• Title/Summary/Keyword: Design Project management System

Search Result 667, Processing Time 0.033 seconds

Integrated design system for supporting product development process ($ezDesign^{(R)}$ System) (제품개발 프로세스를 지원하는 통합설계환경)

  • Lee, Sang-Bong;Kim, Su-Ok;Hong, Tae-Hwa
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.357-360
    • /
    • 2001
  • Design Engineering Group, LG Production engineering Research Center has been developing The Integrated Design Environment enabling engineering design task with ease, speedy and accurate for several years targeting the design departments in LG Electronics. $ezDesign^{(R)}$ System is consisted by Engineering Database Management, Engineering Knowledge Management, 3D Design Application, Design Evaluation Method and Project Management. Engineering Database Management manage the design information effectively. Engineering Knowledge Management takes control of design knowledge from design engineering activity systematically. It is possible for the engineering designer to utilized 3D CAD easily by 3D Design Application. Design Evaluation Method can evaluate several design alternatives synthetically. In Project management System, Designer can simulate the project schedule and cost. In this report, We will introduce how design process can be innovated by way of $ezDesign^{(R)}$ System.

  • PDF

A Study on the Effect of PMO Involvement on Project Performance (PMO의 관여도가 프로젝트성과에 미치는 영향에 관한 연구)

  • Won, Jong Ho;Park, So Hyun;Lee, Tae Won;Kim, Seung Chul
    • The Journal of Information Systems
    • /
    • v.32 no.2
    • /
    • pp.109-135
    • /
    • 2023
  • Purpose This study is based on previous studies related to the function and operating system of the project management system for efficient project management. The purpose of the study is, first, to find out how the project performance is affected by the utilization of the project management system and the involvement of the PMO. Second, the mediating effect of implementing integrated management between the project management system and project performance is to be demonstrated. Design/methodology/approach Based on previous studies related to project management, this study designed a research model by integrating functional factors derived from project management system design studies, integrated management factors, and factors derived from PMO function studies. Findings As a result of the empirical analysis, this study first confirmed that high utilization of the project management system and high involvement of the PMO are factors that affect project performance. In addition, it was confirmed that the establishment of the system and the introduction of PMO do not guarantee project performance. Second, it was confirmed that the execution of integrated management has a mediating effect between the system and the project performance, and that the high utilization of the system has a positive effect on the mediating effect.

Design of Architecture for Collaborative Project Management System based on Business Process (프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계)

  • Baek, Jae-Yong;Jung, So-Young;Kim, Bo-Hyun;Yoo, Seock-Kyu;Lee, Seok-Woo;Choi, Hon-Zong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.

Document Management for Jordan Research and Training Reactor Project by ANSIM (원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리)

  • Park, Kook-Nam;Choi, Min-Ho;Kwon, Yongse
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

A Study on the Design-Phase Checklist for Office Project Management (업무공간 프로젝트 매니지먼트의 디자인 단계 체크리스트 개발에 관한 연구)

  • Hwang, Hye-Jeong;Lyu, Ho-Chang
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.5
    • /
    • pp.208-216
    • /
    • 2012
  • The importance of applying project management in interior design has been increased due to recent changes in construction business environment along with market opening which demands more systematized and organized project management system. Yet, project management has not been utilized for interior design industry in Korea. This study intends to define the concept of project management in interior design, categorize tasks of each phase in office design project, and establish a table of elements which should be considered in each task. The table can be utilized as a checklist at the designing site. An in-depth analysis was conducted on the tasks in the Designing phase. In short, this study demonstrates five management phases and nine tasks. The differentiated checklist for office design is discussed in the project management of the Design phase. The checklist established in this study can be used as a practical guideline not only for the clients who are not familiar with management of design project, but also for existing project managers and interior designers. Further studies on management of design projects and development of checklist other than office design is needed.

  • PDF

The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes (국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석)

  • Sohn, Kwon-Joong;Yoo, Wang-Jin;Lee, Cheol-Gyu
    • Journal of Technology Innovation
    • /
    • v.16 no.1
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

Construction for the Design Project Management System(DPMS) (디자인 프로젝트 관리 시스템(DPMS)의 구성)

  • 우흥룡
    • Archives of design research
    • /
    • v.12 no.3
    • /
    • pp.227-234
    • /
    • 1999
  • We paid attention to the fact that a project will always tend to increase in size even if its scope is narrowing. The complexities and multidisciplinary aspects of projects require that the many parts should be put together so that the prime objectives- performance, time, and cost- are met. These aspects lead to the use of teams to solve problems that used to be solved by individuals. Firstly, We surveyed the design companies and their clients on the design projects, and categorized the design task into 5 phases, that are marketing, planning, idea development, presentation, and follow-up. Among the phases, the presentation has the most difficult task, longest processing time, and highest cost, whereas idea development phase has relatively low cost, longer processing time, and more difficult task. Most of the companies used to be faced several bottlenecks on their design projects - time control, budget control, and resource control. Secondly, for improving the project managing process, we adopted that dividing and analyzing the sub critical paths may help in the effective managing.(Badiru, Adedeji B., 1995) Some critical paths require almost as much attention as the critical path since they have a high potential of becoming critical when changes occur in the network. Therefrom we suggest the Total task weight(Gt) as a management formula for the design project management.${Gt=\mathrm{T}\ast\leftthreetimes\ast1/100}$<\TEX> ( Gt = Total task weight, mathrm{T} = Task Weight, \leftthreetimes= Criticality ) Thirdly, In order to support to managing for the design projects, we set up an application system, which is graphically planning and implementing a complex undertaking. It is helpful to make the control of a project easy. The DPMS(Design Project Management System), which has two sub system. One is Project Screening System(PSS), and another Project Managing System(PMS). In PMS, we divided the design project into three modules; Project Planning, Project Implementation, and Project Evaluation. As a result, the DPMS will contribute to supply the control of a project easily and effectively. Also teams are used for making decisions and taking action with the DPMS. But we need to get further studies on the relationships between the whole project and its tasks.

  • PDF

Development of standard logic network for PWR NSSS System design (경수로계통설계 표준 Logic Network의 개발)

  • 박준원;이병령;이판권;이해준;송태길;김동희;최현호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.212-226
    • /
    • 1993
  • The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3&4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project.

  • PDF

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF