and construction plans pose significant safety risks. Thus, it is vital to consider optimal blasting demolition conditions and other factors through collapse behavior simulation. This study utilizes a 3-D combined finite-discrete element method (FDEM) code-based 3-D DFPA to simulate the collapse of a chimney structure in a thermal power plant in Seocheon, South Korea. The collapse behavior from the numerical simulation is compared to the actual structure collapse, and the numerical simulation result presents good agreement with the actual building demolition. Additionally, various numerical simulations have been conducted on the chimney models to analyze the impact of the duct size in the pre-weakening area. The no-duct, duct, and double-area duct models were compared in terms of crack pattern and history of Z-axis displacement. The findings show that the elapse-time for demolition decreases as the area of the duct increases, causing collapse to occur quickly by increasing the load-bearing area.

Suggestion on the Optimal Length of Long Tunnels Considering Traffic Safety Characteristics (교통안전 특성을 고려한 장대터널 적정길이 제시)

  • Kim, Joong-Hyo;Lee, Jeong-Hwan;Kwon, Sung Dae;Ha, Dong Ik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.203-211
    • /
    • 2014
  • Tunnel reduces travel time as and it is essential facilities for the eco-friendly road construction. In recent years, It has been accelerating the tunnel construction to provide a higher level of traffic service but a driver driving in the narrow and dark tunnel takes characteristically psychological anxiety and the restriction of the sight. Moreover, A driver passing through more than 1,000m long tunnel, as to pass inside the monotonous form of the tunnel for a long time can cause drowsiness and increase the driver load. This driver load can degrade road-holding of the inside of the long tunnel highly and pose a high risk of accidents. Accordingly, In this study is to present the proper length of the Tunnel, considering the characteristics of traffic accident. For this, this study is that the long tunnel that affects traffic safety traffic safety variables are selected and classified. Traffic safety variables are classified in detail as a variable of the traffic accident and velocity one, the applicable variables the number of the traffic accident, the ratio of the traffic accident, driving velocity, the individual vehicle velocity etc. Traffic safety variables are categorized as more than a pole length of the tunnel in order to examine its impact on correlation analysis. The results indicate significant results in traffic accidents in accordance with traffic accidents, traffic safety, selects the variable was Variable depending on the length of the tunnel traffic safety point of significantly increasing the possibility of an accident can be seen as a high point. And the point of the Distribution of selected variables in order to create a traffic safety was a significant increase in traffic safety variables was set at critical intervals. Before reaching the critical point and the corresponding length of the long tunnel was set at the proper length. In this study, the optimum length of the proposed long tunnel through the long tunnel that occur in the future to contribute to reducing traffic accidents would be able to be determined.

Shear strain behaviour due to twin tunnelling adjacent to pile group (군말뚝 기초 하부 병렬터널 굴착 시 전단변형 거동 특성)

  • Subin Kim;Young-Seok Oh;Yong-Joo Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.1
    • /
    • pp.59-78
    • /
    • 2024
  • In tunnel construction, the stability is evaluated by the settlement of adjacent structures and ground, but the shear strain of the ground is the main factor that determines the failure mechanism of the ground due to the tunnel excavation and the change of the operating load, and can be used to review the stability of the tunnel excavation and to calculate the reinforcement area. In this study, a twin tunnel excavation was simulated on a soft ground in an urban area through a laboratory model test to analyze the behavior of the twin tunnel excavation on the adjacent pile grouped foundation and adjacent ground. Both the displacement and the shear strain of ground were obtained using a close-range photogrammetry during laboratory model test. In addition, two-dimensional finite element numerical analysis was performed based on the model test. The results of a back-analysis showed that the maximum shear strain rate tends to decrease as the horizontal distance between the pillars of the twin tunnel and the vertical distance between the toe of the pile group and the crown of the tunnel were decreased. The impact of the second tunnel on the first tunnel and pile group was decreased as the horizontal distance between the pillars of the twin tunnel was increased. In addition, the vertical distance between the toe of the pile group and the crown of the tunnel had a relatively greater impact on the shear strain results than the horizontal distance of the pillars between the twin tunnels. According to the results of the close-range photogrammetry and numerical analysis, the settlement of adjacent pile group and adjacent ground was measured within the design criteria, but the shear strain of the ground was judged to be outside the range of small strain in all cases and required reinforcement.