• Title/Summary/Keyword: Design Flood Level

Search Result 129, Processing Time 0.024 seconds

Design of Artificial Intelligence Water Level Prediction System for Prediction of River Flood (하천 범람 예측을 위한 인공지능 수위 예측 시스템 설계)

  • Park, Se-Hyun;Kim, Hyun-Jae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.2
    • /
    • pp.198-203
    • /
    • 2020
  • In this paper, we propose an artificial water level prediction system for small river flood prediction. River level prediction can be a measure to reduce flood damage. However, it is difficult to build a flood model in river because of the inherent nature of the river or rainfall that affects river flooding. In general, the downstream water level is affected by the water level at adjacent upstream. Therefore, in this study, we constructed an artificial intelligence model using Recurrent Neural Network(LSTM) that predicts the water level of downstream with the water level of two upstream points. The proposed artificial intelligence system designed a water level meter and built a server using Nodejs. The proposed neural network hardware system can predict the water level every 6 hours in the real river.

Analysis of Intensity-Duration-Quantity (IDQ) Curve for Designing Flood Retention Basin (홍수저류지 설계를 위한 강우강도-지속시간-홍수량(IDQ) 곡선 해석)

  • Kim, Jin Gyeom;Kang, Boosik;Yoon, Byungman
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.1
    • /
    • pp.83-93
    • /
    • 2014
  • This research was carried out for suggesting design criteria and procedure for maximizing flood control capacity by building flood control facilities like flood retention basin built in connection with existing facilities in order to cope with increased uncertainty due to factors such as urbanization and climate change. We suggested the procedure for the analysis under the various scenarios applicable for the cases of determining retention basin capacity as provision for the flood water level increase in main river channel or estimating flood water level reduction effect when retention basin capacity is given. Procedure for estimating design flood hydrograph at any duration using Intensity-Duration-Quantity (IDQ) originated from the existing IDF, and its application example were provided. Based on rainfall estimated by the IDQ analysis, it is possible to calculate an equivalent peak hydrographs under various scenarios, e.g. lower frequency hydrograph under same rainfall duration with water level higher than existing hydrograph, hydrograph with same peak and higher volume due to increased rainfall duration, hydrograph with higher peak and volume than existing hydrograph, etc.

Preliminary Design for Preparing a Natural Learning and Experimental Area in Bukchun and Boundary(II) -Determination of Flood Level/Tree Planting, Analysis of Bukchun Scene- (북천지역 자연학습 체험단지 조성을 위한 기본 계획(II) -홍수위 및 식수결정, 북천 경관분석-)

  • 정종현;최석규;조세환
    • Journal of Environmental Health Sciences
    • /
    • v.28 no.5
    • /
    • pp.13-21
    • /
    • 2002
  • This study analyzed the characteristic of basic river structure, a flood level, the tree planting recommendation and syn thetic design, in order to establish a basic plan for preparing a natural practical area of environmental ecosystem at Bukchun and its surroundings. It was also investigated based on the opinion of citizens, geographical condition and the equipment/utilization examination of Bukchun which were included ecological circumstances, and thus provided a composite item for managing the natural river. This study also considered the development of the river in terms of culture, environment and ecology concept. The results were summarized as followed. Bukchun showed that the speed of a funning fluid is very fast on a period of flood. but very slow in a period of water shortage about 0.02 m/s. To prevent the speed change of a running fluid by a steep slope in a riverbed, there established Dongchun sluice gates under a bridge, including three sluice gates under a bridge, but there occurred extremely a riverbed erosion and corrosion section. The result of comparison between real flood degree and prediction flood data, there should perform a countermeasure the riverbed structure regulation of this area. Also, it was needed an exhaustive flood management in summer. According to the Bukchun and Hyungsangang riverbed investigation, there were needed preparation for natural/practical area and ecology Park development in the future. This study was investigated tree Planting/flower/blossom around the Bukchun and its surroundings. It was recommended willow, Italian poplar, bamboos and cherry blossoms in the Hyungsangang and Bukchun. There exist together historical space, environment space iud have enough possibility both natural learning space and civil rest space. And, it is possible to compose ecology natural learning and experimental area.

Evaluation of flood frequency analysis technique using measured actual discharge data (실측유량 자료를 활용한 홍수량 빈도해석 기법 평가)

  • Kim, Tae-Jeong;Kim, Jang-Gyeong;Song, Jae-Hyun;Kim, Jin-Guk;Kwon, Hyun-Han
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.5
    • /
    • pp.333-343
    • /
    • 2022
  • For water resource management, the design flood is calculated using the flood frequency analysis technique and the rainfall runoff model. The method by design flood frequency analysis calculates the stochastic design flood by directly analyzing the actual discharge data and is theoretically evaluated as the most accurate method. Actual discharge data frequency analysis of the measured flow was limited due to data limitations in the existing flood flow analysis. In this study, design flood frequency analysis was performed using the measured flow data stably secured through the water level-discharge relationship curve formula. For the frequency analysis of design flood, the parameters were calculated by applying the bayesian inference, and the uncertainty of flood volume by frequency was quantified. It was confirmed that the result of calculating the design flood was close to that calculated by the rainfall-runoff model by applying long-term rainfall data. It is judged that hydrological analysis can be done from various perspectives by using long-term actual flow data through hydrological survey.

Flood Frequency Analysis by Wakeby and Kappa Distributions Using L-Moments (Wakeby 및 Kappa 분포의 L-모멘트법에 의한 홍수빈도분석)

  • Maeng, Seung-Jin;Lee, Soon-Hyuk;Lee, Hyeon-Gyu;Ryu, Kyong-Sik;Song, Gi-Heon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.5
    • /
    • pp.17-27
    • /
    • 2006
  • The objective of this study is to induce the design floods by the methodology of L-moment including test of homogeneity, independence and outlier of the data of annual maximum flood flows for 12 water level gaging stations of South Korea. To select appropriate distribution of the data for annual maximum flood flows, the distributions of Wakeby and Kappa are applied and the appropriateness is judged by Kolmogorov-smirnov (K-S) test. The parameters of selected Wakeby and Kappa distributions are calculated by the method of L-moment and the design floods are induced. Through the comparative analysis using the relative root mean square errors (RRMSE) and relative absolute errors (RAE) of design floods, the result shows that the design floods by Wakeby distribution are closer to the observed data than those obtained by the Kappa distribution.

A study on the quick graphical method of flood routing (홍수추적 속산도식해법에 대한 소고)

  • 박정근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.1
    • /
    • pp.4079-4086
    • /
    • 1976
  • In many reservoir projects, economic considerations will necessitate a design utilizing surcharge. Determination of the most economical combination of surcharge and spillway capacity for a given spillway crest level will require flood routing studies and economic studies of the dam-reservoir-spillway combinations. Many methods of actual flood routing have been devised, each of them with its advantages and disadvantages. Some of these methods are listed below: (1) Arithmetical trial-and-error method. (2) Modified Puls' method (3) Cheng's graphical method (4) Horton's arithmetical method (5) Ekadahl's arithmetical method (6) Digital computer programming. For the purpose of preliminary design and cost estimating of dams and spillways, it is often required to estimate, for a given design flood and spillway crest level. the approximate values of two among the three characteristics of the spillway spillway length, maximum discharge and surcharge depth at maximum discharge, when one of these quantities is given. As is well known, the outflow hydrograph for an ungated overflow spillway assumes the form of a wave-shaped curve with a minimum point for Q=o At zero time and a maximum point for Q=Qmax at its intersection with the falling leg of the inflow hydrograph (see Fig. 4) The shaded area between the inflow and outflow hydrographs represents at the approximate scale the temporary retention Vt. In line with the remarks, draw by free hand the assumed outflow hydrograph with its maximum point for the given Qmax (see Fig. 4) and by planimetration find Vt. From the reservoir capacity curve (Fig. 3) find Vs for the given spillway crest level and make V=Vs+Vt. From the above curve find surcharge water elevation for V and surcharge depth Hmax over spillway crest. From the discharge formula compute {{{{L= { Q} over { { CH}^{3/2 } } }}}} The methed provides a means for a quick and fairly accurate estimation of spillway capacity.

  • PDF

A Study on the Impact Range Calculation at the Downstream of Dam (댐이 하류하천에 미치는 영향권 산정에 관한 연구)

  • Park, Bong-Jin;Kim, Hyeon-Sik;Jung, Kwan-Sue;Ji, Hong-Ki
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.10
    • /
    • pp.1009-1021
    • /
    • 2008
  • In this study, 4 indices of hydraulic & hydrological, geomorphological, eco & environmental, social effect and 38 items are selected to calculate impact range of downstream of dam. The Analytic Hierarchy Process(AHP) was applied to determine the priority of impact range calculation indices and items. As results of indices valuation, hydraulic & hydrological effect is the first priority, the second is eco & environmental, next are geomorphological and social effect. As results of items valuation, the design flood of dam is the first priority, the second is the natural flood & design flood of channel, next are the design flood rate of channel, drainage area and back water level caused by downstream of dam. In the case of Daechung dam, impact ranges were estimated 47.21 km in terms of the design flood of dam, 45.71 km of the design flood rate of channel, 13.94 km of the drainage area.

Analysis of Flood Level Changes by Creating Nature-based Flood Buffering Section (자연성기반 홍수완충공간 조성에 따른 홍수위 변화 분석)

  • Ryu, Jiwon;Ji, Un;Kim, Sanghyeok;Jang, Eun-kyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.735-747
    • /
    • 2023
  • In recent times, the sharp increase in extreme flood damages due to climate change has posed a challenge to effectively address flood-related issues solely relying on conventional flood management infrastructure. In response to this problem, this study aims to consider the effectiveness of nature-based flood management approaches, specifically levee retreat and relocation. To achieve this, we utilized a 1D numerical model, HEC-RAS, to analyze the flood reduction effects concerning floodwater levels, flow velocities, and time-dependent responses to a 100-year frequency flood event. The analysis results revealed that the effect of creating a flood buffer zone of the nature-based solution extends from upstream to downstream, reducing flood water levels by up to 30 cm. The selection of the flow roughness coefficient in consideration of the nature-based flood buffer space creation characteristics should be based on precise criteria and scientific evidence because it is sensitive to the flood control effect analysis results. Notably, floodwater levels increased in some expanded floodplain sections, and the reduction in flow velocities varied depending on the ratio of the expanded cross-sectional area. In conclusion, levee retreat and floodplain expansion are viable nature-based alternatives for effective flood management. However, a comprehensive design approach is essential considering flood control effects, flow velocity reduction, and the timing of peak water levels. This study offers insights into addressing the challenges of climate-induced extreme flooding and advancing flood management strategies.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

Impact spectrum of flood hazard on seismic vulnerability of bridges

  • Yilmaz, Taner;Banerjee, Swagata
    • Structural Engineering and Mechanics
    • /
    • v.66 no.4
    • /
    • pp.515-529
    • /
    • 2018
  • Multiple hazards (multihazard) conditions may cause significant risk to structures that are originally designed for individual hazard scenarios. Such a multihazard condition arises when an earthquake strikes to a bridge pre-exposed to scour at foundations due to flood events. This study estimates the impact spectrum of flood-induced scour on seismic vulnerability of bridges. Characteristic river-crossing highway bridges are formed based on the information obtained from bridge inventories. These bridges are analyzed under earthquake-only and the abovementioned multihazard conditions, and bridge fragility curves are developed at component and system levels. Research outcome shows that bridges having pile shafts as foundation elements are protected from any additional seismic vulnerability due to the presence of scour. However, occurrence of floods can increase seismic fragility of bridges at lower damage states due to the adverse impact of scour on bridge components at superstructure level. These findings facilitate bridge design under the stated multihazard condition.